Energy-efficient retrofitting(EER)of existing buildings has significant potential for addressing energy and environmental issues.However,the traditional market trading model is characterized by an inefficient dissemin...Energy-efficient retrofitting(EER)of existing buildings has significant potential for addressing energy and environmental issues.However,the traditional market trading model is characterized by an inefficient dissemination of critical information,which leads to insufficient incentives for market participants to trade.To solve these problems,this study constructs a three-party evolutionary game model with energy saving service companies(ESCO),homeowners,and trading information platforms as the main players,analyzes the interaction and evolution of the three parties'strategies under the scenario of government rewards and penalties,and explores the effects of the three parties'initial willingness and changes of model parameters on the evolution of their strategies.There are some findings as follows:first,the positive transactions of homeowners and ESCOs have less influence on the platform side;second,compared with homeowners,the government penalties have more obvious constraints on the platform side and ESCOs;third,government subsidies and EER revenues are the important factors influencing the speed of the evolution of three-party strategies,fourth,platform service compensation,the factors governing cost and benefit sharing are pivotal in determining the alignment of strategic choices among the three parties involved.Based on the research conclusions.This study offers theoretical guidance for the advancement of platform-based market transactions for EER.展开更多
The energy retrofit of public buildings is an effective strategy to achieve carbon neutrality goals,with educational buildings representing a significant proportion of this sector.This paper presents an in-depth analy...The energy retrofit of public buildings is an effective strategy to achieve carbon neutrality goals,with educational buildings representing a significant proportion of this sector.This paper presents an in-depth analysis of energy retrofitting policies for educational buildings and examines the design case of the“Plus Energy School”demonstration project in Rostock,Germany.The study reveals innovative approaches in several key areas:overall layout optimization,creation of climate buffer zones,enhancement of building envelope performance,ventilation and heating system design,integration of diverse renewable energy sources,and formulation of energy balance schemes with corresponding calculations.The holistic theory and methodology of this energy strategy synergy offer valuable insights for the retrofitting of existing educational buildings in China.The project successfully transformed two aging school buildings into a single“plus energy”facility through coordinated architectural and technological interventions.Notable features include the compact redesign reducing the form factor from 0.38 to 0.21,the implementation of climate buffer zones maintaining 15℃without active heating,and the integration of photovoltaic panels and wind turbines.The combination of district heating with an Organic Rankine Cycle(ORC)system further optimized energy utilization.Post-retrofit calculations demonstrate a two-thirds reduction in annual unit energy consumption,with the building generating an energy surplus.This case study provides a comprehensive framework for achieving high energy performance in educational building retrofits,offering valuable lessons for similar initiatives in China and globally.The paper concludes by discussing the potential for widespread application of these strategies in China’s existing educational buildings,considering the country’s vast building stock and increasing energy efficiency requirements.展开更多
The green retrofit of existing public buildings is a necessary choice to promote energy conservation,emission reduction,and sustainable development goals in the construction industry,and to advance the implementation ...The green retrofit of existing public buildings is a necessary choice to promote energy conservation,emission reduction,and sustainable development goals in the construction industry,and to advance the implementation of the national"carbon peaking and carbon neutrality"strategy.The effective governance of green retrofit projects for existing public buildings essentially involves a dynamic process of repeated strategic interactions among key stakeholders.From the perspective of project governance,this study clarifies the game-theoretic relationship between ESCO and owners under government guidance,and constructs an evolutionary game model involving the government,ESCO,and owners.The study explores the strategic choices of the core stakeholders in the green retrofit projects of existing public buildings.The aim is to lay a foundation for research on the decision-making coordination and implementation mechanisms between ESCO and owners,thus promoting the efficient and healthy development of green retrofit projects for existing public buildings.展开更多
Over the past decade,medical researchers in China have debated whether the Pi(脾)corresponds to the biomedical spleen or pancreas.This debate exemplifies a broader phenomenon of“anatomical retrofitting”,or the anach...Over the past decade,medical researchers in China have debated whether the Pi(脾)corresponds to the biomedical spleen or pancreas.This debate exemplifies a broader phenomenon of“anatomical retrofitting”,or the anachronistic imposition of contemporary categories onto living historical objects.“Anatomical retrofitting”as a means of rectifying cases of mistranslation further positions the biomedical spleen and pancreas as representing ahistorical,universal truths.This framework gives rise to a conceptual binary:while the biomedical spleen is universalized as what philosophers may describe as“logical”ontology,the Pi connects to a different nature of reality,or“metaphysical”ontology.Far from being an object of imprecision,the Pi was a dynamic vessel that also shared characteristics with the humoral spleen.Given that scholars in China have already subjected Pi to historical scrutiny,this paper urges scholars to do the same with biomedical anatomy.For instance,historically situating the humoral spleen demonstrates that it became less known and less articulated as it transformed into the biomedical spleen.Meanwhile,the pancreas remained an unstable epistemic object that took on the dynamic functions of the humoral spleen in nineteenth-century organotherapy.Through primary source analysis and literature review,this paper contends that the apparent ontological incommensurability between Pi and spleen is neither mutually exclusive nor irreconcilable.Instead,the dynamic nature of internal viscera,their many functions,and their participation in epistemic practices contribute to an ongoing ontological ambivalence that persists despite the forced certainty of anatomical retrofitting.展开更多
This paper outlines a plan for the effective reduction of the audible sound level produced by aerodynamic noise from the power-generating turbine blades. The contribution of aerodynamic noise can be divided into two c...This paper outlines a plan for the effective reduction of the audible sound level produced by aerodynamic noise from the power-generating turbine blades. The contribution of aerodynamic noise can be divided into two categories: inflow turbulence and airfoil self-noise. The base model and retrofit blade designs were modeled in SolidWorks. Subsequently, noise prediction simulations were conducted and compared to the base blade model to determine which modification provided the greatest benefit using SolidWorks Flow Simulation. The result of this project is a series of blade retrofit recommendations that produce a more acoustically efficient design and reduce noise complaints while enabling turbines to be placed in locations that require quieter operations.展开更多
The improvement of the seismic resilience of existing reinforced-concrete(RC) frame buildings, which is essential for the seismic resilience of a city, has become a critical issue. Although seismic isolation is an eff...The improvement of the seismic resilience of existing reinforced-concrete(RC) frame buildings, which is essential for the seismic resilience of a city, has become a critical issue. Although seismic isolation is an effective method for improving the resilient performance of such buildings, target-oriented quantitative improvements of the resilient performance of these buildings have been reported rarely. To address this gap, the seismic resilience of two existing RC frame buildings located in a high seismic intensity region of China were assessed based on the Chinese Standard for Seismic Resilience Assessment of Buildings. The critical engineering demand parameters(EDPs) affecting the seismic resilience of such buildings were identified. Subsequently, the seismic resilience of buildings retrofitted with different isolation schemes(i.e., yield ratios) were evaluated and compared, with emphasis on the relationships among yield ratios, EDPs, and levels of seismic resilience. Accordingly, to achieve the highest level of seismic resilience with respect to the Chinese standard, a yield ratio of 3% was recommended and successfully applied to the target-oriented design for the seismic-resilience improvement of an existing RC frame building. The research outcome can provide an important reference for the resilience-based retrofitting of existing RC frame buildings using seismic isolation in urban cities.展开更多
Platforms I and II are steel structures located in offshore areas southeast of the Zhujiang (Pearl) River Delta, the northern South China Sea,. in about 110 in water depth. The jackets, with aluminum sacrificial anode...Platforms I and II are steel structures located in offshore areas southeast of the Zhujiang (Pearl) River Delta, the northern South China Sea,. in about 110 in water depth. The jackets, with aluminum sacrificial anodes for cathodic protection (CP) of the immersed zone, were launched in March 1995. In May 096 a CP survey showed that, after almost one year of service, a low polarization level had been achieved and some extended unprotected zones existed; mainly in the deepest part of the Platform II. Further to this, a joint activity was decided in order to assess the need of a possible retrofitting of the CP systems. The results of the activity carried out are dealt with, including technical and economical comparisons amongst several retrofitting options, both with sacrificial anodes and with impressed current systems. The adopted solution is illustrated and data are reported on the level of protection presently achieved.展开更多
The buildings' capacity to maintain minimum structural safety levels during natural disasters, such as earthquakes, is recognisably one of the aspects that most influence urban resilience. Moreover, the public invest...The buildings' capacity to maintain minimum structural safety levels during natural disasters, such as earthquakes, is recognisably one of the aspects that most influence urban resilience. Moreover, the public investment in risk mitigation strategies is fimdamental, not only to promote social and urban and resilience, but also to limit consequent material, human and environmental losses. Despite the growing awareness of this issue, there is still a vast number of traditional masonry buildings spread throughout many European old city centres that lacks of adequate seismic resistance, requiring therefore urgent retrofitting interventions in order to both reduce their seismic vulnerability and to cope with the increased seismic requirements of recent code standards. Thus, this paper aims at contributing to mitigate the social and economic impacts of earthquake damage scenarios through the development of vulnerability-based comparative analysis of some of the most popularretrofitting techniques applied after the 1998 Azores earthquake. The influence of each technique individually and globally studied resorting to a seismic vulnerability index methodology integrated into a GIS tool and damage and loss scenarios are constructed and critically discussed. Finally, the economic balance resulting from the implementation of that techniques are also examined.展开更多
To retrofit and strengthen existing unreinforced masonry (URM) structures to resist the potential earthquake damages has become an important issue in Australia. In order to secure the performance of URM under seismic ...To retrofit and strengthen existing unreinforced masonry (URM) structures to resist the potential earthquake damages has become an important issue in Australia. In order to secure the performance of URM under seismic loading in the future, a research project was carried out aimed at developing a simple and high strength seismic retrofitting technique for masonry structures. A series of experimental testing on URM walls retrofitted with an innovative technique by cable system have been conducted. The results indicated that both the strength and ductility of the tested speci-mens were significantly enhanced with the technique. An analytical model which is based on Dis-tinct Element Method (DEM) has also been developed to simulate the behaviour of URM walls be-fore and after retrofitting. The model is then further developed by applying a seismic wave to the wall to simulate the wall behavior under earthquake loads before and after retrofitting.展开更多
Al-Gawhara Palace also known as Bijou Palace is located in the south of the Mosque of Muhammad Ali in Saladin Citadel in Cairo (Figure 1 and Figure 2). It was commissioned and constructed by Muhammad Ali Pasha in 1814...Al-Gawhara Palace also known as Bijou Palace is located in the south of the Mosque of Muhammad Ali in Saladin Citadel in Cairo (Figure 1 and Figure 2). It was commissioned and constructed by Muhammad Ali Pasha in 1814. Al-Gawhara Palace is one of the most famous historical royal palaces in Egypt and the most important modern architectural heritage that reflects an important historical period of the Egyptian modern history—the period of the rule of the family of “Muhammad Ali Pasha”. The causes of structural deficiency of the palace could be attributed to many reasons and actions, mainly due to the earthquakes and seismic events (in particular the Dahshuor earthquake, in October 1992), degradation of drainage and feeding systems leading to water leakage, lack of awareness of the palace values, deterioration resulting from the use of old government agencies and the conflicts among authorities supervising historical buildings. The present study includes many phases: 1) the significance of the original building from the circumstances and date of construction;2) detailed studies of the architectural features and design of the building as well as construction type, methods and techniques of construction;3) characterization of the construction and building materials;4) stability analysis of the structure under static and the impact of seismic loadings;5) engineering measures for intervention retrofitting of the palace (this pilot study presents the main design studies for intervention retrofitting and the rehabilitation and re-employment of Al-Gawhara Palace, started from the static monitoring, old and modern documenting of the current state of preservation thorough the strengthening project implementation;6) the study also presents the reuse designs to convert the palace to be a national museum, for the purpose of preserving it by proposing the best means to apply the correct principles and criteria for reuse and employment in a manner that preserves its value through the functions that fit these deficiencies, and the appropriateness of the present function of the value of minors.展开更多
Sudan is not free from earthquakes. It has experienced many earthquakes during the recent history, and the previous studies on this field demonstrated this argument. This paper focuses on the study of seismic performa...Sudan is not free from earthquakes. It has experienced many earthquakes during the recent history, and the previous studies on this field demonstrated this argument. This paper focuses on the study of seismic performance of existing hospital buildings in Sudan. The paper focused on studying design of reinforced concrete columns of a hospital building considering two load cases;case one is the design load including combinations of dead, live and wind loads and case two includes dead, live and seismic loads. The building was designed according to the Regulation of Egyptian Society for Earthquake Engineering (ESEE), using the linear static method (equivalent static method). The analysis and design were performed using the SAP2000 version 14 software package. The design results obtained from the two cases of loading were compared observing that the design based on case one was unsafe to withstand the additional load came from earthquake, because the cross sections and area of steel for the most of building columns are under the required values that needed to resist the loads of case two. If the building is constructed according to the design using the loadings of case one, this situation needs remedy. This paper suggested two solutions for this problem based on strengthening the weak columns by inserting reinforced concrete shear walls in the direction of y axis affected by seismic load. Solution one suggests shear walls of length 2.5 m with different wall thicknesses (15 cm, 20 cm, 25 cm and 30 cm), whereas solution two suggests shear walls of length 4.5 m and 15 cm width. It was found that solution one solved the problem partially because some columns were still unsafe, but solution two solved the problem completely and all columns were safe.展开更多
Following the foundation failure of a building, with an aim of economical solution to strengthen other existing buildings of the same project, a new arrangement was implemented experimentally to test the adequacy of l...Following the foundation failure of a building, with an aim of economical solution to strengthen other existing buildings of the same project, a new arrangement was implemented experimentally to test the adequacy of load bearing capacity of a few selected cast-in-situ RCC (reinforced cement concrete) pile groups without demolishing the existing buildings. In this test, the column bottom of an existing building was removed by the help of scaffolding and after that a frame system consisting tension piles and hollow beam was constructed over the pile cap of the to be tested pile group. The load was tested by the help of hydraulic jack system and the constructed frame system. This paper contains the detailed plan, arrangement and method of the test with illustrations. The deflection and loading data analysis is also included which was performed to determine the outcome of the test. Through this test method the appropriate assessment of capacity of pile group of existing building could be done successfully and in result the structure could be saved by only super structure retrofitting.展开更多
In many seismically active regions of the world there are large numbers of masonry buildings. Most of these buildings have not been designed for seismic loads. Recent earthquakes have shown that many of these building...In many seismically active regions of the world there are large numbers of masonry buildings. Most of these buildings have not been designed for seismic loads. Recent earthquakes have shown that many of these buildings are seismically vulnerable and should be considered for retrofitting. Different conventional and unconventional retrofitting techniques are available to increase the strength and/or ductility of unreinforced masonry (URM) walls. This paper reviews and discusses seismic retrofitting of masonry walls with emphasis on the conventional techniques. Retrofitting procedures are discussed with regard to a case study: a stone masonry building in lrpinia region, damaged by the 1980 earthquake. The interventions are evaluated by means of finite elements with a macroelement obtained with a homogenization technique. Linear and nonlinear procedures are compared, and peculiarities of each procedure are shown.展开更多
With the rapid development of urbanization, the Chinese government has put equal emphasis on construction and retrofitting. But those projects did not achieve optimal effect because of the lack of targeted and systema...With the rapid development of urbanization, the Chinese government has put equal emphasis on construction and retrofitting. But those projects did not achieve optimal effect because of the lack of targeted and systematic design guidance system. In this study, it first analyzes existing retrofitting methods and sorts into five retrofitting types as a basis, and then, captures the combi-nations and permutations of retrofitting methods and materials by parts and layers to build a database. After that, it combines different kinds of ap-proaches by hierarchical matrix method to conclude the most efficient strat-egy. This study also selects typical residential buildings built between 1980 and 2000 in cold climate area of Northeast China as the research objects to test the integrity and effectiveness. As the results of this paper, it provides systematic guidance and multiple performance-based retrofitting strategies of the existing residential envelope system, which can improve indoor ther-mal comfort with low energy consumption.展开更多
Illyria hotel (formerly Bozhur) was built during the sixties in the heart of the actual Kosovo's capital Prishtina, according to former old Yugoslav standards in a Modernist architectural style. It represents a mas...Illyria hotel (formerly Bozhur) was built during the sixties in the heart of the actual Kosovo's capital Prishtina, according to former old Yugoslav standards in a Modernist architectural style. It represents a massive structural system with brick walls up to 54 cm thick and "avramenko" type reinforced concrete floors. The investor's aim was to add another two floors on the top of the existing ones and to build two level underground parking floors, a health spa centre, whilst at the vicinity of the existing building (the northern side) to erect a new 17 story-high brand new hotel and administration building. The retrofitting of the structure as well as construction of the new structure has been done in full accordance with the new structural Eurocodes' recommendations. 3D FEM (finite element method) modeling was used for the analysis and design, using ETABS v 9.5 nonlinear and ARSAP 2010 (Autodesk Robot Structural Analysis Professional 2010). Response spectrum design according to EC 8,3.2.2.4 has been used for seismic analysis and design with a reference peak ground acceleration on type A ground Of AgR = 0.25 g.展开更多
Fire effects can be one of the most harmful conditions that any building may experience throughout its service life. Developing practical protection methods and concepts against potential fire disasters in buildings h...Fire effects can be one of the most harmful conditions that any building may experience throughout its service life. Developing practical protection methods and concepts against potential fire disasters in buildings has been an important consideration in design of buildings in recent decades. Rapid developments in technology have heightened the demand for new and innovative fire protection systems in comparison with conventional and traditional methods. Such a need for new technologies is in particular of greater importance when it comes to existing buildings. Retrofitting an existing building for fire safety is a greater challenge compared with designing a new building using materials and components that have more desirable and superior fire rating to begin with. Furthermore, strategies to design a new building that includes state-of-the-art fire safety features are also different from solutions that may be more suitable for retrofitting an existing building. This paper presents a review of the literature concerning conventional and new or innovative retrofitting methods for fire safety of buildings. Advantages and disadvantages of different fire protection devices and methods as available and understood from the literature are mentioned. Study of fire safety systems shows that each has its drawbacks. Comparison of the results shows that disadvantages of a solitary system for retrofitting against fire can be improved by using a combination of several fire safety concepts or methods simultaneously.展开更多
Following a seismic event that occurred years ago in Central Italy, the public opinion was growing and growing a concern on the adequacy of educational buildings all across Italy. This activated several political deci...Following a seismic event that occurred years ago in Central Italy, the public opinion was growing and growing a concern on the adequacy of educational buildings all across Italy. This activated several political decisions and a consequent technical effort is in progress. Technically speaking one has to manage the classical problem of retrofitting existing buildings. However, the legal environment goes across national codes, targeted guidelines and the professional need of achieving pragmatic solutions based on ethical and social acceptation schemes.This paper introduces the topic in its worldwide exception and focuses then on some operative aspects in the Italian situation. It outlines the consolidated steps along this technical process and emphasizes the weak aspects one meets when going across the designers' reports.展开更多
This paper presents a new type of structural bracing intended for seismic retrofitting use in framed structures. This special composite brace, termed glass-fiber-reinforced-polymer (GFRP)-tube-confined-concrete comp...This paper presents a new type of structural bracing intended for seismic retrofitting use in framed structures. This special composite brace, termed glass-fiber-reinforced-polymer (GFRP)-tube-confined-concrete composite brace, is comprised of concrete confined by a GFRP tube and an inner steel core for energy dissipation. Together with a contribution from the GFRP-tube confined concrete, the composite brace shows a substantially increased stiffness to control story drift, which is often a preferred feature in seismic retrofitting. An analysis model is established and implemented in a general finite element analysis program - OpenSees, for simulating the load-displacement behavior of the composite brace. Using this model, a parametric study of the hysteretic behavior (energy dissipation, stiffness, ductility and strength) of the composite brace was conducted under static cyclic loading and it was found that the area ratio of steel core to concrete has the greatest influence among all the parameters considered. To demonstrate the application of the composite brace in seismic retrofitting, a three-story nonductile reinforced concrete (RC) frame structure was retrofitted with the composite braces. Pushover analysis and nonlinear time-history analyses of the retrofitted RC frame structure was performed by employing a suite of 20 strong ground motion earthquake records. The analysis results show that the composite braces can effectively reduce the peak seismic responses of the RC frame structure without significantly increasing the base shear demand.展开更多
基金supported by the National Natural Science Foundation of China(Grant No.71872122)the Late-stage Subsidy Project of Humanities and Social Sciences of the Education Department of China(Grant No.20JHQ095).
文摘Energy-efficient retrofitting(EER)of existing buildings has significant potential for addressing energy and environmental issues.However,the traditional market trading model is characterized by an inefficient dissemination of critical information,which leads to insufficient incentives for market participants to trade.To solve these problems,this study constructs a three-party evolutionary game model with energy saving service companies(ESCO),homeowners,and trading information platforms as the main players,analyzes the interaction and evolution of the three parties'strategies under the scenario of government rewards and penalties,and explores the effects of the three parties'initial willingness and changes of model parameters on the evolution of their strategies.There are some findings as follows:first,the positive transactions of homeowners and ESCOs have less influence on the platform side;second,compared with homeowners,the government penalties have more obvious constraints on the platform side and ESCOs;third,government subsidies and EER revenues are the important factors influencing the speed of the evolution of three-party strategies,fourth,platform service compensation,the factors governing cost and benefit sharing are pivotal in determining the alignment of strategic choices among the three parties involved.Based on the research conclusions.This study offers theoretical guidance for the advancement of platform-based market transactions for EER.
文摘The energy retrofit of public buildings is an effective strategy to achieve carbon neutrality goals,with educational buildings representing a significant proportion of this sector.This paper presents an in-depth analysis of energy retrofitting policies for educational buildings and examines the design case of the“Plus Energy School”demonstration project in Rostock,Germany.The study reveals innovative approaches in several key areas:overall layout optimization,creation of climate buffer zones,enhancement of building envelope performance,ventilation and heating system design,integration of diverse renewable energy sources,and formulation of energy balance schemes with corresponding calculations.The holistic theory and methodology of this energy strategy synergy offer valuable insights for the retrofitting of existing educational buildings in China.The project successfully transformed two aging school buildings into a single“plus energy”facility through coordinated architectural and technological interventions.Notable features include the compact redesign reducing the form factor from 0.38 to 0.21,the implementation of climate buffer zones maintaining 15℃without active heating,and the integration of photovoltaic panels and wind turbines.The combination of district heating with an Organic Rankine Cycle(ORC)system further optimized energy utilization.Post-retrofit calculations demonstrate a two-thirds reduction in annual unit energy consumption,with the building generating an energy surplus.This case study provides a comprehensive framework for achieving high energy performance in educational building retrofits,offering valuable lessons for similar initiatives in China and globally.The paper concludes by discussing the potential for widespread application of these strategies in China’s existing educational buildings,considering the country’s vast building stock and increasing energy efficiency requirements.
基金supported by the National Natural Science Foundation of China(Grant No.71872122)the Late-stage Subsidy Project of Humanities and Social Sciences of the Education Department of China(Grant No.20JHQ095).
文摘The green retrofit of existing public buildings is a necessary choice to promote energy conservation,emission reduction,and sustainable development goals in the construction industry,and to advance the implementation of the national"carbon peaking and carbon neutrality"strategy.The effective governance of green retrofit projects for existing public buildings essentially involves a dynamic process of repeated strategic interactions among key stakeholders.From the perspective of project governance,this study clarifies the game-theoretic relationship between ESCO and owners under government guidance,and constructs an evolutionary game model involving the government,ESCO,and owners.The study explores the strategic choices of the core stakeholders in the green retrofit projects of existing public buildings.The aim is to lay a foundation for research on the decision-making coordination and implementation mechanisms between ESCO and owners,thus promoting the efficient and healthy development of green retrofit projects for existing public buildings.
文摘Over the past decade,medical researchers in China have debated whether the Pi(脾)corresponds to the biomedical spleen or pancreas.This debate exemplifies a broader phenomenon of“anatomical retrofitting”,or the anachronistic imposition of contemporary categories onto living historical objects.“Anatomical retrofitting”as a means of rectifying cases of mistranslation further positions the biomedical spleen and pancreas as representing ahistorical,universal truths.This framework gives rise to a conceptual binary:while the biomedical spleen is universalized as what philosophers may describe as“logical”ontology,the Pi connects to a different nature of reality,or“metaphysical”ontology.Far from being an object of imprecision,the Pi was a dynamic vessel that also shared characteristics with the humoral spleen.Given that scholars in China have already subjected Pi to historical scrutiny,this paper urges scholars to do the same with biomedical anatomy.For instance,historically situating the humoral spleen demonstrates that it became less known and less articulated as it transformed into the biomedical spleen.Meanwhile,the pancreas remained an unstable epistemic object that took on the dynamic functions of the humoral spleen in nineteenth-century organotherapy.Through primary source analysis and literature review,this paper contends that the apparent ontological incommensurability between Pi and spleen is neither mutually exclusive nor irreconcilable.Instead,the dynamic nature of internal viscera,their many functions,and their participation in epistemic practices contribute to an ongoing ontological ambivalence that persists despite the forced certainty of anatomical retrofitting.
文摘This paper outlines a plan for the effective reduction of the audible sound level produced by aerodynamic noise from the power-generating turbine blades. The contribution of aerodynamic noise can be divided into two categories: inflow turbulence and airfoil self-noise. The base model and retrofit blade designs were modeled in SolidWorks. Subsequently, noise prediction simulations were conducted and compared to the base blade model to determine which modification provided the greatest benefit using SolidWorks Flow Simulation. The result of this project is a series of blade retrofit recommendations that produce a more acoustically efficient design and reduce noise complaints while enabling turbines to be placed in locations that require quieter operations.
基金Beijing Natural Science Foundation under Grant No. 8192008the Scientific Research Foundation of Graduate School of Southeast University under Grant No. YBPY2021+1 种基金the Science and Technology Project of Beijing Municipal Education Commission under Grant No. KM201910016014the Program for Changjiang Scholars and Innovative Research Team in University under Grant No. IRT_17R06。
文摘The improvement of the seismic resilience of existing reinforced-concrete(RC) frame buildings, which is essential for the seismic resilience of a city, has become a critical issue. Although seismic isolation is an effective method for improving the resilient performance of such buildings, target-oriented quantitative improvements of the resilient performance of these buildings have been reported rarely. To address this gap, the seismic resilience of two existing RC frame buildings located in a high seismic intensity region of China were assessed based on the Chinese Standard for Seismic Resilience Assessment of Buildings. The critical engineering demand parameters(EDPs) affecting the seismic resilience of such buildings were identified. Subsequently, the seismic resilience of buildings retrofitted with different isolation schemes(i.e., yield ratios) were evaluated and compared, with emphasis on the relationships among yield ratios, EDPs, and levels of seismic resilience. Accordingly, to achieve the highest level of seismic resilience with respect to the Chinese standard, a yield ratio of 3% was recommended and successfully applied to the target-oriented design for the seismic-resilience improvement of an existing RC frame building. The research outcome can provide an important reference for the resilience-based retrofitting of existing RC frame buildings using seismic isolation in urban cities.
文摘Platforms I and II are steel structures located in offshore areas southeast of the Zhujiang (Pearl) River Delta, the northern South China Sea,. in about 110 in water depth. The jackets, with aluminum sacrificial anodes for cathodic protection (CP) of the immersed zone, were launched in March 1995. In May 096 a CP survey showed that, after almost one year of service, a low polarization level had been achieved and some extended unprotected zones existed; mainly in the deepest part of the Platform II. Further to this, a joint activity was decided in order to assess the need of a possible retrofitting of the CP systems. The results of the activity carried out are dealt with, including technical and economical comparisons amongst several retrofitting options, both with sacrificial anodes and with impressed current systems. The adopted solution is illustrated and data are reported on the level of protection presently achieved.
基金URBSIS:Assessing Vulnerability and Managing Earthquake Risk at Urban Scale(PTDC/ECM-URB/2564/2012)
文摘The buildings' capacity to maintain minimum structural safety levels during natural disasters, such as earthquakes, is recognisably one of the aspects that most influence urban resilience. Moreover, the public investment in risk mitigation strategies is fimdamental, not only to promote social and urban and resilience, but also to limit consequent material, human and environmental losses. Despite the growing awareness of this issue, there is still a vast number of traditional masonry buildings spread throughout many European old city centres that lacks of adequate seismic resistance, requiring therefore urgent retrofitting interventions in order to both reduce their seismic vulnerability and to cope with the increased seismic requirements of recent code standards. Thus, this paper aims at contributing to mitigate the social and economic impacts of earthquake damage scenarios through the development of vulnerability-based comparative analysis of some of the most popularretrofitting techniques applied after the 1998 Azores earthquake. The influence of each technique individually and globally studied resorting to a seismic vulnerability index methodology integrated into a GIS tool and damage and loss scenarios are constructed and critically discussed. Finally, the economic balance resulting from the implementation of that techniques are also examined.
文摘To retrofit and strengthen existing unreinforced masonry (URM) structures to resist the potential earthquake damages has become an important issue in Australia. In order to secure the performance of URM under seismic loading in the future, a research project was carried out aimed at developing a simple and high strength seismic retrofitting technique for masonry structures. A series of experimental testing on URM walls retrofitted with an innovative technique by cable system have been conducted. The results indicated that both the strength and ductility of the tested speci-mens were significantly enhanced with the technique. An analytical model which is based on Dis-tinct Element Method (DEM) has also been developed to simulate the behaviour of URM walls be-fore and after retrofitting. The model is then further developed by applying a seismic wave to the wall to simulate the wall behavior under earthquake loads before and after retrofitting.
文摘Al-Gawhara Palace also known as Bijou Palace is located in the south of the Mosque of Muhammad Ali in Saladin Citadel in Cairo (Figure 1 and Figure 2). It was commissioned and constructed by Muhammad Ali Pasha in 1814. Al-Gawhara Palace is one of the most famous historical royal palaces in Egypt and the most important modern architectural heritage that reflects an important historical period of the Egyptian modern history—the period of the rule of the family of “Muhammad Ali Pasha”. The causes of structural deficiency of the palace could be attributed to many reasons and actions, mainly due to the earthquakes and seismic events (in particular the Dahshuor earthquake, in October 1992), degradation of drainage and feeding systems leading to water leakage, lack of awareness of the palace values, deterioration resulting from the use of old government agencies and the conflicts among authorities supervising historical buildings. The present study includes many phases: 1) the significance of the original building from the circumstances and date of construction;2) detailed studies of the architectural features and design of the building as well as construction type, methods and techniques of construction;3) characterization of the construction and building materials;4) stability analysis of the structure under static and the impact of seismic loadings;5) engineering measures for intervention retrofitting of the palace (this pilot study presents the main design studies for intervention retrofitting and the rehabilitation and re-employment of Al-Gawhara Palace, started from the static monitoring, old and modern documenting of the current state of preservation thorough the strengthening project implementation;6) the study also presents the reuse designs to convert the palace to be a national museum, for the purpose of preserving it by proposing the best means to apply the correct principles and criteria for reuse and employment in a manner that preserves its value through the functions that fit these deficiencies, and the appropriateness of the present function of the value of minors.
文摘Sudan is not free from earthquakes. It has experienced many earthquakes during the recent history, and the previous studies on this field demonstrated this argument. This paper focuses on the study of seismic performance of existing hospital buildings in Sudan. The paper focused on studying design of reinforced concrete columns of a hospital building considering two load cases;case one is the design load including combinations of dead, live and wind loads and case two includes dead, live and seismic loads. The building was designed according to the Regulation of Egyptian Society for Earthquake Engineering (ESEE), using the linear static method (equivalent static method). The analysis and design were performed using the SAP2000 version 14 software package. The design results obtained from the two cases of loading were compared observing that the design based on case one was unsafe to withstand the additional load came from earthquake, because the cross sections and area of steel for the most of building columns are under the required values that needed to resist the loads of case two. If the building is constructed according to the design using the loadings of case one, this situation needs remedy. This paper suggested two solutions for this problem based on strengthening the weak columns by inserting reinforced concrete shear walls in the direction of y axis affected by seismic load. Solution one suggests shear walls of length 2.5 m with different wall thicknesses (15 cm, 20 cm, 25 cm and 30 cm), whereas solution two suggests shear walls of length 4.5 m and 15 cm width. It was found that solution one solved the problem partially because some columns were still unsafe, but solution two solved the problem completely and all columns were safe.
文摘Following the foundation failure of a building, with an aim of economical solution to strengthen other existing buildings of the same project, a new arrangement was implemented experimentally to test the adequacy of load bearing capacity of a few selected cast-in-situ RCC (reinforced cement concrete) pile groups without demolishing the existing buildings. In this test, the column bottom of an existing building was removed by the help of scaffolding and after that a frame system consisting tension piles and hollow beam was constructed over the pile cap of the to be tested pile group. The load was tested by the help of hydraulic jack system and the constructed frame system. This paper contains the detailed plan, arrangement and method of the test with illustrations. The deflection and loading data analysis is also included which was performed to determine the outcome of the test. Through this test method the appropriate assessment of capacity of pile group of existing building could be done successfully and in result the structure could be saved by only super structure retrofitting.
文摘In many seismically active regions of the world there are large numbers of masonry buildings. Most of these buildings have not been designed for seismic loads. Recent earthquakes have shown that many of these buildings are seismically vulnerable and should be considered for retrofitting. Different conventional and unconventional retrofitting techniques are available to increase the strength and/or ductility of unreinforced masonry (URM) walls. This paper reviews and discusses seismic retrofitting of masonry walls with emphasis on the conventional techniques. Retrofitting procedures are discussed with regard to a case study: a stone masonry building in lrpinia region, damaged by the 1980 earthquake. The interventions are evaluated by means of finite elements with a macroelement obtained with a homogenization technique. Linear and nonlinear procedures are compared, and peculiarities of each procedure are shown.
文摘With the rapid development of urbanization, the Chinese government has put equal emphasis on construction and retrofitting. But those projects did not achieve optimal effect because of the lack of targeted and systematic design guidance system. In this study, it first analyzes existing retrofitting methods and sorts into five retrofitting types as a basis, and then, captures the combi-nations and permutations of retrofitting methods and materials by parts and layers to build a database. After that, it combines different kinds of ap-proaches by hierarchical matrix method to conclude the most efficient strat-egy. This study also selects typical residential buildings built between 1980 and 2000 in cold climate area of Northeast China as the research objects to test the integrity and effectiveness. As the results of this paper, it provides systematic guidance and multiple performance-based retrofitting strategies of the existing residential envelope system, which can improve indoor ther-mal comfort with low energy consumption.
文摘Illyria hotel (formerly Bozhur) was built during the sixties in the heart of the actual Kosovo's capital Prishtina, according to former old Yugoslav standards in a Modernist architectural style. It represents a massive structural system with brick walls up to 54 cm thick and "avramenko" type reinforced concrete floors. The investor's aim was to add another two floors on the top of the existing ones and to build two level underground parking floors, a health spa centre, whilst at the vicinity of the existing building (the northern side) to erect a new 17 story-high brand new hotel and administration building. The retrofitting of the structure as well as construction of the new structure has been done in full accordance with the new structural Eurocodes' recommendations. 3D FEM (finite element method) modeling was used for the analysis and design, using ETABS v 9.5 nonlinear and ARSAP 2010 (Autodesk Robot Structural Analysis Professional 2010). Response spectrum design according to EC 8,3.2.2.4 has been used for seismic analysis and design with a reference peak ground acceleration on type A ground Of AgR = 0.25 g.
文摘Fire effects can be one of the most harmful conditions that any building may experience throughout its service life. Developing practical protection methods and concepts against potential fire disasters in buildings has been an important consideration in design of buildings in recent decades. Rapid developments in technology have heightened the demand for new and innovative fire protection systems in comparison with conventional and traditional methods. Such a need for new technologies is in particular of greater importance when it comes to existing buildings. Retrofitting an existing building for fire safety is a greater challenge compared with designing a new building using materials and components that have more desirable and superior fire rating to begin with. Furthermore, strategies to design a new building that includes state-of-the-art fire safety features are also different from solutions that may be more suitable for retrofitting an existing building. This paper presents a review of the literature concerning conventional and new or innovative retrofitting methods for fire safety of buildings. Advantages and disadvantages of different fire protection devices and methods as available and understood from the literature are mentioned. Study of fire safety systems shows that each has its drawbacks. Comparison of the results shows that disadvantages of a solitary system for retrofitting against fire can be improved by using a combination of several fire safety concepts or methods simultaneously.
文摘Following a seismic event that occurred years ago in Central Italy, the public opinion was growing and growing a concern on the adequacy of educational buildings all across Italy. This activated several political decisions and a consequent technical effort is in progress. Technically speaking one has to manage the classical problem of retrofitting existing buildings. However, the legal environment goes across national codes, targeted guidelines and the professional need of achieving pragmatic solutions based on ethical and social acceptation schemes.This paper introduces the topic in its worldwide exception and focuses then on some operative aspects in the Italian situation. It outlines the consolidated steps along this technical process and emphasizes the weak aspects one meets when going across the designers' reports.
文摘This paper presents a new type of structural bracing intended for seismic retrofitting use in framed structures. This special composite brace, termed glass-fiber-reinforced-polymer (GFRP)-tube-confined-concrete composite brace, is comprised of concrete confined by a GFRP tube and an inner steel core for energy dissipation. Together with a contribution from the GFRP-tube confined concrete, the composite brace shows a substantially increased stiffness to control story drift, which is often a preferred feature in seismic retrofitting. An analysis model is established and implemented in a general finite element analysis program - OpenSees, for simulating the load-displacement behavior of the composite brace. Using this model, a parametric study of the hysteretic behavior (energy dissipation, stiffness, ductility and strength) of the composite brace was conducted under static cyclic loading and it was found that the area ratio of steel core to concrete has the greatest influence among all the parameters considered. To demonstrate the application of the composite brace in seismic retrofitting, a three-story nonductile reinforced concrete (RC) frame structure was retrofitted with the composite braces. Pushover analysis and nonlinear time-history analyses of the retrofitted RC frame structure was performed by employing a suite of 20 strong ground motion earthquake records. The analysis results show that the composite braces can effectively reduce the peak seismic responses of the RC frame structure without significantly increasing the base shear demand.