In the Shenzhen region,where strong karst development is widely distributed,karst caves pose significant difficulties and risks to pile foundation construction.This paper,based on the Yanba Expressway Municipalization...In the Shenzhen region,where strong karst development is widely distributed,karst caves pose significant difficulties and risks to pile foundation construction.This paper,based on the Yanba Expressway Municipalization Reconstruction Project and referencing previous engineering experiences,proposes the application of sleeve valve pipe grouting technology for pre-treatment of small-to medium-sized and bead-shaped karst caves.Specific implementation measures and construction precautions are presented.Practical results demonstrate that the pre-treated karst cave areas achieved stable soil conditions,providing favorable prerequisites for subsequent pile foundation construction.The method proves convenient and feasible in operation,substantially reducing safety and quality risks during construction.This successful practice offers valuable experience for similar projects.展开更多
Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses durin...Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses during pile work are to be thought possible. Prior to finishing a site pre-investigation, a foundation’s area is usually sampled for statistical reasons. There are studies on pile construction outside of Bangladesh that are supported by relevant empirical data in the literature. Since Bangladesh, which is regarded as a third-world country, is ignored in this regard, the literature currently available about pile building and the associated productivity loss is unable to provide adequate information or appropriate empirical data. Due to this pile-building sector in Bangladesh has been experiencing a decline in production for quite some time now. Before attempting to increase productivity in pile construction, it is essential to investigate the potential losses and the variables that might have an influence. This study aims to accomplish the following objectives: 1) identify the primary factors that have an impact on pile construction;2) develop an SVR model that accurately predicts productivity loss;and 3) figure out the projected loss by basing it on the historical scenario that is the most comparable to the current one. A Support Vector Regression (SVR) model was developed after a study of the relevant literature. This model enabled the collection of 110 pile building projects from five significant locations in Bangladesh. The model was constructed using a list of eight inputs in addition to a list of five macro elements (labor, management, environment, material, and equipment) (soil condition, pile type, pile material, project size, project location, pile depth, pile quantity, and equipment quantity). Using 10-way cross validation, the SVR achieves an accuracy of 87.2% in its predictions. On the basis of what has occurred in the past, we are able to estimate that there will be a loss of around 18.55 percent of the total output. A new perspective for engineers studying the delay factors with productivity loss is provided by the outcome of important tasks as it relates to loss in productivity and overall factors faced. In the building construction industry, effective management should place more emphasis on the correlation between productivity loss and the factors that cause it. Therefore, to represent the effect on productivity loss, real factors can be summed up as a decline in productivity loss. The findings of the study would urge specialists to concentrate on waste as a means of increasing overall production.展开更多
With the development and progress of Chinese economy and the improvement of people's living standards, the demand for the quality of life is also higher and higher. As an important manifestation of people's qu...With the development and progress of Chinese economy and the improvement of people's living standards, the demand for the quality of life is also higher and higher. As an important manifestation of people's quality of life, housing conditions have also been widely concerned by the people. The increasing public attention not only opens a new market for the construction industry, but also puts forward higher requirements for construction. In addition to basically meet the needs of the construction period, the current construction industry also needs to meet people's personalized design needs, the artistry of buildings and the economic benefits of construction. Due to the significant advantages of pile foundation construction in construction, pile foundation construction is widely used in the construction industry. The following will be a brief analysis and Discussion on the technical points of pile foundation construction in construction engineering. This paper briefly analyzes the technical points in the construction of building pile foundation.展开更多
With the acceleration of China's urbanization process, the scale of construction projects is expanding, and the requirements for the construction of pile foundation are getting higher and higher. Pile foundation w...With the acceleration of China's urbanization process, the scale of construction projects is expanding, and the requirements for the construction of pile foundation are getting higher and higher. Pile foundation work will have a very direct impact on the building and structure. As a kind of efficient construction technology and relatively stable safety quality, how to make full use of the effectiveness of pile foundation construction technology in the actual construction process is an important problem to be solved. This paper analyzes the application of pile foundation construction technology in building pile foundation engineering.展开更多
Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get...Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get the progress by leaps and bounds, road engineering in China traditional architectural engineering, road engineering has always been about the development of China's people's daily life level and the development of the economy, but in the road engineering construction, Often face a variety of construction challenges, in actual engineering construction, due to loose soil, settlement or some other reasons, if the relevant staff careless operation, it is easy to lead to a lot of potential problems in the use of road engineering, and even bring a certain threat to people's daily use experience. In the face of these problems, it is necessary for relevant personnel to analyze the problems existing in the construction process and operate in strict accordance with the operation plan of drilling perfusion technology in road construction.展开更多
文摘In the Shenzhen region,where strong karst development is widely distributed,karst caves pose significant difficulties and risks to pile foundation construction.This paper,based on the Yanba Expressway Municipalization Reconstruction Project and referencing previous engineering experiences,proposes the application of sleeve valve pipe grouting technology for pre-treatment of small-to medium-sized and bead-shaped karst caves.Specific implementation measures and construction precautions are presented.Practical results demonstrate that the pre-treated karst cave areas achieved stable soil conditions,providing favorable prerequisites for subsequent pile foundation construction.The method proves convenient and feasible in operation,substantially reducing safety and quality risks during construction.This successful practice offers valuable experience for similar projects.
文摘Pile foundations are challenging to build due to subsurface obstacles, contractor ignorance, and difficulties with site planning. Given the unpredictable environment of the construction site, productivity losses during pile work are to be thought possible. Prior to finishing a site pre-investigation, a foundation’s area is usually sampled for statistical reasons. There are studies on pile construction outside of Bangladesh that are supported by relevant empirical data in the literature. Since Bangladesh, which is regarded as a third-world country, is ignored in this regard, the literature currently available about pile building and the associated productivity loss is unable to provide adequate information or appropriate empirical data. Due to this pile-building sector in Bangladesh has been experiencing a decline in production for quite some time now. Before attempting to increase productivity in pile construction, it is essential to investigate the potential losses and the variables that might have an influence. This study aims to accomplish the following objectives: 1) identify the primary factors that have an impact on pile construction;2) develop an SVR model that accurately predicts productivity loss;and 3) figure out the projected loss by basing it on the historical scenario that is the most comparable to the current one. A Support Vector Regression (SVR) model was developed after a study of the relevant literature. This model enabled the collection of 110 pile building projects from five significant locations in Bangladesh. The model was constructed using a list of eight inputs in addition to a list of five macro elements (labor, management, environment, material, and equipment) (soil condition, pile type, pile material, project size, project location, pile depth, pile quantity, and equipment quantity). Using 10-way cross validation, the SVR achieves an accuracy of 87.2% in its predictions. On the basis of what has occurred in the past, we are able to estimate that there will be a loss of around 18.55 percent of the total output. A new perspective for engineers studying the delay factors with productivity loss is provided by the outcome of important tasks as it relates to loss in productivity and overall factors faced. In the building construction industry, effective management should place more emphasis on the correlation between productivity loss and the factors that cause it. Therefore, to represent the effect on productivity loss, real factors can be summed up as a decline in productivity loss. The findings of the study would urge specialists to concentrate on waste as a means of increasing overall production.
文摘With the development and progress of Chinese economy and the improvement of people's living standards, the demand for the quality of life is also higher and higher. As an important manifestation of people's quality of life, housing conditions have also been widely concerned by the people. The increasing public attention not only opens a new market for the construction industry, but also puts forward higher requirements for construction. In addition to basically meet the needs of the construction period, the current construction industry also needs to meet people's personalized design needs, the artistry of buildings and the economic benefits of construction. Due to the significant advantages of pile foundation construction in construction, pile foundation construction is widely used in the construction industry. The following will be a brief analysis and Discussion on the technical points of pile foundation construction in construction engineering. This paper briefly analyzes the technical points in the construction of building pile foundation.
文摘With the acceleration of China's urbanization process, the scale of construction projects is expanding, and the requirements for the construction of pile foundation are getting higher and higher. Pile foundation work will have a very direct impact on the building and structure. As a kind of efficient construction technology and relatively stable safety quality, how to make full use of the effectiveness of pile foundation construction technology in the actual construction process is an important problem to be solved. This paper analyzes the application of pile foundation construction technology in building pile foundation engineering.
文摘Time to enter the 21st century, our country gradually moving towards modernization power, along with our country's economic strength, science and technology development, such as the country's many industry get the progress by leaps and bounds, road engineering in China traditional architectural engineering, road engineering has always been about the development of China's people's daily life level and the development of the economy, but in the road engineering construction, Often face a variety of construction challenges, in actual engineering construction, due to loose soil, settlement or some other reasons, if the relevant staff careless operation, it is easy to lead to a lot of potential problems in the use of road engineering, and even bring a certain threat to people's daily use experience. In the face of these problems, it is necessary for relevant personnel to analyze the problems existing in the construction process and operate in strict accordance with the operation plan of drilling perfusion technology in road construction.