The steelmaking process scheduling problem by considering variable electricity price (SMSPVEP) was in- vestigated. A decomposition approach was proposed for the SMSPVEP. At the first stage, mathematical program-ming...The steelmaking process scheduling problem by considering variable electricity price (SMSPVEP) was in- vestigated. A decomposition approach was proposed for the SMSPVEP. At the first stage, mathematical program-ming was utilized to minimize the maximum completion time for each cast without considering variable electricity price. At the second stage, based on obtained relative schedules of all casts, a mathematical model was formulated with an objective of minimizing the energy cost for all casts scheduling problem. The two-stage models were tested on randomly generated instances based on the practical process in a Chinese steelmaking plant. Computational results demonstrate the effectiveness of the proposed approach.展开更多
The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol...The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...展开更多
The models, algorithms and implementation results of a computerized scheduling system were introduced for the steelmaking-continuous casting process (SCCP) of a steel plant in China. The scheduling of SCCP in this p...The models, algorithms and implementation results of a computerized scheduling system were introduced for the steelmaking-continuous casting process (SCCP) of a steel plant in China. The scheduling of SCCP in this plant required that each cast plan should be processed on time, the charges in the same cast should be processed con- tinuously on the same caster, and the waiting time of the charges which are in front of each caster cannot exceed the given threshold. At the same time, the processing time of charges cannot be conflicted mutually in the same convert- ers or refining furnaces. Based on the research background, a hybrid optimal scheduling approach and its application were discussed. Aiming at the main equipment scheduling, an optimal scheduling method was proposed which con- sisted of equipment assignment algorithm based on dynamic program (DP) technique and conflict elimination algo rithm based on linear program (LP) technique. The approach guarantees that the charges are continuously processed on the same caster. Meanwhile, the requirement for high temperature ladle can also be satisfied due to the ladle matching function. Numerical results demonstrate solution quality, computational efficiency, and values of the mod els and algorithm.展开更多
This paper researches the adaptive scheduling problem of multiple electronic support measures(multi-ESM) in a ground moving radar targets tracking application. It is a sequential decision-making problem in uncertain e...This paper researches the adaptive scheduling problem of multiple electronic support measures(multi-ESM) in a ground moving radar targets tracking application. It is a sequential decision-making problem in uncertain environment. For adaptive selection of appropriate ESMs, we generalize an approximate dynamic programming(ADP) framework to the dynamic case. We define the environment model and agent model, respectively. To handle the partially observable challenge, we apply the unsented Kalman filter(UKF) algorithm for belief state estimation. To reduce the computational burden, a simulation-based approach rollout with a redesigned base policy is proposed to approximate the long-term cumulative reward. Meanwhile, Monte Carlo sampling is combined into the rollout to estimate the expectation of the rewards. The experiments indicate that our method outperforms other strategies due to its better performance in larger-scale problems.展开更多
An analysis of the key factors affecting on the single production process job scheduling of the parts waiting for be- ing processed on the key equipments for SMEs (Small Manufacturing Enterprises) is given in this pap...An analysis of the key factors affecting on the single production process job scheduling of the parts waiting for be- ing processed on the key equipments for SMEs (Small Manufacturing Enterprises) is given in this paper,which include interval number,real number and uncertain linguistic value.A kind of hybrid multi-attribute decision making method for the single pro- duction process job scheduling is presented in this paper,that the parts are firstly sorted about each factor,and then the total evalu- ative attributive value of each part is calculated with the method of weighted arithmetic average,and thus the part with the highest total evaluative attributive value is chosen for being processed firstly.The mathematic model corresponding to the method is set up in this paper.An example is studied in this paper,and the results of the example testify the correctness of this model.展开更多
Production scheduling has a major impact on the productivity of the manufacturing process. Recently, scheduling problems with deteriorating jobs have attracted increasing attentions from researchers. In many practical...Production scheduling has a major impact on the productivity of the manufacturing process. Recently, scheduling problems with deteriorating jobs have attracted increasing attentions from researchers. In many practical situations,it is found that some jobs fail to be processed prior to the pre-specified thresholds,and they often consume extra deteriorating time for successful accomplishment. Their processing times can be characterized by a step-wise function. Such kinds of jobs are called step-deteriorating jobs. In this paper,parallel machine scheduling problem with stepdeteriorating jobs( PMSD) is considered. Due to its intractability,four different mixed integer programming( MIP) models are formulated for solving the problem under consideration. The study aims to investigate the performance of these models and find promising optimization formulation to solve the largest possible problem instances. The proposed four models are solved by commercial software CPLEX. Moreover,the near-optimal solutions can be obtained by black-box local-search solver LocalS olver with the fourth one. The computational results show that the efficiencies of different MIP models depend on the distribution intervals of deteriorating thresholds, and the performance of LocalS olver is clearly better than that of CPLEX in terms of the quality of the solutions and the computational time.展开更多
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select...In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.展开更多
In order to meet the needs of collaborative decision making,considering the different demands of air traffic control units,airlines,airports and passengers in various traffic scenarios,the joint scheduling problem of ...In order to meet the needs of collaborative decision making,considering the different demands of air traffic control units,airlines,airports and passengers in various traffic scenarios,the joint scheduling problem of arrival and departure flights is studied systematically.According to the matching degree of capacity and flow,it is determined that the traffic state of arrival/departure operation in a certain period is peak or off-peak.The demands of all parties in each traffic state are analyzed,and the mathematical models of arrival/departure flight scheduling in each traffic state are established.Aiming at the four kinds of joint operation traffic scenarios of arrival and departure,the corresponding bi-level programming models for joint scheduling of arrival and departure flights are established,respectively,and the elitism genetic algorithm is designed to solve the models.The results show that:Compared with the first-come-firstserved method,in the scenarios of arrival peak&departure off-peak and arrival peak&departure peak,the departure flight equilibrium satisfaction is improved,and the runway occupation time of departure flight flow is reduced by 38.8%.In the scenarios of arrival off-peak&departure off-peak and departure peak&arrival off-peak,the arrival flight equilibrium delay time is significantly reduced,the departure flight equilibrium satisfaction is improved by 77.6%,and the runway occupation time of departure flight flow is reduced by 46.6%.Compared with other four kinds of strategies,the optimal scheduling method can better balance fairness and efficiency,so the scheduling results are more reasonable.展开更多
A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' pa...A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' parameters are available from the geological database of the mine. The objective is to minimize the deviation of the average ore grade of blasted blocks from the standard ore grade required by the mill. Transportation ability constraint. production quantity demand constraint. minimum safety bench constraint. block size constraint and block, bench precedence constraints are considered in forming the programming model. This model has more practical objective function and reasonable constraints compared with the existing model for this kind of problems.展开更多
To maximize the maintenance willingness of the owner of transmission lines,this study presents a transmission maintenance scheduling model that considers the energy constraints of the power system and the security con...To maximize the maintenance willingness of the owner of transmission lines,this study presents a transmission maintenance scheduling model that considers the energy constraints of the power system and the security constraints of on-site maintenance operations.Considering the computational complexity of the mixed integer programming(MIP)problem,a machine learning(ML)approach is presented to solve the transmission maintenance scheduling model efficiently.The value of the branching score factor value is optimized by Bayesian optimization(BO)in the proposed algorithm,which plays an important role in the size of the branch-and-bound search tree in the solution process.The test case in a modified version of the IEEE 30-bus system shows that the proposed algorithm can not only reach the optimal solution but also improve the computational efficiency.展开更多
Loading distribution for heavy plate mill is to find optimal control solutions under the granted performance indicators and constraints including mill capacity and hypothesis of rolling models.The solutions are quite ...Loading distribution for heavy plate mill is to find optimal control solutions under the granted performance indicators and constraints including mill capacity and hypothesis of rolling models.The solutions are quite different for different performance indicators.In the article,the performance indicators and sequential quadratic programming(SQP for short below) methods employed in 5 000 mm heavy plate mill of BaoSteel are penetratingly analyzed.Generally,the SQP method is an effective and fast way to solve the nonlinear programming problems with small or medium scale constraints.Early in 1976,Han put forward the SQP method for the first time and Powell made it perfect and accomplished the algorithm in 1977.In fact, SQP method was to turn a nonlinear programming problem to a series of sub set of quadratic programming problems.In the algorithm,each iteration step is to solve one quadratic programming problem.The optimal solutions will be gradually approached after quadratic programming problems were totally solved.When solving the quadratic programming problem,the active set strategy were employed which turned the constrained quadratic programming problem to unconstrained quadratic programming problem.The active set strategy made the whole quadratic programming problem be solved by a least square problem.And finally, the matrix of the least square problem would be decomposed by Q matrix and R matrix.After Q matrix and R matrix were obtained,the optimal solutions would be finally found.For loading distribution,the performance indicators were composed by plate shape and draft of each pass.Plate shape is represented by rolling force gradually reduced pass by pass with a tunable factor.The mill capacity is another performance indicator represented by draft of each pass.For heavy plate mill,the mill capacity here is the motor moment. For heavy draft,the motor would be overloaded especially for the first several passes;for small draft,the motor would be loaded slightly.All these would not be permitted to happen when calculating the loading distribution.The mill capacity indicator made the loading of mill just be in the middle,not too much and not too low.In the article,these two performance indicators were analyzed in detail.Examples of loading distribution results with different performance indicators were given by the SQP method.When making changes to the performance indicators,there would be different solutions to the loading distribution.For the optimal solutions to the mill,there was supposed to make changes to the factors of the performance indicators or upgrade the accuracy of the mathematical models of the rolling process.展开更多
In this contribution we present an online scheduling algorithm for a real world multiproduct batch plant. The overall mixed integer nonlinear programming (MINLP) problem is hierarchically structured into a mixed integ...In this contribution we present an online scheduling algorithm for a real world multiproduct batch plant. The overall mixed integer nonlinear programming (MINLP) problem is hierarchically structured into a mixed integer linear programming (MILP) problem first and then a reduced dimensional MINLP problem, which are optimized by mathematical programming (MP) and genetic algorithm (GA) respectively. The basis idea relies on combining MP with GA to exploit their complementary capacity. The key features of the hierarchical model are explained and illustrated with some real world cases from the multiproduct batch plants.展开更多
Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a r...Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a real project and production environment.To solve MS-RCPSP,it is an efficient method to use dispatching rules combined with a parallel scheduling mechanism to generate a scheduling scheme.This paper proposes an improved gene expression programming(IGEP)approach to explore newly dispatching rules that can broadly solve MS-RCPSP.A new backward traversal decoding mechanism,and several neighborhood operators are applied in IGEP.The backward traversal decoding mechanism dramatically reduces the space complexity in the decoding process,and improves the algorithm’s performance.Several neighborhood operators improve the exploration of the potential search space.The experiment takes the intelligent multi-objective project scheduling environment(iMOPSE)benchmark dataset as the training set and testing set of IGEP.Ten newly dispatching rules are discovered and extracted by IGEP,and eight out of ten are superior to other typical dispatching rules.展开更多
The sugarcane transport system plays a critical role in the overall performance of Australia’s sugarcane industry. An inefficient sugarcane transport system interrupts the raw sugarcane harvesting process, delays the...The sugarcane transport system plays a critical role in the overall performance of Australia’s sugarcane industry. An inefficient sugarcane transport system interrupts the raw sugarcane harvesting process, delays the delivery of sugarcane to the mill, deteriorates the sugar quality, increases the usage of empty bins, and leads to the additional sugarcane production costs. Due to these negative effects, there is an urgent need for an efficient sugarcane transport schedule that should be developed by the rail schedulers. In this study, a multi-objective model using mixed integer programming (MIP) is developed to produce an industry-oriented scheduling optimiser for sugarcane rail transport system. The exact MIP solver (IBM ILOG-CPLEX) is applied to minimise the makespan and the total operating time as multi-objective functions. Moreover, the so-called Siding neighbourhood search (SNS) algorithm is developed and integrated with Sidings Satisfaction Priorities (SSP) and Rail Conflict Elimination (RCE) algorithms to solve the problem in a more efficient way. In implementation, the sugarcane transport system of Kalamia Sugar Mill that is a coastal locality about 1050 km northwest of Brisbane city is investigated as a real case study. Computational experiments indicate that high-quality solutions are obtainable in industry-scale applications.展开更多
The investment decision making of Project Gang, the projects that are associated with one another on economy and technique, is studied. In order to find out the best Scheme that can make the maximum profit, a dynami...The investment decision making of Project Gang, the projects that are associated with one another on economy and technique, is studied. In order to find out the best Scheme that can make the maximum profit, a dynamic programming algorithm on the investment decision making of Project Gang is brought forward, and this algorithm can find out the best Scheme of distributing the m resources to the n Items in the time of O(m 2 n).展开更多
A method of minimizing rankings inconsistency is proposed for a decision-making problem with rankings of alternatives given by multiple decision makers according to multiple criteria. For each criteria, at first, the ...A method of minimizing rankings inconsistency is proposed for a decision-making problem with rankings of alternatives given by multiple decision makers according to multiple criteria. For each criteria, at first, the total inconsistency between the rankings of all alternatives for the group and the ones for every decision maker is defined after the decision maker weights in respect to the criteria are considered. Similarly, the total inconsistency between their final rankings for the group and the ones under every criteria is determined after the criteria weights are taken into account. Then two nonlinear integer programming models minimizing respectively the two total inconsistencies above are developed and then transformed to two dynamic programming models to obtain separately the rankings of all alternatives for the group with respect to each criteria and their final rankings. A supplier selection case illustrated the proposed method, and some discussions on the results verified its effectiveness. This work develops a new measurement of ordinal preferences’ inconsistency in multi-criteria group decision-making (MCGDM) and extends the cook-seiford social selection function to MCGDM considering weights of criteria and decision makers and can obtain unique ranking result.展开更多
In this paper, we propose a multi-criteria machine-schedules decision making method that can be applied to a produc-tion environment involving several unrelated parallel machines and we will focus on three objectives:...In this paper, we propose a multi-criteria machine-schedules decision making method that can be applied to a produc-tion environment involving several unrelated parallel machines and we will focus on three objectives: minimizing makespan, total flow time, and total number of tardy jobs. The decision making method consists of three phases. In the first phase, a mathematical model of a single machine scheduling problem, of which the objective is a weighted sum of the three objectives, is constructed. Such a model will be repeatedly solved by the CPLEX in the proposed Multi-Objective Simulated Annealing (MOSA) algorithm. In the second phase, the MOSA that integrates job clustering method, job group scheduling method, and job group – machine assignment method, is employed to obtain a set of non-dominated group schedules. During this phase, CPLEX software and the bipartite weighted matching algorithm are used repeatedly as parts of the MOSA algorithm. In the last phase, the technique of data envelopment analysis is applied to determine the most preferable schedule. A practical example is then presented in order to demonstrate the applicability of the proposed decision making method.展开更多
In recent years, it has been difficult for manufactures and suppliers to forecast demand from a market for a given product precisely. Therefore, it has become important for them to cope with fluctuations in demand. Fr...In recent years, it has been difficult for manufactures and suppliers to forecast demand from a market for a given product precisely. Therefore, it has become important for them to cope with fluctuations in demand. From this viewpoint, the problem of planning or scheduling in production systems can be regarded as a mathematical problem with stochastic elements. However, in many previous studies, such problems are formulated without stochastic factors, treating stochastic elements as deterministic variables or parameters. Stochastic programming incorporates such factors into the mathematical formulation. In the present paper, we consider a multi-product, discrete, lotsizing and scheduling problem on parallel machines with stochastic demands. Under certain assumptions, this problem can be formulated as a stochastic integer programming problem. We attempt to solve this problem by a scenario aggregation method proposed by Rockafellar and Wets. The results from computational experiments suggest that our approach is able to solve large-scale problems, and that, under the condition of uncertainty, incorporating stochastic elements into the model gives better results than formulating the problem as a deterministic model.展开更多
This paper discusses the impact of e-governance powered by blockchain in the project and program management industry. With the rise in technological innovations, many countries have turned to e-governance for efficien...This paper discusses the impact of e-governance powered by blockchain in the project and program management industry. With the rise in technological innovations, many countries have turned to e-governance for efficiency in service delivery, transparency, and decision-making. E-governance backed by blockchain technology entails improving the public services provision by implementing structures of information and communication technologies. There are many challenges with the traditional project management approach that causes organizations and its stakeholders’ cost and time. Thus, the introduction of blockchain has given many organizations a new approach to adopt in order to eliminate the challenges associated with the typical project management approach. In spite of the cutting-edge technology of blockchain and its broad applications in program management and e-governance, there are still many challenges that restrain its adoption on a broader scale. The research discusses the challenges of the blockchain deployment in the program management field and e-governance in private and government sectors and it highlights the efforts put by both sectors to make use of the technology. Also, the research covers the opportunities and the advantages of a blockchain adoption in various segments. The paper uses various case studies in the UAE, in both private and government sectors, and a qualitative research approach was implemented. The case studies were on government entities such as Smart Dubai and the Ministry of Health Prevention and also private entities like DP World and Emirates NBD. The paper concludes with recommendations and solutions on how to maximize the benefit of blockchain in the program management industry and how it is improving the decision-making process.展开更多
This paper gives integer linear programming (ILP) models for scheduling the League Phase of one of the most popular professional club competitions in the world, UEFA Champion’s League. There are 36 teams in the compe...This paper gives integer linear programming (ILP) models for scheduling the League Phase of one of the most popular professional club competitions in the world, UEFA Champion’s League. There are 36 teams in the competition, but each team plays only 8 other teams in the League Phase. Thus, the difficulty or ease of a team’s opponents, known as strength of schedule (SOS), compared to other teams will be different. Our main ILP model aims to minimize the maximum difference between SOS of any two teams, thus making the schedule as fair as possible. We also give a model for creating a timetable of all the matchups obtained by the first model. The models were implemented and tested using optimization software AMPL. Our main model obtained a schedule with a difference 0.4 between the highest and the lowest SOS, while that difference is 19 for the actual 2024-2025 competition. Thus, our model returns a schedule that is significantly fairer compared to the actual competition.展开更多
基金Item Sponsored by National Natural Science Foundation of China (71171038,71021061 )Fundamental Research Funds for Central Universities of China (N100504001)
文摘The steelmaking process scheduling problem by considering variable electricity price (SMSPVEP) was in- vestigated. A decomposition approach was proposed for the SMSPVEP. At the first stage, mathematical program-ming was utilized to minimize the maximum completion time for each cast without considering variable electricity price. At the second stage, based on obtained relative schedules of all casts, a mathematical model was formulated with an objective of minimizing the energy cost for all casts scheduling problem. The two-stage models were tested on randomly generated instances based on the practical process in a Chinese steelmaking plant. Computational results demonstrate the effectiveness of the proposed approach.
文摘The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...
基金Item Sponsored by National Natural Science Foundation of China(61174187,71021061,60974091,61104174)Startup Fund of Northeastern University of China(29321006)Basic Scientific Research Foundation of Northeast University of China(N110208001)
文摘The models, algorithms and implementation results of a computerized scheduling system were introduced for the steelmaking-continuous casting process (SCCP) of a steel plant in China. The scheduling of SCCP in this plant required that each cast plan should be processed on time, the charges in the same cast should be processed con- tinuously on the same caster, and the waiting time of the charges which are in front of each caster cannot exceed the given threshold. At the same time, the processing time of charges cannot be conflicted mutually in the same convert- ers or refining furnaces. Based on the research background, a hybrid optimal scheduling approach and its application were discussed. Aiming at the main equipment scheduling, an optimal scheduling method was proposed which con- sisted of equipment assignment algorithm based on dynamic program (DP) technique and conflict elimination algo rithm based on linear program (LP) technique. The approach guarantees that the charges are continuously processed on the same caster. Meanwhile, the requirement for high temperature ladle can also be satisfied due to the ladle matching function. Numerical results demonstrate solution quality, computational efficiency, and values of the mod els and algorithm.
基金supported by the National Natural Science Foundation of China(6157328561305133)
文摘This paper researches the adaptive scheduling problem of multiple electronic support measures(multi-ESM) in a ground moving radar targets tracking application. It is a sequential decision-making problem in uncertain environment. For adaptive selection of appropriate ESMs, we generalize an approximate dynamic programming(ADP) framework to the dynamic case. We define the environment model and agent model, respectively. To handle the partially observable challenge, we apply the unsented Kalman filter(UKF) algorithm for belief state estimation. To reduce the computational burden, a simulation-based approach rollout with a redesigned base policy is proposed to approximate the long-term cumulative reward. Meanwhile, Monte Carlo sampling is combined into the rollout to estimate the expectation of the rewards. The experiments indicate that our method outperforms other strategies due to its better performance in larger-scale problems.
基金Supported by the key project of science and technology plan in the Guangxi Zhuang Autonomous Region China(0630005-8)
文摘An analysis of the key factors affecting on the single production process job scheduling of the parts waiting for be- ing processed on the key equipments for SMEs (Small Manufacturing Enterprises) is given in this paper,which include interval number,real number and uncertain linguistic value.A kind of hybrid multi-attribute decision making method for the single pro- duction process job scheduling is presented in this paper,that the parts are firstly sorted about each factor,and then the total evalu- ative attributive value of each part is calculated with the method of weighted arithmetic average,and thus the part with the highest total evaluative attributive value is chosen for being processed firstly.The mathematic model corresponding to the method is set up in this paper.An example is studied in this paper,and the results of the example testify the correctness of this model.
基金National Natural Science Foundation of China(No.51405403)the Fundamental Research Funds for the Central Universities,China(No.2682014BR019)the Scientific Research Program of Education Bureau of Sichuan Province,China(No.12ZB322)
文摘Production scheduling has a major impact on the productivity of the manufacturing process. Recently, scheduling problems with deteriorating jobs have attracted increasing attentions from researchers. In many practical situations,it is found that some jobs fail to be processed prior to the pre-specified thresholds,and they often consume extra deteriorating time for successful accomplishment. Their processing times can be characterized by a step-wise function. Such kinds of jobs are called step-deteriorating jobs. In this paper,parallel machine scheduling problem with stepdeteriorating jobs( PMSD) is considered. Due to its intractability,four different mixed integer programming( MIP) models are formulated for solving the problem under consideration. The study aims to investigate the performance of these models and find promising optimization formulation to solve the largest possible problem instances. The proposed four models are solved by commercial software CPLEX. Moreover,the near-optimal solutions can be obtained by black-box local-search solver LocalS olver with the fourth one. The computational results show that the efficiencies of different MIP models depend on the distribution intervals of deteriorating thresholds, and the performance of LocalS olver is clearly better than that of CPLEX in terms of the quality of the solutions and the computational time.
基金The Spring Plan of Ministry of Education,China(No.Z2012017)
文摘In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.
基金supported by Nanjing University of Aeronautics and Astronautics Graduate Innovation Base(Laboratory)Open Fund(No.kfjj20200717).
文摘In order to meet the needs of collaborative decision making,considering the different demands of air traffic control units,airlines,airports and passengers in various traffic scenarios,the joint scheduling problem of arrival and departure flights is studied systematically.According to the matching degree of capacity and flow,it is determined that the traffic state of arrival/departure operation in a certain period is peak or off-peak.The demands of all parties in each traffic state are analyzed,and the mathematical models of arrival/departure flight scheduling in each traffic state are established.Aiming at the four kinds of joint operation traffic scenarios of arrival and departure,the corresponding bi-level programming models for joint scheduling of arrival and departure flights are established,respectively,and the elitism genetic algorithm is designed to solve the models.The results show that:Compared with the first-come-firstserved method,in the scenarios of arrival peak&departure off-peak and arrival peak&departure peak,the departure flight equilibrium satisfaction is improved,and the runway occupation time of departure flight flow is reduced by 38.8%.In the scenarios of arrival off-peak&departure off-peak and departure peak&arrival off-peak,the arrival flight equilibrium delay time is significantly reduced,the departure flight equilibrium satisfaction is improved by 77.6%,and the runway occupation time of departure flight flow is reduced by 46.6%.Compared with other four kinds of strategies,the optimal scheduling method can better balance fairness and efficiency,so the scheduling results are more reasonable.
文摘A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' parameters are available from the geological database of the mine. The objective is to minimize the deviation of the average ore grade of blasted blocks from the standard ore grade required by the mill. Transportation ability constraint. production quantity demand constraint. minimum safety bench constraint. block size constraint and block, bench precedence constraints are considered in forming the programming model. This model has more practical objective function and reasonable constraints compared with the existing model for this kind of problems.
基金supported by the National Key Research and Development Program of China(Basic Research Class)(No.2017YFB0903000)the National Natural Science Foundation of China(No.U1909201).
文摘To maximize the maintenance willingness of the owner of transmission lines,this study presents a transmission maintenance scheduling model that considers the energy constraints of the power system and the security constraints of on-site maintenance operations.Considering the computational complexity of the mixed integer programming(MIP)problem,a machine learning(ML)approach is presented to solve the transmission maintenance scheduling model efficiently.The value of the branching score factor value is optimized by Bayesian optimization(BO)in the proposed algorithm,which plays an important role in the size of the branch-and-bound search tree in the solution process.The test case in a modified version of the IEEE 30-bus system shows that the proposed algorithm can not only reach the optimal solution but also improve the computational efficiency.
文摘Loading distribution for heavy plate mill is to find optimal control solutions under the granted performance indicators and constraints including mill capacity and hypothesis of rolling models.The solutions are quite different for different performance indicators.In the article,the performance indicators and sequential quadratic programming(SQP for short below) methods employed in 5 000 mm heavy plate mill of BaoSteel are penetratingly analyzed.Generally,the SQP method is an effective and fast way to solve the nonlinear programming problems with small or medium scale constraints.Early in 1976,Han put forward the SQP method for the first time and Powell made it perfect and accomplished the algorithm in 1977.In fact, SQP method was to turn a nonlinear programming problem to a series of sub set of quadratic programming problems.In the algorithm,each iteration step is to solve one quadratic programming problem.The optimal solutions will be gradually approached after quadratic programming problems were totally solved.When solving the quadratic programming problem,the active set strategy were employed which turned the constrained quadratic programming problem to unconstrained quadratic programming problem.The active set strategy made the whole quadratic programming problem be solved by a least square problem.And finally, the matrix of the least square problem would be decomposed by Q matrix and R matrix.After Q matrix and R matrix were obtained,the optimal solutions would be finally found.For loading distribution,the performance indicators were composed by plate shape and draft of each pass.Plate shape is represented by rolling force gradually reduced pass by pass with a tunable factor.The mill capacity is another performance indicator represented by draft of each pass.For heavy plate mill,the mill capacity here is the motor moment. For heavy draft,the motor would be overloaded especially for the first several passes;for small draft,the motor would be loaded slightly.All these would not be permitted to happen when calculating the loading distribution.The mill capacity indicator made the loading of mill just be in the middle,not too much and not too low.In the article,these two performance indicators were analyzed in detail.Examples of loading distribution results with different performance indicators were given by the SQP method.When making changes to the performance indicators,there would be different solutions to the loading distribution.For the optimal solutions to the mill,there was supposed to make changes to the factors of the performance indicators or upgrade the accuracy of the mathematical models of the rolling process.
基金Supported by the National 973 Program of China (No. G2000263).
文摘In this contribution we present an online scheduling algorithm for a real world multiproduct batch plant. The overall mixed integer nonlinear programming (MINLP) problem is hierarchically structured into a mixed integer linear programming (MILP) problem first and then a reduced dimensional MINLP problem, which are optimized by mathematical programming (MP) and genetic algorithm (GA) respectively. The basis idea relies on combining MP with GA to exploit their complementary capacity. The key features of the hierarchical model are explained and illustrated with some real world cases from the multiproduct batch plants.
基金funded by the National Natural Science Foundation of China(Nos.51875420,51875421,52275504).
文摘Themulti-skill resource-constrained project scheduling problem(MS-RCPSP)is a significantmanagement science problem that extends from the resource-constrained project scheduling problem(RCPSP)and is integrated with a real project and production environment.To solve MS-RCPSP,it is an efficient method to use dispatching rules combined with a parallel scheduling mechanism to generate a scheduling scheme.This paper proposes an improved gene expression programming(IGEP)approach to explore newly dispatching rules that can broadly solve MS-RCPSP.A new backward traversal decoding mechanism,and several neighborhood operators are applied in IGEP.The backward traversal decoding mechanism dramatically reduces the space complexity in the decoding process,and improves the algorithm’s performance.Several neighborhood operators improve the exploration of the potential search space.The experiment takes the intelligent multi-objective project scheduling environment(iMOPSE)benchmark dataset as the training set and testing set of IGEP.Ten newly dispatching rules are discovered and extracted by IGEP,and eight out of ten are superior to other typical dispatching rules.
文摘The sugarcane transport system plays a critical role in the overall performance of Australia’s sugarcane industry. An inefficient sugarcane transport system interrupts the raw sugarcane harvesting process, delays the delivery of sugarcane to the mill, deteriorates the sugar quality, increases the usage of empty bins, and leads to the additional sugarcane production costs. Due to these negative effects, there is an urgent need for an efficient sugarcane transport schedule that should be developed by the rail schedulers. In this study, a multi-objective model using mixed integer programming (MIP) is developed to produce an industry-oriented scheduling optimiser for sugarcane rail transport system. The exact MIP solver (IBM ILOG-CPLEX) is applied to minimise the makespan and the total operating time as multi-objective functions. Moreover, the so-called Siding neighbourhood search (SNS) algorithm is developed and integrated with Sidings Satisfaction Priorities (SSP) and Rail Conflict Elimination (RCE) algorithms to solve the problem in a more efficient way. In implementation, the sugarcane transport system of Kalamia Sugar Mill that is a coastal locality about 1050 km northwest of Brisbane city is investigated as a real case study. Computational experiments indicate that high-quality solutions are obtainable in industry-scale applications.
文摘The investment decision making of Project Gang, the projects that are associated with one another on economy and technique, is studied. In order to find out the best Scheme that can make the maximum profit, a dynamic programming algorithm on the investment decision making of Project Gang is brought forward, and this algorithm can find out the best Scheme of distributing the m resources to the n Items in the time of O(m 2 n).
基金supported by the National Natural Science Foundation of China (60904059 60975049)+1 种基金the Philosophy and Social Science Foundation of Hunan Province (2010YBA104)the National High Technology Research and Development Program of China (863 Program)(2009AA04Z107)
文摘A method of minimizing rankings inconsistency is proposed for a decision-making problem with rankings of alternatives given by multiple decision makers according to multiple criteria. For each criteria, at first, the total inconsistency between the rankings of all alternatives for the group and the ones for every decision maker is defined after the decision maker weights in respect to the criteria are considered. Similarly, the total inconsistency between their final rankings for the group and the ones under every criteria is determined after the criteria weights are taken into account. Then two nonlinear integer programming models minimizing respectively the two total inconsistencies above are developed and then transformed to two dynamic programming models to obtain separately the rankings of all alternatives for the group with respect to each criteria and their final rankings. A supplier selection case illustrated the proposed method, and some discussions on the results verified its effectiveness. This work develops a new measurement of ordinal preferences’ inconsistency in multi-criteria group decision-making (MCGDM) and extends the cook-seiford social selection function to MCGDM considering weights of criteria and decision makers and can obtain unique ranking result.
文摘In this paper, we propose a multi-criteria machine-schedules decision making method that can be applied to a produc-tion environment involving several unrelated parallel machines and we will focus on three objectives: minimizing makespan, total flow time, and total number of tardy jobs. The decision making method consists of three phases. In the first phase, a mathematical model of a single machine scheduling problem, of which the objective is a weighted sum of the three objectives, is constructed. Such a model will be repeatedly solved by the CPLEX in the proposed Multi-Objective Simulated Annealing (MOSA) algorithm. In the second phase, the MOSA that integrates job clustering method, job group scheduling method, and job group – machine assignment method, is employed to obtain a set of non-dominated group schedules. During this phase, CPLEX software and the bipartite weighted matching algorithm are used repeatedly as parts of the MOSA algorithm. In the last phase, the technique of data envelopment analysis is applied to determine the most preferable schedule. A practical example is then presented in order to demonstrate the applicability of the proposed decision making method.
文摘In recent years, it has been difficult for manufactures and suppliers to forecast demand from a market for a given product precisely. Therefore, it has become important for them to cope with fluctuations in demand. From this viewpoint, the problem of planning or scheduling in production systems can be regarded as a mathematical problem with stochastic elements. However, in many previous studies, such problems are formulated without stochastic factors, treating stochastic elements as deterministic variables or parameters. Stochastic programming incorporates such factors into the mathematical formulation. In the present paper, we consider a multi-product, discrete, lotsizing and scheduling problem on parallel machines with stochastic demands. Under certain assumptions, this problem can be formulated as a stochastic integer programming problem. We attempt to solve this problem by a scenario aggregation method proposed by Rockafellar and Wets. The results from computational experiments suggest that our approach is able to solve large-scale problems, and that, under the condition of uncertainty, incorporating stochastic elements into the model gives better results than formulating the problem as a deterministic model.
文摘This paper discusses the impact of e-governance powered by blockchain in the project and program management industry. With the rise in technological innovations, many countries have turned to e-governance for efficiency in service delivery, transparency, and decision-making. E-governance backed by blockchain technology entails improving the public services provision by implementing structures of information and communication technologies. There are many challenges with the traditional project management approach that causes organizations and its stakeholders’ cost and time. Thus, the introduction of blockchain has given many organizations a new approach to adopt in order to eliminate the challenges associated with the typical project management approach. In spite of the cutting-edge technology of blockchain and its broad applications in program management and e-governance, there are still many challenges that restrain its adoption on a broader scale. The research discusses the challenges of the blockchain deployment in the program management field and e-governance in private and government sectors and it highlights the efforts put by both sectors to make use of the technology. Also, the research covers the opportunities and the advantages of a blockchain adoption in various segments. The paper uses various case studies in the UAE, in both private and government sectors, and a qualitative research approach was implemented. The case studies were on government entities such as Smart Dubai and the Ministry of Health Prevention and also private entities like DP World and Emirates NBD. The paper concludes with recommendations and solutions on how to maximize the benefit of blockchain in the program management industry and how it is improving the decision-making process.
文摘This paper gives integer linear programming (ILP) models for scheduling the League Phase of one of the most popular professional club competitions in the world, UEFA Champion’s League. There are 36 teams in the competition, but each team plays only 8 other teams in the League Phase. Thus, the difficulty or ease of a team’s opponents, known as strength of schedule (SOS), compared to other teams will be different. Our main ILP model aims to minimize the maximum difference between SOS of any two teams, thus making the schedule as fair as possible. We also give a model for creating a timetable of all the matchups obtained by the first model. The models were implemented and tested using optimization software AMPL. Our main model obtained a schedule with a difference 0.4 between the highest and the lowest SOS, while that difference is 19 for the actual 2024-2025 competition. Thus, our model returns a schedule that is significantly fairer compared to the actual competition.