This paper aims to present a case study that consists in the analysis of work effort per unit of software systems Development and Enhancement Projects (D&EP) depending on technological factors. That analysis was c...This paper aims to present a case study that consists in the analysis of work effort per unit of software systems Development and Enhancement Projects (D&EP) depending on technological factors. That analysis was commissioned by one of the largest public institutions in Poland. This is the COSMIC (Common Software Measurement International Consortium) function points method that is chosen by this institution as a point of reference for size of software systems developed/enhanced for supporting its functions and therefore this method is the base for the analysis of D&EP work effort per unit with regard to technological factors.展开更多
The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction ...The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation.展开更多
Baosteel's 60000 m……3/h air separation unit (ASU), the first domestically-integrated unit of its class, is a milestone in the Chinese air separation industry. In this paper,the process characteristics of the unit...Baosteel's 60000 m……3/h air separation unit (ASU), the first domestically-integrated unit of its class, is a milestone in the Chinese air separation industry. In this paper,the process characteristics of the unit and the application of the original techniques are expatiated. Some difficulties in the process design, the risk control, the quality control, the control system integration and the system commissioning are analyzed and appraised. The mode of the project integration and innovation, the cooperation among industries and the user-orientated project management mode are introduced. Finally,the successful experiences in innovation are summarized with the focus on the integration of the project.展开更多
文摘This paper aims to present a case study that consists in the analysis of work effort per unit of software systems Development and Enhancement Projects (D&EP) depending on technological factors. That analysis was commissioned by one of the largest public institutions in Poland. This is the COSMIC (Common Software Measurement International Consortium) function points method that is chosen by this institution as a point of reference for size of software systems developed/enhanced for supporting its functions and therefore this method is the base for the analysis of D&EP work effort per unit with regard to technological factors.
文摘The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation.
文摘Baosteel's 60000 m……3/h air separation unit (ASU), the first domestically-integrated unit of its class, is a milestone in the Chinese air separation industry. In this paper,the process characteristics of the unit and the application of the original techniques are expatiated. Some difficulties in the process design, the risk control, the quality control, the control system integration and the system commissioning are analyzed and appraised. The mode of the project integration and innovation, the cooperation among industries and the user-orientated project management mode are introduced. Finally,the successful experiences in innovation are summarized with the focus on the integration of the project.