期刊文献+
共找到444篇文章
< 1 2 23 >
每页显示 20 50 100
Temporary plugging agent transport behavior within visualized multi-fracture created during TPDF in a horizontal well: An experimental study
1
作者 Yu-Shi Zou Dian-Yu Li +4 位作者 Can Yang Yan-Chao Li Shi-Cheng Zhang Long-Qing Zou Xin-Fang Ma 《Petroleum Science》 2025年第9期3671-3687,共17页
Temporary plugging and diversion fracturing(TPDF)is widely used to promote the uniform and complex distribution of multi-clustered hydraulic fractures(HFs)in a horizontal well of the unconventional formations.However,... Temporary plugging and diversion fracturing(TPDF)is widely used to promote the uniform and complex distribution of multi-clustered hydraulic fractures(HFs)in a horizontal well of the unconventional formations.However,the migration behavior of temporary plugging agent(TPA),as a function of the concentration and particle size of TPA and cluster-perforation numbers,etc.,determining the effectiveness of this technique,remains unclear.Therefore,this study conducted innovatively a series of TPDF simulation experiments on transparent polymethyl methacrylate(PMMA)specimens(cubic block of 30 cm×30 cm×30 cm)to explore visually the migration behavior of TPA in multi-clustered HFs in a horizontal well.A laboratory hydraulic sandblasting perforation completion technique was implemented to simulate the multi-cluster perforations.All the distributions of wellbore,perforations,HFs,and TPA can be seen clearly inside the PMMA specimen post the experiment.The results show that there are four characteristic plugging positions for the TPA:mouth of HF,middle of HF,tip of HF,and the intersection of HFs.Small particle size TPA tends to migrate to the fracture tip for plugging,while large particle size TPA tends to plug at the fracture mouth.The migration of the TPA is influenced obviously by the morphology of the fracture wall.A smooth fracture wall is conducive to the migration of the TPA to the far end of HFs,but not conducive to generating the plugging zone and HF diversion.In contrast,a"leaf vein"fracture of rough wall is conducive to generating the plugging layer and the diversion of HFs,but not conducive to the migration of the TPA to the far end of HFs.The migration ability of TPA in a"shell"pattern is intermediate between the two above cases.Increasing TPA concentration can encourage TPA to migrate more quickly to the characteristic plugging position,and thereby to promote the creation of effective plugging and subsequently the multi-stage diversion of the HFs.Nevertheless,excessive concentration may cause the TPA to settle prematurely,affecting the propagation of the HFs to the far end.Increasing the number of clusters to a certain extent can encourage TPA to migrate into the HFs and form plugging,and promote the diversion.An evaluation system for the migration ability of granular TPA has been established,and it was calculated that when there is no plugging expectation target,the comprehensive migration ability of small particle size TPA is stronger than that of large particle size TPA.This research provides theoretical foundation for the optimization of temporary plugging parameters. 展开更多
关键词 Temporary plugging and diversion fracturing(TPDF) Polymethyl methacrylate(PMMA) Multi-cluster perforation Temporary plugging agent migration Visualization plugging position
原文传递
Structural formation and evolution mechanisms of fracture plugging zone 被引量:1
2
作者 XU Chengyuan ZHANG Jingyi +5 位作者 KANG Yili XU Feng LIN Chong YAN Xiaopeng JING Haoran SHANG Xiangyu 《Petroleum Exploration and Development》 CSCD 2021年第1期232-242,共11页
A coupled CFD-DEM method is used to simulate the formation process of fracture plugging zone.A photo-elastic system characterizing mesoscale force chain network developed by our own is used to model the pressure evolu... A coupled CFD-DEM method is used to simulate the formation process of fracture plugging zone.A photo-elastic system characterizing mesoscale force chain network developed by our own is used to model the pressure evolution in fracture plugging zone to reveal the evolution mechanism of the structure of fracture plugging zone.A theoretical basis is provided for improving the lost circulation control effect in fractured reservoirs and novel methods are proposed for selecting loss control materials and designing loss control formula.CFD-DEM simulation results show that bridging probability is the key factor determining the formation of fracture plugging zone and fracture plugging efficiency.Critical and absolute bridging concentrations are proposed as the key indexes for loss control formula design.With the increase of absolute bridging concentration,the governing factor of bridging is changed from material grain size to the combination of material grain size and friction force.Results of photo-elastic experiments show that mesoscale force chain network is the intrinsic factor affecting the evolution of pressure exerting on the fracture plugging zone and determines the macroscopic strength of fracture plugging zone.Performance parameters of loss control material affect the force chain network structure and the ratio of stronger force chain,and further impact the stability and strength of fracture plugging zone.Based on the study results,the loss control formula is optimized and new-type loss control material is designed.Laboratory experiments results show that the fracture plugging efficiency and strength is effectively improved. 展开更多
关键词 lost circulation formation damage control fracture plugging zone plugging zone structure plugging strength plugging efficiency CFD-DEM simulation photo-elastic experiment loss control material
在线阅读 下载PDF
Plugging mode of flaky lost circulation materials within fractures and mechanism to enhance pressure-bearing capacity for the plugging zone
3
作者 Kun Guo Yi-Li Kang +3 位作者 Cheng-Yuan Xu Chong Lin Ling-Jie Zhang Li-Jun You 《Petroleum Science》 2025年第8期3315-3332,共18页
During drilling operations in deep fractured tight gas reservoirs,lost circulation of working fluid frequently occurs due to the formationʼs low pressure-bearing capacity.Adding lost circulation materials(LCMs)to dril... During drilling operations in deep fractured tight gas reservoirs,lost circulation of working fluid frequently occurs due to the formationʼs low pressure-bearing capacity.Adding lost circulation materials(LCMs)to drilling fluids is the most common method for controlling lost circulation.Among these,granular LCMs are widely used,but the application frequency of flaky LCMs has been increasing annually due to their unique morphology.However,the migration and plugging behavior of flaky LCMs within fractures,and the mechanisms enhancing the pressure-bearing capacity of the plugging zone are not well understood.Therefore,this study conducted visual plugging experiments and dynamic fracture plugging experiments to evaluate the plugging mode and pressure-bearing capacity of the plugging slurry with various particle sizes and concentrations of flaky LCMs.The experimental results demonstrate that the fracture plugging process can be divided into four stages:uniform flow stage of the plugging slurry,formation and development stage of the bridging area,formation and development stage of the plugging area,and pressure-bearing stage of the plugging zone.The inclusion of flaky LCMs notably reduces the duration of stages 1 and 2,while simultaneously increasing the proportion of the plugging zone and enhancing its surface porosity.Flaky LCMs reduce the effective fracture width through“interception”and“co-bridging”modes,thus improving plugging zone formation efficiency.Appropriate particle size and concentration of flaky LCMs increase the area and length of the plugging zone.This reduces the fracture width increment caused by injection pressure and enhances frictional force between the plugging zone and fracture surface,thereby improving the pressure-bearing capacity of the plugging zone.However,excessively high concentrations of flaky LCMs result in decreased structural stability of the plugging zone,and excessively large particle sizes increase the risk of plugging outside fracture inlet.The recommended concentration of flaky LCMs in the plugging slurry is 2%–3%,with a particle size 1.2 to 1.5 times that of the bridging granular LCMs and not exceeding twice the fracture width.This study provides a theoretical foundation for selecting LCMs and designing plugging formulations for field applications. 展开更多
关键词 Lost circulation Flaky lost circulation materials Fracture plugging zone Visualization Pressure-bearing capacity
原文传递
Preparation and Application of an Epoxy Soybean Oil-Based Plugging Agent
4
作者 Yongming Li Dingyuan Zhang +1 位作者 Yadong Chen Jiandu Ye 《Fluid Dynamics & Materials Processing》 2025年第2期261-277,共17页
Resin plugging agents play a pivotal role in addressing casing damage in oil and gas fields.However,the widespread use of epoxy resin is constrained by its high cost and non-renewable origin,while plant-based resins o... Resin plugging agents play a pivotal role in addressing casing damage in oil and gas fields.However,the widespread use of epoxy resin is constrained by its high cost and non-renewable origin,while plant-based resins often suffer from inadequate mechanical properties,which limit their effectiveness in such applications.This study introduces BEOPA,an innovative,renewable,high-strength resin plugging agent derived from epoxidized soybean oil(ESO)and enhanced with bisphenol A-type benzoxazine(BZ).In this study,the synthesis process,reactionmechanism,and application performance of this novelmaterial are systematically presented,explored and optimized.It is shown that the optimal formulation of BEOPA includes 41.4 wt%ESO,24.8 wt%BZ,24.8 wt%methylhexahydrophthalic anhydride(MHHPA),8.2 wt%styrene(ST),and 0.8 wt%N,N-dimethylbenzylamine(BDMA),yielding an impressive compressive strength of 93.7 MPa.The integration of ESO and BZ creates an intricate and robust double crosslinking network,significantly enhancing material strength and durability.BEOPA exhibits a tunable curing time,ranging from 0.5 to 15 h,with viscosities below 300 mPa⋅s at 25℃and 75mPa⋅s at 50℃.Furthermore,it demonstrates exceptional thermal stability within the 100℃-150℃range,even in environments with mineral salt concentrations as high as 43,330 mg/L.Remarkably,BEOPA achieves superior plugging performance,sustaining breakthrough pressures exceeding 29.7 MPa in 1 mm crack cores. 展开更多
关键词 Casing damage epoxidized soybean oil BENZOXAZINE mechanical properties plugging properties
在线阅读 下载PDF
Experimental study of a circulation agent dynamic plugging for multi-scale natural fractures
5
作者 Zhao-Wen Hu Yi-Qun Zhang +3 位作者 Jin-Shan Wang Xin-Yu Wang Yu Qin Ya Liu 《Petroleum Science》 2025年第9期3641-3654,共14页
Lost circulation critically jeopardizes drilling safety and efficiency,and remains an unresolved challenge in oil and gas engineering.In this paper,by utilizing the self-developed dynamic plugging apparatus and synthe... Lost circulation critically jeopardizes drilling safety and efficiency,and remains an unresolved challenge in oil and gas engineering.In this paper,by utilizing the self-developed dynamic plugging apparatus and synthetic cores containing large-scale fractures,experimental research on the circulation plugging of different materials was conducted.Based on the D90 rule and fracture mechanical aperture model,we analyze the location of plugging layer under dynamic plugging mechanism.By setting different parameters of fracture width and injection pressure,the laws of cyclic plugging time,pressure bearing capacity and plugging layers formation were investigated.The results show that the comprehensive analysis of particle size and fracture aperture provides an accurate judgment of the entrance-plugging phenomenon.The bridging of solid materials in the leakage channel is a gradual process,and the formation of a stable plug requires 2–3 plug-leakage cycles.The first and second cyclic plugging time was positively correlated with the fracture width.Different scales of fractures were successfully plugged with the bearing pressure greater than 6 MPa,but there were significant differences in the composition of the plugging layer.The experimental results can effectively prove that the utilized plugging agent is effective and provides an effective reference for dynamic plugging operation. 展开更多
关键词 Dynamic plugging Large scale fracture Lost circulation material Laboratory experiments Fracture aperture
原文传递
Enhancing uniformity of multi-fracture propagation by temporary plugging and diversion fracturing in a horizontal well with multicluster perforations
6
作者 Xin Chang Shi-Long Teng +2 位作者 Xing-Yi Wang Yin-Tong Guo Chun-He Yang 《Petroleum Science》 2025年第9期3688-3708,共21页
Multi-stage and multi-cluster fracturing(MMF)is a crucial technology in unconventional oil and gas development,aiming to enhance production by creating extensive fracture networks.However,achieving uniform expansion o... Multi-stage and multi-cluster fracturing(MMF)is a crucial technology in unconventional oil and gas development,aiming to enhance production by creating extensive fracture networks.However,achieving uniform expansion of multi-cluster hydraulic fractures(HFs)in MMF remains a significant challenge.Field practice has shown that the use of temporary plugging and diversion fracturing(TPDF)can promote the balanced expansion of multi-cluster HFs.This study conducted TPDF experiments using a true triaxial fracturing simulation system setting a horizontal well completion with multi-cluster jetting perforations to investigate the equilibrium initiation and extension of multi-cluster fractures.The influence of key parameters,including cluster spacing,fracturing fluid viscosity,differential stress,and fracturing fluid injection rate,on fracture initiation and propagation was systematically examined.The results indicate that while close-spaced multi-cluster fracturing significantly increases the number of HFs,it also leads to uneven extension of HFs in their propagation.In contrast,TPDF demonstrates effectiveness in mitigating uneven HF extension,increasing the number of HFs,and creating a larger stimulated reservoir volume,ultimately leading to improved oil and gas well productivity.Moreover,under conditions of high differential stress,the differential stress within the formation exerts a stronger guiding effect in HFs,which are more closely aligned with the minimum principal stress.Low-viscosity fluids facilitate rapid and extensive fracture propagation within the rock formation.High-volume fluid injection,on the other hand,more comprehensively fills the formation.Therefore,employing lowviscosity and high-volume fracturing is advantageous for the initiation and extension of multi-cluster HFs. 展开更多
关键词 Non-uniformity of fracture propagation Temporary plugging and diversion FRACTURING Multi-cluster hydraulic fracturing Fracture propagation
原文传递
Plugging behaviors of temporary plugging particles in hydraulic fractures 被引量:4
7
作者 GUO Jianchun ZHAN Li +5 位作者 LU Qianli QI Tianjun LIU Yuxuan WANG Xin CHEN Chi GOU Xinghao 《Petroleum Exploration and Development》 SCIE 2023年第2期464-472,共9页
Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experim... Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experimentally analyzed under the conditions of different carrier fluid displacements and viscosities. The results show that the greater the carrier fluid viscosity and displacement, the more difficult it is to form a plugging layer, and that the larger the size and concentration of the temporary plugging particle, the less difficult it is to form a plugging layer. When the ratio of particle size to fracture width is 0.45, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle and the viscosity of the carrier fluid, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 20 kg/m^(3)or the viscosity of the carrier fluid is greater than 3 mPa·s. When the ratio of particle size to fracture width is 0.60, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 10 kg/m^(3). When the ratio of particle size to fracture width is 0.75, the formation of the plugging layer is basically not affected by other parameters, and a stable plugging layer can form within the experimental conditions. The formation process of plugging layer includes two stages and four modes. The main controlling factors affecting the formation mode are the ratio of particle size to fracture width, carrier fluid displacement and carrier fluid viscosity. 展开更多
关键词 hydraulic fracture temporary plugging and diversion temporary plugging particle plugging characteristics construction parameters combination
在线阅读 下载PDF
Formation mechanisms of fracture plugging zone and optimization of plugging particles 被引量:2
8
作者 LEI Shaofei SUN Jinsheng +5 位作者 BAI Yingrui LYU Kaihe ZHANG Shupei XU Chengyuan CHENG Rongchao LIU Fan 《Petroleum Exploration and Development》 CSCD 2022年第3期684-693,共10页
As formation mechanisms of plugging zone and criteria for fracture plugging remain unclear,plugging experiments and methods testing granular material mechanical properties are used to study the formation process of th... As formation mechanisms of plugging zone and criteria for fracture plugging remain unclear,plugging experiments and methods testing granular material mechanical properties are used to study the formation process of the plugging zone in fractured formations,analyze composition and ratios of different sizes of particles in the plugging zone,and reveal the essence and driving energy of the formation and damage of the plugging zone.New criteria for selecting lost circulation materials are proposed.The research results show that the formation of the plugging zone has undergone a process from inertial flow,elastic flow,to quasi-static flow.The plugging zone is composed of fracture mouth plugging particles,bridging particles and filling particles,and the proportion of the three types of particles is an important basis for designing drilling fluid loss control formula.The essence of the construction of the plugging zone is non-equilibrium Jamming phase transition.The response of the plugging zone particle system to pressure is driven by entropy force;the greater the entropy,the more stable the plugging zone.Lost circulation control formula optimized according to the new criteria has better plugging effect than the formula made according to conventional plugging rules and effectively improves the pressure-bearing capacity of the plugging zone.The research results provide a theoretical and technical basis for the lost circulation control of fractured formations. 展开更多
关键词 fractured formation drilling fluid loss plugging zone plugging mechanism plugging particles optimization criterion
在线阅读 下载PDF
Study on the Plugging System of the Lower Ancient High Loss Zone in Changqing Gas Field
9
作者 Yan Gao Zuwen Wang +2 位作者 Xiuli Shao Dichen Tan Erping Liu 《Open Journal of Yangtze Oil and Gas》 2021年第1期1-12,共12页
At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must b... At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must be plugged before the well can be killed. In particular, the fracture-cavity type fractures of the lower paleocarbonate reservoirs have serious leakage. Traditional plugging materials and traditional plugging materials and methods have some limitations in dealing with leakage problems. Therefore, a composite plugging system using polymer solution as the base carrier fluid, multi-particle size rigid particles, expandable particles and modified fibers is developed. Its formula is: water + 2% polyacrylamide + 0.1% N, N-methylene bisacrylamide polymer gel is the base carrier fluid;the formulation of the particle plugging agent was continuously optimized through the CDL-II high temperature and high pressure dynamic and static plugging ability to plug the core. The final formulation of the plugging agent is: 1) 20% rigid particles (5 mm, 1 mm, 0.5 mm CCP-3 ratio 4:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10;2) 20% rigid particles (3 mm, 0.1 mm, 0.05 mm CCP-3 ratio 3:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10. The water swelling multiples of the granular plugging agent in salt water are all above 7 times, which meets the requirements of leak-proof plugging operations under high salinity;3% HCl is selected as the gel breaker, and the plugging system has a gel breaking rate of 95%;through the water plugging and profile control experimental system, the sand-filled pipe is used to simulate the plugging effect under high temperature and high pressure, and the plugging system can be sealed for 5 days at a high temperature of 110°C and a high pressure of 20 MPa to achieve a good plugging of the formation. It is expected that the developed plugging system has a good application prospect in future workover operations. 展开更多
关键词 Lower Ancient High Loss Layer plugging Gel Particle plugging Agent Gel Breaking Performance plugging Performance
在线阅读 下载PDF
Synthesis and Evaluation of a Water-Swelling Polymer Plugging Agent SWL-1
10
作者 Li He Qichao Cao +1 位作者 Xintong Li Song Wang 《Open Journal of Yangtze Oil and Gas》 2021年第2期50-59,共10页
In this paper, to solve the problems of low water absorption and weak pressure bearing capacity of current plugging materials, acrylic acid (AA), acrylamide (AM), and sodium allyl sulfonate (SAS) are used as monomers,... In this paper, to solve the problems of low water absorption and weak pressure bearing capacity of current plugging materials, acrylic acid (AA), acrylamide (AM), and sodium allyl sulfonate (SAS) are used as monomers, and soluble starch is used as grafting. Material, the use of free radical aqueous solution method to synthesize the plugging agent SWL-1 with good water absorption and strong salt resistance. The monomer ratio is set as n (AA):n (AM):n (SAS) = 5:2:1, the experimental synthesis temperature is 70°C, and the orthogonal experiment is used to determine the experimental synthesis conditions as AA neutralization degree 80%, The amount of initiator is 0.60%, the amount of crosslinking agent is 0.50%, the ratio of monomer to starch is 7:1, and the amount of calcium carbonate is 13%. The comprehensive evaluation of the performance of the plugging agent SWL-1 shows that the water absorption performance at 60°C is the best 268.78 g/g, and the water absorption performance in 8% NaCl, 0.9% CaCl<sub>2</sub> and composite brine is 21.5 g/g, 12.5 g/g and 24.9 g/g, indicating good resistance to sodium and calcium, the water retention rate is still higher than 30% after 15 days at 160°C. The sand bed plugging test found that the maximum pressure of SWL-1 was 7 MPa, and the crack plugging test found that when the crack width was 1 mm, 2 mm, and 3 mm, the maximum compressive strength of SWL-1 was 10 MPa. The acid solubility test showed that the maximum pressure was 10 MPa. The highest rate is 86.38%. 展开更多
关键词 plugging Agent Water Absorption Sand Bed plugging Crack plugging Acid Solubility
在线阅读 下载PDF
Development and Application of TL-1 New High Temperature and High Pressure Plugging Instrument
11
作者 Yanlin Zou Chunzhi Luo +2 位作者 Baijing Wang Huan Zhang Chunjun Zhang 《Open Journal of Yangtze Oil and Gas》 2021年第3期107-115,共9页
In view of the fact that most of the filter media of existing plugging evaluation instruments use steel plates or steel balls, which cannot truly simulate the characteristics of the formation, a new type of TL-1 high ... In view of the fact that most of the filter media of existing plugging evaluation instruments use steel plates or steel balls, which cannot truly simulate the characteristics of the formation, a new type of TL-1 high temperature and high pressure plugging instrument has been developed. The filter medium of the instrument is the natural stone with different cracks and quartz sand beds with different particle sizes, which can better simulate the adsorption and hang-up effect of the formation on the plugging agent. It is possible to evaluate the plugging effect, pressure-bearing capacity and return pressure of the plugging slurry for different cracks and sand beds of different sizes under different temperatures and pressures. Using new and old instruments to evaluate the plugging effect of the same plugging slurry, it is found that the plugging effect is different from the distribution of the plugging material on the crack surface, the plugging effect and the pressure bearing capacity. The instrument is stable and reliable in operation and simple in operation. It is a new instrument for conducting research on anti-leakage plugging materials and anti-leakage plugging drilling fluid systems. 展开更多
关键词 plugging Device Filter Medium plugging Experiment plugging Formula
在线阅读 下载PDF
Complex fracture propagation model and plugging timing optimization for temporary plugging fracturing in naturally fractured shale 被引量:4
12
作者 TANG Xuanhe ZHU Haiyan +1 位作者 CHE Mingguang WANG Yonghui 《Petroleum Exploration and Development》 2023年第1期152-165,共14页
In this paper,a viscoelasticity-plastic damage constitutive equation for naturally fractured shale is deduced,coupling nonlinear tensile-shear mixed fracture mode.Dynamic perforation-erosion on fluid re-distribution a... In this paper,a viscoelasticity-plastic damage constitutive equation for naturally fractured shale is deduced,coupling nonlinear tensile-shear mixed fracture mode.Dynamic perforation-erosion on fluid re-distribution among multi-clusters are considered as well.DFN-FEM(discrete fracture network combined with finite element method)was developed to simulate the multi-cluster complex fractures propagation within temporary plugging fracturing(TPF).Numerical results are matched with field injection and micro-seismic monitoring data.Based on geomechanical characteristics of Weiyuan deep shale gas reservoir in Sichuan Basin,SW China,a multi-cluster complex fractures propagation model is built for TPF.To study complex fractures propagation and the permeability-enhanced region evolution,intersecting and competition mechanisms between the fractures before and after TPF treatment are revealed.Simulation results show that:fracture from middle cluster is restricted by the fractures from side-clusters,and side-clusters plugging is benefit for multi fractures propagation in uniformity;optimized TPF timing should be delayed within a higher density or strike of natural fractures;Within a reservoir-featured natural fractures distribution,optimized TPF timing for most clustered method is 2/3 of total fluid injection time as the optimal plugging time under different clustering modes. 展开更多
关键词 shale gas naturally fractured shale temporary plugging fracturing fracture propagation plugging timing discrete fracture network finite element method
在线阅读 下载PDF
Fracture propagation law of temporary plugging and diversion fracturing in shale reservoirs under completion experiments of horizontal well with multi-cluster sand jetting perforation 被引量:2
13
作者 ZOU Yushi LI Yanchao +3 位作者 YANG Can ZHANG Shicheng MA Xinfang ZOU Longqing 《Petroleum Exploration and Development》 SCIE 2024年第3期715-726,共12页
This study conducted temporary plugging and diversion fracturing(TPDF)experiments using a true triaxial fracturing simulation system within a laboratory setting that replicated a lab-based horizontal well completion w... This study conducted temporary plugging and diversion fracturing(TPDF)experiments using a true triaxial fracturing simulation system within a laboratory setting that replicated a lab-based horizontal well completion with multi-cluster sand jetting perforation.The effects of temporary plugging agent(TPA)particle size,TPA concentration,single-cluster perforation number and cluster number on plugging pressure,multi-fracture diversion pattern and distribution of TPAs were investigated.A combination of TPAs with small particle sizes within the fracture and large particle sizes within the segment is conducive to increasing the plugging pressure and promoting the diversion of multi-fractures.The addition of fibers can quickly achieve ultra-high pressure,but it may lead to longitudinal fractures extending along the wellbore.The temporary plugging peak pressure increases with an increase in the concentration of the TPA,reaching a peak at a certain concentration,and further increases do not significantly improve the temporary plugging peak pressure.The breaking pressure and temporary plugging peak pressure show a decreasing trend with an increase in single-cluster perforation number.A lower number of single-cluster perforations is beneficial for increasing the breaking pressure and temporary plugging peak pressure,and it has a more significant control on the propagation of multi-cluster fractures.A lower number of clusters is not conducive to increasing the total number and complexity of artificial fractures,while a higher number of clusters makes it difficult to achieve effective plugging.The TPAs within the fracture is mainly concentrated in the complex fracture areas,especially at the intersections of fractures.Meanwhile,the TPAs within the segment are primarily distributed near the perforation cluster apertures which initiated complex fractures. 展开更多
关键词 shale temporary plugging and diversion fracturing multi-cluster sand jetting perforation distribution of temporary plugging agent fracture propagation law
在线阅读 下载PDF
Combination of Plugging and Acidization Improves Injection Profile
14
作者 赵普春 赵化廷 杨新明 《Petroleum Science》 SCIE CAS CSCD 2004年第4期77-87,共11页
Plugging agent treatment and acid stimulation have completely different mechanisms for improving injection profiles. In this paper, a hybrid procedure is introduced to reduce the damage of the plugging agent to low a... Plugging agent treatment and acid stimulation have completely different mechanisms for improving injection profiles. In this paper, a hybrid procedure is introduced to reduce the damage of the plugging agent to low and medium permeability zones and the penetration radius of acid into high permeability zones. The procedure is: First inject plugging agent to block high permeability zones, and then inject acid to remove plugging agent damage from the low and medium permeability zones and stimulate them. To perform this procedure successfully, three kinds of plugging agents, namely strong strength plugging agent for the wells with fractures or high permeability streaks, weak gel for those with thick layer in which serious heterogeneity exists, temporary plugging agent for those in which the absorption ability of high permeability zones needs maintaining, were screened out for use in different reservoirs. Several acid systems were evaluated to be compatible with the three kinds of plugging agents. The objectives of this paper are:(1)To show the screen results about the compatible plugging agent and acid; 2 To show how to optimize the operation process;(3)To tell some experience gained ( ) from the oilfield applications of this technique. From Jan. 2001 to Dec. 2002, 46 operations using this procedure were carried out in Weicheng and Mazhai Oilfields of SINOPEC. Results show that the average benefit/cost ratio is over 3.5. Experience acquired from these applications was summarized in the paper. 展开更多
关键词 Profile Control plugging and acid inject profile IMPROVE TECHNIQUE
原文传递
LEAKAGE-PLUGGING WHILE DRILLING AND PLUGGING AGENTS 被引量:1
15
作者 Peng Zhenbin Zhang Xuzhi Dai Qianwei(Department of Geology, Central South University ofTechnology, Changsha 410083, China) 《Journal of Central South University》 SCIE EI CAS 1996年第1期29-32,共4页
This paper describes a series of plugging agents which have been developed these years by the authors. The features of these agents can bestated as: (1) Stopping losses without stopping drilling; (2) High ratio of suc... This paper describes a series of plugging agents which have been developed these years by the authors. The features of these agents can bestated as: (1) Stopping losses without stopping drilling; (2) High ratio of success; (3) Improving fluids properties; (4) Suiting to many types of losses, even large cracks and caves; (5) Perfect efficiency in different conditions of pollution such as calcium, salt pollution and high temperature; (6) Sufficient resources of raw materials, nopoison, noharm, no pollution to the environment; (7) Convenience in use; (8) Lower cost. The properties, mechanisms and applications of these agents are also described in this paper. 展开更多
关键词 Leakageplugging DRILLING plugging AGENTS
在线阅读 下载PDF
New method for plugging channeling in oil field by nitrogen foam
16
作者 杨朝蓬 高树生 +3 位作者 岳湘安 吕毓刚 睢宏刚 魏浩光 《Journal of Central South University》 SCIE EI CAS 2014年第2期677-683,共7页
In order to present a new method for plugging channeling in oil field,the injection modes and validity period of foam system which plugged the formation water layer were studied by means of the experimental model whic... In order to present a new method for plugging channeling in oil field,the injection modes and validity period of foam system which plugged the formation water layer were studied by means of the experimental model which simulated the real conditions of oil wells existing channeling.Above all,the influence factors including reservoir pressure,permeability,oil saturation and gas-to-liquid ratio were studied through dynamic experiment.Then,in light of the technology characteristics of foam injection in oil field,the comparison between gas-liquid and liquid-gas injection modes was studied.The result shows that the gas-liquid injection mode can ensure the foam injectivity and plugging performance.The plugging validity of nitrogen foam injected into the formation water layer was evaluated in different plugging pressure gradients by the dynamic method which is more reasonable than the static evaluation method in laboratory.The research demonstrates that the plugging validity period of foam decreases with plugging pressure gradient increasing.If the plugging pressure gradient is 0.15 MPa/m,the validity period is 160 h.Finally,a empirical equation and a plate about the plugging validity and the plugging pressure gradient were obtained for forecasting the validity period of foam. 展开更多
关键词 foam system plugging performance CHANNELING injection mode plugging validity
在线阅读 下载PDF
Dynamic plugging regulating strategy of pipeline robot based on reinforcement learning
17
作者 Xing-Yuan Miao Hong Zhao 《Petroleum Science》 SCIE EI CAS CSCD 2024年第1期597-608,共12页
Pipeline isolation plugging robot (PIPR) is an important tool in pipeline maintenance operation. During the plugging process, the violent vibration will occur by the flow field, which can cause serious damage to the p... Pipeline isolation plugging robot (PIPR) is an important tool in pipeline maintenance operation. During the plugging process, the violent vibration will occur by the flow field, which can cause serious damage to the pipeline and PIPR. In this paper, we propose a dynamic regulating strategy to reduce the plugging-induced vibration by regulating the spoiler angle and plugging velocity. Firstly, the dynamic plugging simulation and experiment are performed to study the flow field changes during dynamic plugging. And the pressure difference is proposed to evaluate the degree of flow field vibration. Secondly, the mathematical models of pressure difference with plugging states and spoiler angles are established based on the extreme learning machine (ELM) optimized by improved sparrow search algorithm (ISSA). Finally, a modified Q-learning algorithm based on simulated annealing is applied to determine the optimal strategy for the spoiler angle and plugging velocity in real time. The results show that the proposed method can reduce the plugging-induced vibration by 19.9% and 32.7% on average, compared with single-regulating methods. This study can effectively ensure the stability of the plugging process. 展开更多
关键词 Pipeline isolation plugging robot plugging-induced vibration Dynamic regulating strategy Extreme learning machine Improved sparrow search algorithm Modified Q-learning algorithm
原文传递
Numerical Analysis of Dynamical Effects Associated with a Plugging String in a Horizontal Well
18
作者 Guangsheng Liu Qingming Gan +4 位作者 WenWu Haitao Yang Yiming Lv Wenhao Cui Wei Lin 《Fluid Dynamics & Materials Processing》 EI 2023年第5期1203-1214,共12页
The finite element method has been applied to simulate the dynamics of a water plugging string in a complex horizontal well of a low-permeability oilfield.The force associated with the pipe string and the packer has b... The finite element method has been applied to simulate the dynamics of a water plugging string in a complex horizontal well of a low-permeability oilfield.The force associated with the pipe string and the packer has been determined under the sucking action of the oil well pump.Such analysis has been conducted for a real drilling well,taking into account the process of lifting,lowering,unblocking and water plugging.Comparison between field measured data and simulation data indicates that the model is reliable and accurate.The packer creep effect under different pressure differences has also been investigated in the framework of the same model. 展开更多
关键词 Water plugging string horizontal well creep effect mechanical water plugging
在线阅读 下载PDF
Study on Plugging Technology in Oil Test
19
作者 Xiong Wang Lejun Liao +3 位作者 Ru Bai Fu Liu Wenwu Zheng Song Wang 《Open Journal of Yangtze Oil and Gas》 CAS 2022年第4期240-252,共13页
In view of the shortcomings of poor temperature resistance, poor pumpability and poor pressure-bearing capacity of commonly used gel plugging materials, polyacrylamide (HPAM) and N,N-methylene bisacrylamide (BIS) were... In view of the shortcomings of poor temperature resistance, poor pumpability and poor pressure-bearing capacity of commonly used gel plugging materials, polyacrylamide (HPAM) and N,N-methylene bisacrylamide (BIS) were selected for crosslinking and compounding to make a new type of gel plugging material with high temperature and pressure resistance. The compressive strength and yield stress were measured by inverted observation method to evaluate the gel strength. The anti-temperature, anti-pressure, anti-dilution and gel-breaking properties of the gel were evaluated. Finally, 71 type high temperature and high pressure water loss instrument and high temperature and high pressure filter with slit plate were used to evaluate the plugging capacity of gel plugging agent. The experimental results show that the new gel plugging system between 100°C - 120°C, gelation time can be controlled at about 5 h;it has strong temperature resistance, compression resistance, dilution resistance and gel breaking performance. In the face of permeability and fracture leakage simulation experiments, when the ambient temperature below 120°C, pressure within 5 MPa, the filter loss of gel plugging agent is far less than the market two conventional plugging agent, has excellent plugging performance. 展开更多
关键词 Changqing Oilfield LEAKAGE New Gel plugging Agent Gel Strength Temperature and Salt Resistance plugging Performance
在线阅读 下载PDF
Research and Application of High-pressure Jet Plugging Removal Technology
20
作者 WANGDesheng 《外文科技期刊数据库(文摘版)工程技术》 2022年第9期197-203,共7页
Aiming at the problems that there are a lot of dead oil, wax and other pollutants in the casing wall, perforation hole and near-well zone of oil wells, which result in the limited flow capacity of oil wells and the de... Aiming at the problems that there are a lot of dead oil, wax and other pollutants in the casing wall, perforation hole and near-well zone of oil wells, which result in the limited flow capacity of oil wells and the decrease of production wells, the high-pressure jet compound plugging removal technology is studied. This technology has formed a composite plugging removal technique of vertical well and long well section segmented jet cleaning+chemical plugging removal, horizontal well segmented acidizing+foam mixed discharge cleaning and high pressure jet, which is suitable for Gaosheng Oilfields extremely thick and low permeability reservoir, and provides a strong technical guarantee for the efficient development of Gaosheng low permeability and extremely thick reservoir. It also provides a powerful technical reference for plugging removal of oil and water wells in other similar reservoirs, and has a good popularization and application prospect [1]. 展开更多
关键词 high pressure jet compound plugging removal physical plugging removal PROMOTION
原文传递
上一页 1 2 23 下一页 到第
使用帮助 返回顶部