期刊文献+
共找到677篇文章
< 1 2 34 >
每页显示 20 50 100
A novel control method of automatically formed roadway by roof cutting and confined concrete column in extremely close-distance coal seam
1
作者 XUE Hao-jie WANG Qi +4 位作者 ZHANG Chong HE Man-chao ZHANG Bo-wen ZHANG Shu WANG Ye-tai 《Journal of Central South University》 2025年第10期3911-3926,共16页
Under the influence of the upper coal pillars and dynamic pressure of coal mining,the roadway of the lower coal seam is prone to large deformation failure.In this paper,a novel control method and key technologies of a... Under the influence of the upper coal pillars and dynamic pressure of coal mining,the roadway of the lower coal seam is prone to large deformation failure.In this paper,a novel control method and key technologies of automatically formed roadway(AFR)by roof cutting and confined concrete column in extremely close-distance coal seam are proposed.Furthermore,a numerical model is established to analyze the structure characteristics of overlying roof strata.Based on numerical results,the roof structure model of“voussoir beam of upper layer+short cantilever beam of lower layer”of this method is proposed.What’s more,the calculation equation of the roof bending moment and evaluation indexes is established,and the influence of different factors on roof stability control of AFR is studied.Finally,a field test is conducted to verify the effectiveness of this novel method.Field results were as follows:1)The maximum and average support stress of working face obviously decreased;2)The confined concrete column can provide high-strength support in dynamic influence zone;3)The maximum deformation of AFR safety requirement can be met.This study can provide effective guidance for the application of this method in extremely close-distance coal seam. 展开更多
关键词 extremely close-distance coal seam automatically formed roadway(AFR) confined concrete column numerical simulation roof structure model field test
在线阅读 下载PDF
Green Roof Performance for Stormwater Management in Equatorial Urban Areas Using Storm Water Management Model (SWMM)
2
作者 King Kuok Kuok Po Chan Chiu +2 位作者 Mei Yun Chin Md. Rezaur Rahman Muhammad Khusairy Bakri 《Journal of Water Resource and Protection》 2023年第12期706-720,共15页
Many Low Impact Developments (LIDs) have recently been developed as a sustainable integrated strategy for managing the quantity and quality of stormwater and surrounding amenities. Previous research showed that green ... Many Low Impact Developments (LIDs) have recently been developed as a sustainable integrated strategy for managing the quantity and quality of stormwater and surrounding amenities. Previous research showed that green roof is one of the most promising LIDs for slowing down rainwater, controlling rainwater volume, and enhancing rainwater quality by filtering and leaching contaminants from the substrate. However, there is no guideline for green roof design in Malaysia. Hence, Investigating the viability of using green roofs to manage stormwater and address flash flood hazards is urgently necessary. This study used the Storm Water Management Model (SWMM) to evaluate the effectiveness of green roof in managing stormwater and improving rainwater quality. The selected study area is the multistory car park (MSCP) rooftop at Swinburne University of Technology Sarawak Campus. Nine green roof models with different configurations were created. Results revealed that the optimum design of a green roof is 100 mm of berm height, 150 mm of soil thickness, and 50 mm of drainage mat thickness. With the ability to reduce runoff generation by 26.73%, reduce TSS by 89.75%, TP by 93.07%, TN by 93.16%, and improved BOD by 81.33%. However, pH values dropped as low as 5.933 and became more acidic due to the substrates in green roof. These findings demonstrated that green roofs improve water quality, able to temporarily store excess rainfall and it is very promising and sustainable tool in managing stormwater. 展开更多
关键词 Green roof Low Impact Development (LID) Storm Water Management model (SWMM) Storage Capacity Pollutants Removal
在线阅读 下载PDF
Mode of overlying rock roofing structure in large mining height coal face and analysis of support resistance 被引量:2
3
作者 吴锋锋 刘长友 杨敬轩 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第12期3262-3272,共11页
The mining space of large mining height coal face is large,the range of movement and caving of rock strata is large and the stability of supports at coal face is low and damage rate of supports is high,which significa... The mining space of large mining height coal face is large,the range of movement and caving of rock strata is large and the stability of supports at coal face is low and damage rate of supports is high,which significantly affects the safe and efficient production of coal mines.By similar simulation experiment and theoretical analysis,the mode of fractured roofing structure of large mining height coal face and the method of determination of reasonable support resistance of the support was evaluated.Analysis shows that the structural mode of "combined cantilever beam – non-hinged roofing – hinged roofing" of the large mining height coal face appears at the roofing of large mining height coal face.The supporting factor of caved gangue at the gob is introduced,the calculating equations of the fractured step distance of roofing were derived and conventional calculating method of caved height of roofing was corrected and the method of determination of the length and height of each structural area of the roofing was provided.With reference to the excavating conditions at Jinhuagong coal mine in Datong minefield,the dimensions of structural areas of the roofing of the coal face were determined and analyzed,and reasonable support resistance of the height coal face was acquired.By selecting Model ZZ13000/28/60 support and with procedures of advanced pre-cracking blasting,the safe production of large mining height coal face was assured. 展开更多
关键词 large mining height roof structure roof model roof fracturing distance support resistance
在线阅读 下载PDF
大跨度空间网架结构屋盖隔震参数化分析
4
作者 周宇航 黄襄云 +1 位作者 张颖 侯纪帆 《华南地震》 2026年第1期94-102,共9页
针对大跨度空间结构采用屋盖隔震设计时会引起下部框架结构响应增大的问题,利用简化三质点模型运动方程,采用拉普拉斯变换推导了结构的传递函数,对比了抗震结构、屋盖隔震结构和TMD结构在不同激励频率下的响应。通过调整上部屋盖结构的... 针对大跨度空间结构采用屋盖隔震设计时会引起下部框架结构响应增大的问题,利用简化三质点模型运动方程,采用拉普拉斯变换推导了结构的传递函数,对比了抗震结构、屋盖隔震结构和TMD结构在不同激励频率下的响应。通过调整上部屋盖结构的质量,对比分析了屋盖隔震结构在不同质量比下的地震动响应。当屋盖结构质量较小,如质量比μm3为3%、5%、6%时,屋盖结构自振频率不等于结构一阶自振频率时,达不到调谐减震,同时质量较小不能有效延长结构周期,会导致下部框架结构地震作用力增大。当屋盖结构质量较小,如质量比μm3为3%、5%、6%时,通过改变刚度使得屋盖结构频率接近结构一阶自振频率可以使得下部框架结构地震作用力减小,达到调谐减震的效果,类似于TMD,但同时屋盖结构地震作用力会增大,对网架结构不利,但通过增大屋盖结构质量,质量比μm3为30%时会出现下部框架结构响应减小,此时是通过延长结构周期实现。 展开更多
关键词 屋盖隔震 简化三质点模型 频率范围 屋盖结构质量
在线阅读 下载PDF
某铜镍矿高品位底柱超前回采与人工假顶构筑研究
5
作者 冯福康 杨甜滋 +2 位作者 刘东锐 盖向阳 马磊 《矿业研究与开发》 北大核心 2026年第1期79-89,共11页
针对某铜镍矿因备采中段和采场数量不足、出矿品位波动大等导致的高品位底柱回采难题,提出了3种回采技术方案:盘区机械化上向进路充填采矿法、下向进路充填采矿法、上向进路+分条中深孔联合采矿法,通过综合对比分析各方案优缺点及技术... 针对某铜镍矿因备采中段和采场数量不足、出矿品位波动大等导致的高品位底柱回采难题,提出了3种回采技术方案:盘区机械化上向进路充填采矿法、下向进路充填采矿法、上向进路+分条中深孔联合采矿法,通过综合对比分析各方案优缺点及技术经济指标,确定盘区机械化上向进路充填采矿法为最优方案。基于古典杨森散体压力理论计算底柱压覆荷载,并采用简支梁、软支弱板力学模型分析人工假顶厚度与最大压应力之间的关系。综合考虑人工假顶构筑形式和胶凝材料力学性能,确定了人工假顶的充填构筑参数:假顶厚度7.0 m,充填体28 d强度为4.5 MPa。针对人工假顶构筑中存在的质量、安全与成本问题,通过优化构筑方案,确定当人工假顶作为下部采场10 m顶柱的直接顶板时(优化方案一)为最佳方案,人工假顶采用底筋-腰筋-顶筋组合的配筋设计方案。应用结果表明,该底柱回采方案切实可行,底柱采场盘区生产能力提升至276 t/d,矿柱回采率达82%,采场地压活动稳定,人工假顶构筑工艺操作性强、安全可靠,实现了底柱资源的安全高效回采,为同类矿山底柱回采工作提供了技术借鉴。 展开更多
关键词 高品位底柱 超前回采 人工假顶 力学模型 方案优化 配筋设计
原文传递
基于两相流模型的大跨屋面风吹雪数值模拟分析
6
作者 康佳鑫 王平山 徐晓明 《建筑钢结构进展》 北大核心 2026年第2期46-55,共10页
风吹雪引起的积雪不均匀分布是大跨屋面雪灾下破坏的主要原因之一,现有规范中未考虑风速、风向对屋面雪荷载分布的影响,本文基于两相流模型,对某大型体育场屋面风致雪漂移进行数值模拟,研究不同风速、风向下屋面积雪的不均匀分布情况,... 风吹雪引起的积雪不均匀分布是大跨屋面雪灾下破坏的主要原因之一,现有规范中未考虑风速、风向对屋面雪荷载分布的影响,本文基于两相流模型,对某大型体育场屋面风致雪漂移进行数值模拟,研究不同风速、风向下屋面积雪的不均匀分布情况,讨论屋面形状对积雪分布的影响。结果表明:风速不变时,位于屋面背风侧的雪颗粒发生沉积,侧风面的雪颗粒被侵蚀;低风速下,屋面积雪分布趋于均匀,受来流风向影响较小;高风速时,屋面积雪不均匀分布明显,在不同风向下,同一区域可能处于完全侵蚀或积雪沉积两种不同状态;随风速增大,屋面积雪侵蚀面积增大,相比日平均风速,50年重现期风速作用下屋面积雪总量减少1/3,但局部最不利雪压增大两倍以上。大跨屋面的雪荷载分布受风速、风向影响较大,结构设计时有必要综合考虑不同风速、风向对雪荷载的影响。 展开更多
关键词 风致雪漂移 大跨屋面 两相流模型 数值模拟 积雪不均匀分布 侵蚀 沉积
原文传递
基于耦合模型的古建筑屋顶破损检测研究
7
作者 兰楷 万程辉 +2 位作者 喻文杰 陈安邦 李凤慧 《智能城市》 2026年第1期1-6,共6页
针对古建筑屋顶破损检测中大尺度的遥感图像和密集场景出现漏检和误检的问题,文章提出Mask R-CNN+YOLO v8 Pro检测混合模型,融合Mask R-CNN和改进后的YOLO v8,将Mask R-CNN提取的古建筑图像作为YOLO v8的输入,在YOLO v8网络中引入大尺... 针对古建筑屋顶破损检测中大尺度的遥感图像和密集场景出现漏检和误检的问题,文章提出Mask R-CNN+YOLO v8 Pro检测混合模型,融合Mask R-CNN和改进后的YOLO v8,将Mask R-CNN提取的古建筑图像作为YOLO v8的输入,在YOLO v8网络中引入大尺度检测头和混洗注意力(SA)机制,以增强模型对小目标特征的提取能力和关键信息的关注度。在自制数据集上进行模型训练与对比实验。结果显示,在检测四类屋顶破损(破洞、植物根系侵蚀、杂物、瓦片移动)方面,Mask R-CNN+YOLO v8 Pro的mAP@0.5达到64.9%,优于传统单一的检测模型。与其他耦合模型(Mask RCNN+YOLO v5、Mask R-CNN+YOLO v8)相比,mAP@0.5分别提升13.3和12.1个百分点。研究表明,Mask R-CNN+YOLO v8 Pro能够更有效地提取小目标的特征信息与关注图像中的感兴趣区域,从而减少漏检和误检现象的发生。 展开更多
关键词 古建筑屋顶 破损检测 耦合模型 检测模型 分割模型
在线阅读 下载PDF
Stability analysis of subgrade cave roofs in karst region 被引量:6
8
作者 蒋冲 赵明华 曹文贵 《Journal of Central South University》 SCIE EI CAS 2008年第S2期38-44,共7页
According to the engineering features of subgrade cave roof in karst region, the clamped beam model of subgrade cave roof in karst region was set up. Based on the catastrophe theory, the cusp catastrophe model for bea... According to the engineering features of subgrade cave roof in karst region, the clamped beam model of subgrade cave roof in karst region was set up. Based on the catastrophe theory, the cusp catastrophe model for bearing capacity of subgrade cave roof and safe thickness of subgrade cave roof in karst region was established. The necessary instability conditions of subgrade cave roof were deduced, and then the methods to determine safe thickness of cave roofs under piles and bearing capacity of subgrade cave roof were proposed. At the same time, a practical engineering project was applied to verifying this method, which has been proved successfu1ly. At last, the major factors that affect the stability on cave roof under pile in karst region were deeply discussed and some results in quality were acquired. 展开更多
关键词 pile foundation KARST SUBGRADE CAVE roof CUSP CATASTROPHE model stability
在线阅读 下载PDF
Influence of canopy ratio of powered roof support on longwall working stability——A case study 被引量:1
9
作者 Sylwester Rajwa Tomasz Janoszek Stanis?aw Prusek 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2019年第4期591-598,共8页
The case study describes longwall coal seam A in a hard coal mine,where longwall coal face stability loss and periodic roof fall occurrences had been registered.The authors have attempted to explain the situation base... The case study describes longwall coal seam A in a hard coal mine,where longwall coal face stability loss and periodic roof fall occurrences had been registered.The authors have attempted to explain the situation based on in-situ measurements and observations of the longwall working as well as numerical simulation.The calculations included several parameters,such as powered roof support geometry in the form of the canopy ratio,which is a factor that influences load distribution along the canopy.Numerical simulations were realized based on a rock mass model representing realistic mining and geological conditions at a depth of 600 m below surface for coal seam A.Numerical model assumptions are described,while the obtained results were compared with the in-situ measurements.The conclusions drawn from this work can complement engineering knowledge utilized at the stage of powered roof support construction and selection in order to improve both personnel safety and longwall working stability,and to achieve better extraction. 展开更多
关键词 COAL MINING modelling Powered roof supports LONGWALL workings Safety STABILITY
在线阅读 下载PDF
Validation of critical strain technique for assessing stability of coal mine intersections and its potential for development of roof control plans 被引量:1
10
作者 S.Sinha Y.P.Chugh 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第2期380-389,共10页
Both room-and-pillar and longwall mining systems develop underground excavations whose stability must be ensured over their entire service life. Even though rock bolts have been extensively used as a support element i... Both room-and-pillar and longwall mining systems develop underground excavations whose stability must be ensured over their entire service life. Even though rock bolts have been extensively used as a support element in US coal mines for about 40 years, limited research has been conducted in quantifying its composite reinforcement effects. Recently, the authors suggested an approach to quantify the reinforcement effect of roof supports over a designated area based on critical failure strains in tension, compression and shear. This paper validates the critical strain technique(CST) using a case study and justifies the magnitude of selected critical strain by corroborating with the US roof fall statistics. Intersections are vulnerable to failure due to the larger exposed roof span and associated stress concentrations. Through numerical application of the CST to a case study, it was demonstrated that modifying the opening orientation and installing reinforcement at critical locations can help to improve the overall stability of intersections. 展开更多
关键词 roof support Critical strain approach Numerical modeling
在线阅读 下载PDF
基于透明水文地质模型的工作面顶板水害预警研究 被引量:8
11
作者 连会青 晏涛 +4 位作者 尹尚先 徐斌 康佳 周旺 闫国成 《煤炭科学技术》 北大核心 2025年第1期259-271,共13页
我国西部矿区因地质条件复杂,煤层顶板水害问题日渐突出,传统水害预警手段难以有效应对这一挑战。为解决水害预警中指标选取、预警方法及标准构建等核心问题,系统开展了顶板水害预警的基础理论研究、关键技术分析及智能化平台建设工作... 我国西部矿区因地质条件复杂,煤层顶板水害问题日渐突出,传统水害预警手段难以有效应对这一挑战。为解决水害预警中指标选取、预警方法及标准构建等核心问题,系统开展了顶板水害预警的基础理论研究、关键技术分析及智能化平台建设工作。首先,在传统透明地质模型基础上提出了透明水文地质模型的概念,引入动态更新功能并明确其设计实现思路;其次,基于顶板水害发育“3阶段”机理分析,提出指标选择应遵循约束性、独立性和持续性“3原则”,确定了地表水特征、含水层结构及性质、隔水层结构及性质、采动影响围岩运移特征及水文要素动态变化特性5大类主要影响因素,共从中提取出14项可量化指标构成顶板水害预警指标体系;根据已有事故案例、现场水文观测数据变化规律和相关标准规范,提出由4个预警指标参与的智能水害预警方法,划分出4个等级的预警级别、标准和应对措施;以透明水文地质模型为逻辑底层,内嵌预警指标、方法、标准和多态接口,集成开发了具备3个层级、6个核心功能的顶板水害智能化预警平台,该平台通过触发器和轮询的混合预警机制,实现了多指标综合评价与预警;最后,平台在西部某煤矿进行了为期1 a的示范应用,期间成功发出15次预警信息,其中10次为监测设备异常预警,5次为水害信息预警,所有预警均提前采取了有效应对措施。结果表明:该平台的应用验证了预警指标、方法、标准和平台的有效性与适用性。未来的研究可进一步优化预警模型和数据分析方法,以提升平台的预警精度和响应速度。 展开更多
关键词 透明水文地质模型 顶板水害 预警指标体系 预警方法 智能化预警平台
在线阅读 下载PDF
基于低位覆岩结构力学解析的特厚煤层大采高综放工作面支架工作阻力计算方法 被引量:2
12
作者 郭军 王子 +9 位作者 冯国瑞 段宏飞 白锦文 李丽绒 文晓泽 皇文博 张洁 杨龙龙 刘全 张家豪 《煤炭学报》 北大核心 2025年第S1期98-111,共14页
为探究特厚煤层对超大采高综放工作面液压支架的压架机理和工作阻力计算方法,以大同矿区塔山井田为背景,通过相似模拟试验和理论分析研究了特厚煤层大采高综放采场上覆岩层结构特征及其演化规律,建立了上覆岩层“组合简支梁”和“砌体... 为探究特厚煤层对超大采高综放工作面液压支架的压架机理和工作阻力计算方法,以大同矿区塔山井田为背景,通过相似模拟试验和理论分析研究了特厚煤层大采高综放采场上覆岩层结构特征及其演化规律,建立了上覆岩层“组合简支梁”和“砌体梁”的结构模型,并对其进行了力学解析,研究结果表明:特厚煤层综放开采空间大,覆岩受影响范围广,上覆岩层存在多层厚硬岩层时,在高位易形成砌体梁结构,低位岩层形成“组合悬臂梁”结构,随着工作面推进,该结构先后经历了“回转—分离—反向回转—滑落”的运动过程。组合悬臂梁发生破断后向采空区一侧发生回转并对液压支架产生变形压力,随后“组合悬臂梁”结构发生滑动分离,形成“组合简支梁”结构,并将上覆岩层的荷载通过顶煤传递至工作面液压支架,当荷载大于支架工作阻力时易引发压架事故。通过力学分析,获得了“组合简支梁”结构任意层位岩层煤壁侧支撑力的表达式,并依次迭代获得该结构作用于支架上方顶煤处的压力,提出了低位“组合简支梁”结构作用下的特厚煤层超大采高综放工作面液压支架工作阻力的计算方法。其中“组合简支梁”结构作用于液压支架上的荷载由结构中各岩梁的厚度、长度、破断角和回转角决定。上述研究结果为进一步分析特厚煤层超大采高综放开采工作面支架围岩关系这一矿压控制的核心问题提供理论依据,对特厚煤层智能化超大采高开采设备的选型和自动控制有一定借鉴意义。 展开更多
关键词 特厚煤层 超大采高 覆岩结构 相似模拟 工作阻力
在线阅读 下载PDF
煤矿综采工作面顶板管理技术
13
作者 孟应杰 《凿岩机械气动工具》 2026年第2期121-123,共3页
为提升综采工作面顶板管理的精准性与安全性,借助地质力学参数原位测试精准识别顶板岩性结构,分析综采工作面顶板核心支护技术,包括主动支护技术、被动支护技术及特殊工况下的顶板联合支护技术,搭建多参数监测系统并构建失稳预警模型,... 为提升综采工作面顶板管理的精准性与安全性,借助地质力学参数原位测试精准识别顶板岩性结构,分析综采工作面顶板核心支护技术,包括主动支护技术、被动支护技术及特殊工况下的顶板联合支护技术,搭建多参数监测系统并构建失稳预警模型,以期为综采工作面安全、高效生产提供技术保障。 展开更多
关键词 综采工作面 顶板管理技术 多参数监测系统 失稳预警模型
在线阅读 下载PDF
Effects of Street-Bottom and Building-Roof Heating on Flow in Three-Dimensional Street Canyons 被引量:3
14
作者 Jae-Jin KIM Jong-Jin BAIK 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2010年第3期513-527,共15页
Using a computational fluid dynamics (CFD) model, the effects of street-bottom and building-roof heating on flow in three-dimensional street canyons are investigated. The building and street-canyon aspect ratios are... Using a computational fluid dynamics (CFD) model, the effects of street-bottom and building-roof heating on flow in three-dimensional street canyons are investigated. The building and street-canyon aspect ratios are one. In the presence of street-bottom heating, as the street-bottom heating intensity increases, the mean kinetic energy increases in the spanwise street canyon formed by the upwind and downwind buildings but decreases in the lower region of the streamwise street canyon. The increase in momentum due to buoyancy force intensifies mechanically induced flow in the spanwise street canyon. The vorticity in the spanwise street canyon strengthens. The temperature increase is not large because relatively cold above-roof-level air comes into the spanwise street canyon. In the presence of both street-bottom and building-roof heating, the mean kinetic energy rather decreases in the spanwise street canyon. This is caused by the decrease in horizontal flow speed at the roof level, which results in the weakening of the mean flow circulation in the spanwise street canyon. It is found that the vorticity in the spanwise street canyon weakens. The temperature increase is relatively large compared with that in the street-bottom heating case, because relatively warm above-roof-level air comes into the spanwise street canyon. 展开更多
关键词 street canyon flow CFD model street-bottom heating building-roof heating mean kineticenergy vorticity
在线阅读 下载PDF
基于SCS模型绿色屋顶径流系数变化模拟 被引量:1
15
作者 张启照 申红彬 《中国农村水利水电》 北大核心 2025年第3期8-13,共6页
绿色屋顶作为城市低影响开发与海绵城市建设的重要基础设施之一,如何建立一种简单实用的降雨径流计算方法,并以径流系数为重要指标,进而评价其降雨径流削减效应是一个重要的问题。根据绿色屋顶不同场次降雨径流实测数据,在SCS模型降雨... 绿色屋顶作为城市低影响开发与海绵城市建设的重要基础设施之一,如何建立一种简单实用的降雨径流计算方法,并以径流系数为重要指标,进而评价其降雨径流削减效应是一个重要的问题。根据绿色屋顶不同场次降雨径流实测数据,在SCS模型降雨径流深计算公式的基础上,进一步推导建立了径流系数的计算表达式,并采用事件分析法,通过合理确定初损量以反推计算当时可能最大滞留量,分析当时可能最大滞留量随时间的变化规律。结果表明,初损量与当时可能最大滞留量基本呈线性关系,平均初损率约为0.28;当时可能最大滞留量在降雨期受雨水截留作用会有所减小,随后在非降雨期逐步得到恢复,且总体呈现出初始恢复速率较快、随后逐渐降低、最后趋近于0的变化趋势,据此推导建立了当时可能最大滞留量随时间(包括降雨期与非降雨期)变化的计算表达式。基于SCS模型径流深与径流系数计算公式,结合绿色屋顶当时可能最大滞留量随时间变化的计算表达式,对绿色屋顶不同场次降雨径流深与径流系数进行连续演算模拟,并分别采用确定性系数R2与Nash-Sutcliffe效率系数NSE对模型效果进行评价。结果表明,不同场次降雨径流深与径流系数计算值与实测值的变化趋势基本吻合,相应R2值分别为0.93、0.85,NSE值分别为0.94、0.85,具有良好的模拟效果。 展开更多
关键词 绿色屋顶 SCS模型 事件分析法 当时可能最大滞留量 径流系数
在线阅读 下载PDF
水轮机顶盖模拟对水电站厂房结构动力响应的影响研究
16
作者 伍鹤皋 闫宇鹏 +3 位作者 唐晓丹 白治朋 傅丹 孙海清 《中国农村水利水电》 北大核心 2025年第9期166-170,共5页
发电机层楼板是水电站厂房运行人员和设备最集中的地方,同时也是厂房结构抗振相对薄弱的部位,对于水电站的长期稳定运行至关重要。建立了发电机层楼板和水轮机顶盖实际模型,对蜗壳和尾水管流道内脉动压力及机组振动荷载作用下的动力响... 发电机层楼板是水电站厂房运行人员和设备最集中的地方,同时也是厂房结构抗振相对薄弱的部位,对于水电站的长期稳定运行至关重要。建立了发电机层楼板和水轮机顶盖实际模型,对蜗壳和尾水管流道内脉动压力及机组振动荷载作用下的动力响应进行了数值分析,并与传统模拟情况下发电机层楼板结构动力响应进行了比较。研究结果表明,发电机层楼板装修层对于楼板结构的振动响应影响很小,厂房抗振分析时采用无装修层模型(仅考虑其质量)进行计算即可满足精度要求。对顶盖钢结构进行实际建模,并考虑顶盖区脉动压力作用方式,可以使厂房结构动力响应计算结果比传统模型精度更高,与厂房振动实测响应数据更加接近。因此为了提高数值计算结果精度,建议在进行厂房动力响应数值分析时,有必要包括顶盖结构在内进行整体模拟。 展开更多
关键词 水电站厂房 水轮机顶盖 计算模型 动力响应 数值分析
在线阅读 下载PDF
煤矿井下顶板突水征兆视频智能识别方法研究 被引量:2
17
作者 连会青 康佳 +4 位作者 尹尚先 徐斌 闫国成 夏向学 徐保同 《煤矿安全》 北大核心 2025年第4期166-173,共8页
煤矿井下突水事故是煤矿灾害组成部分之一,而顶板突水征兆识别是预防突水事故发生的重要环节。然而,煤矿井下环境复杂多变,且目前突水征兆主要靠人工判断发现,由于井下恶劣环境及人为主观因素的影响,导致很难及时发现异常,致使顶板突水... 煤矿井下突水事故是煤矿灾害组成部分之一,而顶板突水征兆识别是预防突水事故发生的重要环节。然而,煤矿井下环境复杂多变,且目前突水征兆主要靠人工判断发现,由于井下恶劣环境及人为主观因素的影响,导致很难及时发现异常,致使顶板突水征兆的有效识别存在困难。为了高效监测与准确识别突水征兆,基于图像识别处理技术,提出了1种基于SAMXMem的自监督煤矿顶板突水征兆识别方法,其利用像素点变化率构建突水征兆预警体系,对煤矿井下突水易发区域采集到图像进行自监督标记,并通过SAM模型分割突水征兆区域,结合XMem长视频分割框架实现对该区域的实时动态跟踪。试验结果表明:相较于传统OTSU算法,基于SAM-XMem的自监督识别算法在交并比(IoU)、精确率(P)、召回率(R)及F1分数上均表现出一定差异性,该算法各项评估指标均达90%以上,较传统算法识别率提升20%;通过零样本分割技术,可以克服煤矿井下数据集短缺问题,相较于传统方法,特征提取能力更强,在背景噪声多、灰度值差异小等复杂条件下效果更优,适用于煤矿井下环境,具有更高的识别精度和更强的泛化能力。 展开更多
关键词 矿井水害 顶板突水 突水征兆 SAM模型 图像分割技术
在线阅读 下载PDF
厚硬顶板10 m超大采高工作面煤壁片帮特征及影响因素 被引量:3
18
作者 马镕山 徐刚 +3 位作者 任建超 张震 刘前进 蔺星宇 《采矿与岩层控制工程学报》 北大核心 2025年第1期191-205,共15页
针对超大采高工作面易发生煤壁片帮的问题,以曹家滩煤矿122104超大采高工作面为背景,综合运用现场监测、数值模拟和理论分析等方法,研究了不同顶板压力条件下超大采高工作面煤壁塑性区、应力及位移分布特征,建立了煤壁片帮力学模型,确... 针对超大采高工作面易发生煤壁片帮的问题,以曹家滩煤矿122104超大采高工作面为背景,综合运用现场监测、数值模拟和理论分析等方法,研究了不同顶板压力条件下超大采高工作面煤壁塑性区、应力及位移分布特征,建立了煤壁片帮力学模型,确定了煤壁挠度最大点位置,揭示了顶板压力变化对煤壁稳定性作用机理。研究结果表明:煤壁破坏以拉裂为主,且多发生在中部或中上部区域,其形态通常呈现为半月状内凹或台阶状,煤壁平均片帮深度为0.41 m,最大片帮深度平均为1.53 m,片帮层位主要出现在底板上方4.4~8.0 m高度范围内,煤壁片帮程度与顶板压力成直接相关性,周期来压期间片帮加剧。初次来压后形成悬臂梁及组合悬臂梁结构,随着工作面的推进,顶板垮落和煤壁破坏加重,超前支承压力峰值及应力集中系数显著上升,工作面煤壁片帮与矿压显现成正相关关系。数值模拟结果显示,随着开采深度的增加,顶板压力增大,煤壁稳定性降低。不同埋深下的煤壁压力对煤壁挠度表现出非对称特性,煤壁挠度随埋深的增加而增大,煤壁最大挠度位置随埋深的增加而沿煤壁逐步上移,最大变形区域在0.59~0.94倍采高处。 展开更多
关键词 超大采高工作面 煤壁片帮 顶板压力 煤壁力学模型 数值模拟
在线阅读 下载PDF
基于随钻数据的岩体强度预测模型及其适配性评价 被引量:1
19
作者 赵志强 王箫鹤 武璟 《煤炭学报》 北大核心 2025年第10期4743-4758,共16页
为了研究在锚杆钻机钻进过程中实时识别顶板岩层强度及结构状态,为巷道掘进过程中进行顶板隐患探测提供技术途径,采用综合研究手段,揭示了不同强度岩体及组合岩体的钻进信号响应规律,研究了基于钻进数据的岩体强度表征及预测模型,并对... 为了研究在锚杆钻机钻进过程中实时识别顶板岩层强度及结构状态,为巷道掘进过程中进行顶板隐患探测提供技术途径,采用综合研究手段,揭示了不同强度岩体及组合岩体的钻进信号响应规律,研究了基于钻进数据的岩体强度表征及预测模型,并对比评估了其适配性。结果表明:推力、扭矩及转速等信号对围岩强度的变化具有较强的响应性,与岩层结构变化呈现一致性,三轴振动对岩体强度的响应性较不明显,但在岩层界面处信号突变显著;各表征参量及其强度表征值趋势与钻进信号趋势基本保持一致,基于钻头单位体积研磨能的单轴抗压强度表征模型与真实值偏离度最小(适配性最优);推力及扭矩与除三轴振动之外的其他参量均呈现较为明显的线性正相关关系,转速也同样具有较为明显的线性相关关系,但与除可钻性指数外其他特征均呈负相关趋势,三轴振动中,X方向与Y方向振动与其余各特征相关性程度较小,但仍存在一定相关性,其中Z方向振动中相关性程度极小。Attention-CNN模型在鲁棒性、准确率和适配性上表现最优,预测值与由单轴压缩实验所得的真实值之间决定系数R^(2)达0.94,拟合度最高,在岩体单轴抗压强度预测上预测精度较其他模型的模型精度至少超出12%,研究成果为巷道顶板岩层强度实时感知及支护决策提供了理论与技术支撑。 展开更多
关键词 巷道顶板 随钻探测 岩层识别 回归预测模型 强度表征模型
在线阅读 下载PDF
蒙陕接壤区煤炭开采过程中矿井水来源 被引量:3
20
作者 杨建 李慧 《煤炭学报》 北大核心 2025年第2期1263-1275,共13页
蒙陕接壤区作为我国能源安全的核心保障区域,同样也是黄河流域生态保护和高质量发展的关键地带。该区域煤炭资源的高强度开采可能对生态环境造成重大影响,尤其是对地表以下浅层第四系含水层的破坏。由于难以精确评估顶板各含水层的渗漏... 蒙陕接壤区作为我国能源安全的核心保障区域,同样也是黄河流域生态保护和高质量发展的关键地带。该区域煤炭资源的高强度开采可能对生态环境造成重大影响,尤其是对地表以下浅层第四系含水层的破坏。由于难以精确评估顶板各含水层的渗漏情况,这增加了制定科学、有效的保水采煤策略的难度。本研究基于对蒙陕接壤区地下水中环境同位素(D和18O)的检测与分析,应用同位素质量守恒原理,计算了矿井水水源的相对贡献量。研究发现,各含水层水中的环境同位素受地形地貌、地层结构和地下水赋存等因素的影响。研究区的第四系地下水主要来源于大气降水和地表水,具有快速的循环更替速度,表现为富含氚的现代水补给特征,其δD值和δ^(18)O值大气降水和地表水相近。深埋区的白垩系与第四系水力联系紧密,循环更替过程较长,导致环境同位素值有所降低。白垩系和侏罗系地下水受垂向补给控制,循环更替速度减缓,δD值和δ^(18)O值逐渐降低,其中白垩系地下水的δD值为–80.2‰~–75.6‰,δ^(18)O值为–10.6‰~–8.7‰。浅埋区和中深埋区地层由于沉积时间长,成岩作用较好,加之后期构造运动的影响,与第四系或新近系直接接触,接受第四系地下水补给,导致δD值和δ^(18)O值相对较高。而深埋区的侏罗系地层由于本身厚度较大,上覆有厚层的第四系和白垩系地层,地下水补给条件较差,地下水径流过程漫长且较为封闭滞流,因此δD值和δ^(18)O值相对较低。本研究利用地下水中的δD值,通过二元混合模型计算得出,在浅埋区的矿井水中,第四系水的比例有所不同:SGT和HLG煤矿的占比小于20%,而BLT和LSJ等煤矿的占比介于28.0%~57.0%,YBJ煤矿的占比则接近80%。在中深埋区,矿井水中第四系水的比例通常小于20%,但在开发较早、顶板存在保德组红土层“天窗”的HLW和SS煤矿中,第四系水的比例分别达到了37.05%和26.24%。在深埋区,矿井水中白垩系水的占比约为30%。IsoSource模型的计算结果显示,第四系水的贡献率在7.6%~9.3%间,白垩系水的贡献率在12.0%~17.1%间,而侏罗系上段水的贡献率在74.9%~80.4%间,且不同矿区的矿井水中各水源的贡献率相近。本研究准确识别了矿井水中各含水层水的来源比例,对于蒙陕接壤区的保水采煤和生态环境保护具有重要的实际意义。 展开更多
关键词 环境同位素 矿井水 煤炭开采 水源判别模型 顶板地层结构
在线阅读 下载PDF
上一页 1 2 34 下一页 到第
使用帮助 返回顶部