Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mi...Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mixing by means of the fuel jet developmentperiphery charts obtained by the high speed photography with a modeling test device deve-loped by authors,and to examine it by the tests on a single cylinder diesel engine.Resultsand Conclusion The mixing process can be divided into four phases.The optimizing range of the ration of the inner chamber diameter to the cylinder bore,d2/D,is 0.4-0.7; and the outerchamber diameter,d1 the height of the circular ridge to the piston top face,h1,the radius of outer/inner chamber circle,R1,R2 ,the max depth of outer/inner chamber bowl,H1,H2,etc. are also important展开更多
HOMER(Hybrid OptimizationModel for Electric Renewables)is an effective simulation and optimization platform for hybrid renewable energy.By inputting specific users’energy resource data(such as wind speed,solar radiat...HOMER(Hybrid OptimizationModel for Electric Renewables)is an effective simulation and optimization platform for hybrid renewable energy.By inputting specific users’energy resource data(such as wind speed,solar radiation,etc.)and load data,and by determining the types and models of components selected by the user,HOMER calculates and simulates the operational status of each component at every time step.Ultimately,it computes the energy balance of the system within specified constraints to simulate the overall system operation.This approach enables the reasonable determination of system component capacities,the evaluation of system feasibility,and the calculation of costs over the entire lifecycle of the system.In response to the challenges of matching capacities and high construction costs in wind-solar-storage multi-energy complementary power generation systems,This paper addresses issues such as difficulty in matching component capacities,high construction costs,and low system reliability in multi-energy complementary power generation systems.Using the HOMER hybrid renewable energy simulation and optimization platform,we constructed various hybrid energy systems for a specific region and considered multiple power supply modes.Thesoftware was used to solve for the optimal capacities and costs of each system.Four scenarios were analyzed:grid-only,grid-connected(purchase-sale)wind-solar-storage system,grid-connected(sale)wind-solar-storage system,and off-grid wind-solar-storage system.The results were compared and analyzed.HOMER can assess systemfeasibility and calculate the cost over its entire lifecycle.By inputting 8760 h of wind and solar resource data and load data for a specific region,and considering multiple system structures and power supply modes,the configuration results were evaluated using indicators such as cost and renewable energy utilization ratio.The simulation results indicate that the Net Present Cost(NPC)values across four different scenarios range from 1,877,292 CNY to 3,222,724 CNY,demonstrating significant cost differences.Among these scenarios,the grid-connected(purchase-sell)wind-solarstorage system exhibited the lowest NPC and the highest renewable energy utilization rate.Compared to a system relying solely on the grid,the NPC was reduced by 305,695 CNY,and the renewable energy utilization rate reached 74.7%.展开更多
The radar radiation source signals hold extremely high reconnaissance value.Accurately positioning these signals constitutes one of the key technologies in safeguarding the security of the electromagnetic space.The po...The radar radiation source signals hold extremely high reconnaissance value.Accurately positioning these signals constitutes one of the key technologies in safeguarding the security of the electromagnetic space.The positioning error in multi-station scenarios is influenced not only by the accuracy of positioning parameter estimation but also by the geometric configuration of the positioning platform.This paper focuses on the direction of arrival(DOA),frequency difference of arrival(FDOA),and time difference of arrival(TDOA)methods,analyzing the optimal configuration,optimal detection area,and optimal position dilution of precision in both elevation-known and elevation-unknown scenarios.Specifically,the paper constructs a signal receiving model,establishes the corresponding positioning equations,and performs dimensional normalization on these equations to derive measurement values in meters.Through differential processing,the position dilution of precision is obtained,which is then used as the optimization function to determine the optimal configuration,optimal detection area,and optimal position dilution of precision.Simulation results validate the accuracy of the proposed formulas.展开更多
To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model...To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.展开更多
This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimens...This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimensions. The relative geometry of the UAVs-target will significantly affect the state estimation performance of the target, the cost function based on the Fisher information matrix(FIM) is used to derive the FIM determinant of UAVs' observation in three-dimensional space, and the optimal observation geometric configuration that maximizes the determinant of the FIM is obtained. It is shown that the optimal observation configuration of the UAVs-target is usually not unique, and the optimal observation configuration is proved for two UAVs and three UAVs in three-dimension. The long-range over-the-horizon target tracking is simulated and analyzed based on the analysis of optimal observation configuration for two UAVs. The simulation results show that the theoretical analysis and control algorithm can effectively improve the positioning accuracy of the target. It can provide a helpful reference for the design of over-the-horizon target localization based on UAVs.展开更多
Industrial robots are increasingly being used in machining tasks because of their high flexibility and intelligence.However,the low structural stiffness of a robot significantly affects its positional accuracy and the...Industrial robots are increasingly being used in machining tasks because of their high flexibility and intelligence.However,the low structural stiffness of a robot significantly affects its positional accuracy and the machining quality of its operation equipment.Studying robot stiffness characteristics and optimization methods is an effective method of improving the stiffness performance of a robot.Accordingly,aiming at the poor accuracy of stiffness modeling caused by approximating the stiffness of each joint as a constant,a variable stiffness identification method is proposed based on space gridding.Subsequently,a task-oriented axial stiffness evaluation index is proposed to quantitatively assess the stiffness performance in the machining direction.In addition,by analyzing the redundant kinematic characteristics of the robot machining system,a configuration optimization method is further developed to maximize the index.For numerous points or trajectory-processing tasks,a configuration smoothing strategy is proposed to rapidly acquire optimized configurations.Finally,experiments on a KR500 robot were conducted to verify the feasibility and validity of the proposed stiffness identification and configuration optimization methods.展开更多
To reduce the comprehensive costs of the construction and operation of microgrids and to minimize the power fluctuations caused by randomness and intermittency in distributed generation,a double-layer optimizing confi...To reduce the comprehensive costs of the construction and operation of microgrids and to minimize the power fluctuations caused by randomness and intermittency in distributed generation,a double-layer optimizing configuration method of hybrid energy storage microgrid based on improved grey wolf optimization(IGWO)is proposed.Firstly,building a microgrid system containing a wind-solar power station and electric-hydrogen coupling hybrid energy storage system.Secondly,the minimum comprehensive cost of the construction and operation of the microgrid is taken as the outer objective function,and the minimum peak-to-valley of the microgrid’s daily output is taken as the inner objective function.By iterating through the outer and inner layers,the system improves operational stability while achieving economic configuration.Then,using the energy-self-smoothness of the microgrid as the evaluation index,a double-layer optimizing configuration method of the microgrid is constructed.Finally,to improve the disadvantages of grey wolf optimization(GWO),such as slow convergence in the later period and easy falling into local optima,by introducing the convergence factor nonlinear adjustment strategy and Cauchy mutation operator,an IGWO with excellent global performance is proposed.After testing with the typical test functions,the superiority of IGWO is verified.Next,using IGWO to solve the double-layer model.The case analysis shows that compared to GWO and particle swarm optimization(PSO),the IGWO reduced the comprehensive cost by 15.6%and 18.8%,respectively.Therefore,the proposed double-layer optimizationmethod of capacity configuration ofmicrogrid with wind-solar-hybrid energy storage based on IGWO could effectively improve the independence and stability of the microgrid and significantly reduce the comprehensive cost.展开更多
ARINC653 systems,which have been widely used in avionics industry,are an important class of safety-critical applications.Partitions are the core concept in the Arinc653 system architecture.Due to the existence of part...ARINC653 systems,which have been widely used in avionics industry,are an important class of safety-critical applications.Partitions are the core concept in the Arinc653 system architecture.Due to the existence of partitions,the system designer must allocate adequate time slots statically to each partition in the design phase.Although some time slot allocation policies could be borrowed from task scheduling policies,no existing literatures give an optimal allocation policy.In this paper,we present a partition configuration policy and prove that this policy is optimal in the sense that if this policy fails to configure adequate time slots to each partition,nor do other policies.Then,by simulation,we show the effects of different partition configuration policies on time slot allocation of partitions and task response time,respectively.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wi...As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.展开更多
To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of re...To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.展开更多
Spares inventory configuration optimization is an effective way to improve readiness and reduce life cycle cost of equipment.Through analyzing two-echelon spares support system,the METRIC model basic theory was used.A...Spares inventory configuration optimization is an effective way to improve readiness and reduce life cycle cost of equipment.Through analyzing two-echelon spares support system,the METRIC model basic theory was used.An inventory configuration optimization model of two-echelon spares support system was proposed which took the spares expected shortfall as the object and made the minimum repairable parts expected shortfall instead of the maximum spares supportability as the objective function.Marginal efficiency analysis algorithm was applied to optimizing the spares configuration and generating a rational spares inventory configuration.Finally,several examples are given to verify the model.展开更多
Line configuration and balancing is to select the type of line and allot a given set of operations as well as machines to a sequence of workstations to realize high-efficiency production. Most of the current researche...Line configuration and balancing is to select the type of line and allot a given set of operations as well as machines to a sequence of workstations to realize high-efficiency production. Most of the current researches for machining line configuration and balancing problems are related to dedicated transfer lines with dedicated machine workstations. With growing trends towards great product variety and fluctuations in market demand, dedicated transfer lines are being replaced with flexible machining line composed of identical CNC machines. This paper deals with the line configuration and balancing problem for flexible machining lines. The objective is to assign operations to workstations and find the sequence of execution, specify the number of machines in each workstation while minimizing the line cycle time and total number of machines. This problem is subject to precedence, clustering, accessibility and capacity constraints among the features, operations, setups and workstations. The mathematical model and heuristic algorithm based on feature group strategy and polychromatic sets theory are presented to find an optimal solution. The feature group strategy and polychromatic sets theory are used to establish constraint model. A heuristic operations sequencing and assignment algorithm is given. An industrial case study is carried out, and multiple optimal solutions in different line configurations are obtained. The case studying results show that the solutions with shorter cycle time and higher line balancing rate demonstrate the feasibility and effectiveness of the proposed algorithm. This research proposes a heuristic line configuration and balancing algorithm based on feature group strategy and polychromatic sets theory which is able to provide better solutions while achieving an improvement in computing time.展开更多
Motivated by optimal combination of paired wings configuration and troke-plane inclination in biological flapping flights that can achieve high aerodynamic performance,we propose a biomimetic rotor-configuration desig...Motivated by optimal combination of paired wings configuration and troke-plane inclination in biological flapping flights that can achieve high aerodynamic performance,we propose a biomimetic rotor-configuration design to explore optimal aerodynamic performance in multirotor drones.While aerodynamic interactions among propellers in multirotor Unmanned Aerial Vehicles(UAVs)play a crucial role in lift force production and Figure of Merit(FM)efficiency,the rotor-configuration effect remains poorly understood.Here we address a Computational Fluid Dynamics(CFD)-based study on optimal aerodynamic performance of the rotor-configuration in hovering quadrotor drones with a specific focus on the aerodynamic effects of tip distance,height difference and tilt angle of propellers.Our results indicate that the tip distance-induced interactions can most alter lift force production and hence lead to remarked improvement in FM,and the height difference also plays a key role in improving aerodynamic performance,while the tilt angle effect is less important.Furthermore,we carried out an extensive analysis to explore the optimal aerodynamic performance of the rotor-configuration over a broad parameter space,by combining the CFD-based simulations and a novel surrogate model.We find that a rotor-configuration with a large tip distance and some height difference with zero tilt angle is capable of optimizing both lift force production and FM,which could offer a novel optimal design as well as maneuver strategy for multirotor UAVs.展开更多
Dielectric barrier discharge (DBD) has been widely employed in ozone generation.However,the technology still exhibits relatively low energy yield (E_(Y)) referring to its theoretical value.In this work,E_(Y)of ozone g...Dielectric barrier discharge (DBD) has been widely employed in ozone generation.However,the technology still exhibits relatively low energy yield (E_(Y)) referring to its theoretical value.In this work,E_(Y)of ozone generation was improved by optimizing the mesh number,electrode length,and dielectric material in a coaxial DBD reactor with two wire mesh electrodes.Meanwhile,the discharge characteristics were investigated to elucidate the effect of reactor configuration on E_(Y).Results showed that the discharge characteristics were improved by increasing the mesh number,electrode length,and relative permittivity.When the mesh number was increased from 40 to 100,an improvement of approximately 48%in E_(Y) was obtained.Additionally,higher E_(Y) values were obtained using corundum as the dielectric material relative to polytetrafluoroethylene and quartz.Ultimately,E_(Y) in the optimal DBD reactor could reach 326.77 g·(k W·h)^(-1).Compared with the reported DBD reactor,the coaxial DBD reactor with the mesh electrode and the dielectric material of corundum could effectively improve E_(Y),which lays a foundation for the design of high-efficiency coaxial DBD reactor.展开更多
This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem...This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem in the PTST unit provides both thermal energy and electrical energy.Based on the life cycle method,the configuration optimization under eight operation strategies is studied with the economy,energy,and environment indicators.The eight operation strategies include FEL,FEL-EC,FEL-TES,FEL-TES&EC,FTL,FTL-EC,FTL-TES,and FTL-TES&EC.The feasibility of each strategy is verified by taking a residential building cluster as an example.The indicators under the optimal configuration of each strategy are compared with that of the separate production(SP)system.The results showed that the PTST-CCHP system improves the environment and energy performance by changing the ratio of thermal energy and electric energy.The environment and energy indicators of FEL-TES&EC are superior to those of FTL-TES&EC in summer,and the results are just the opposite in winter.The initial annual investment of the PTST-CCHP system is higher than that of the SP system,but its economic performance is better than that of the SP system with the increase of life-cycle.展开更多
<span style="font-family:""><span style="font-family:Verdana;">Water resource is an important supporting material for life support system and eco</span><span style="f...<span style="font-family:""><span style="font-family:Verdana;">Water resource is an important supporting material for life support system and eco</span><span style="font-family:Verdana;">nomic development, and the sustainable development and utilization of water resource </span></span><span style="font-family:Verdana;">are</span><span style="font-family:Verdana;"> the guarantee of social sustainable development. The upper Minjiang River is the most important source of water supply for the Chengdu Plain. With the water resources of the upper Minjiang River facing the problems of overall water volume reduction, flood and water pollution, etc.</span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> based on the optimal allocation theory, this paper constructs an optimal allocation model of water resourc</span><span style="font-family:Verdana;">es in the upper reaches of the Minjiang River, analyzes its characteristics and proposes some relevant countermeasures and suggestions to solve the existing problems, aiming to provide reference</span><span style="font-family:Verdana;">s</span><span style="font-family:Verdana;"> for the sustainable utilization of water resources in the upper reaches of the Minjiang River.展开更多
In urban water ecological restoration projects,the selection and configuration of wetland plants are crucial for water quality improvement,ecological diversity enhancement,and landscape beautification.Different plants...In urban water ecological restoration projects,the selection and configuration of wetland plants are crucial for water quality improvement,ecological diversity enhancement,and landscape beautification.Different plants have different characteristics,and a scientific and rational selection and optimization of plant species is needed.This paper proposes an optimized plant selection and configuration scheme for urban water ecological restoration based on the ecological characteristics and pollutant removal performance of wetland plants.It analyzes the diversity,removal mechanisms,and configuration modes of wetland plants,taking into account ecology,aesthetics,and cost-effectiveness,to provide scientific evidence for wetland plant configuration and support water environment management decision-making.展开更多
文摘Aim To obtain an optimizing range of the main configuration parameters of double swirls combustion system (DSCS) Methods To analyze the influence of DS combustion cham-ber configuration parameters on fuel spray and mixing by means of the fuel jet developmentperiphery charts obtained by the high speed photography with a modeling test device deve-loped by authors,and to examine it by the tests on a single cylinder diesel engine.Resultsand Conclusion The mixing process can be divided into four phases.The optimizing range of the ration of the inner chamber diameter to the cylinder bore,d2/D,is 0.4-0.7; and the outerchamber diameter,d1 the height of the circular ridge to the piston top face,h1,the radius of outer/inner chamber circle,R1,R2 ,the max depth of outer/inner chamber bowl,H1,H2,etc. are also important
基金supported in part by the Inner Mongolia Autonomous Region Science and Technology Project Fund(2021GG0336)Inner Mongolia Natural Science Fund(2023ZD20).
文摘HOMER(Hybrid OptimizationModel for Electric Renewables)is an effective simulation and optimization platform for hybrid renewable energy.By inputting specific users’energy resource data(such as wind speed,solar radiation,etc.)and load data,and by determining the types and models of components selected by the user,HOMER calculates and simulates the operational status of each component at every time step.Ultimately,it computes the energy balance of the system within specified constraints to simulate the overall system operation.This approach enables the reasonable determination of system component capacities,the evaluation of system feasibility,and the calculation of costs over the entire lifecycle of the system.In response to the challenges of matching capacities and high construction costs in wind-solar-storage multi-energy complementary power generation systems,This paper addresses issues such as difficulty in matching component capacities,high construction costs,and low system reliability in multi-energy complementary power generation systems.Using the HOMER hybrid renewable energy simulation and optimization platform,we constructed various hybrid energy systems for a specific region and considered multiple power supply modes.Thesoftware was used to solve for the optimal capacities and costs of each system.Four scenarios were analyzed:grid-only,grid-connected(purchase-sale)wind-solar-storage system,grid-connected(sale)wind-solar-storage system,and off-grid wind-solar-storage system.The results were compared and analyzed.HOMER can assess systemfeasibility and calculate the cost over its entire lifecycle.By inputting 8760 h of wind and solar resource data and load data for a specific region,and considering multiple system structures and power supply modes,the configuration results were evaluated using indicators such as cost and renewable energy utilization ratio.The simulation results indicate that the Net Present Cost(NPC)values across four different scenarios range from 1,877,292 CNY to 3,222,724 CNY,demonstrating significant cost differences.Among these scenarios,the grid-connected(purchase-sell)wind-solarstorage system exhibited the lowest NPC and the highest renewable energy utilization rate.Compared to a system relying solely on the grid,the NPC was reduced by 305,695 CNY,and the renewable energy utilization rate reached 74.7%.
基金supported by the National Natural Science Foundation of China(Nos.62027801,62301035).
文摘The radar radiation source signals hold extremely high reconnaissance value.Accurately positioning these signals constitutes one of the key technologies in safeguarding the security of the electromagnetic space.The positioning error in multi-station scenarios is influenced not only by the accuracy of positioning parameter estimation but also by the geometric configuration of the positioning platform.This paper focuses on the direction of arrival(DOA),frequency difference of arrival(FDOA),and time difference of arrival(TDOA)methods,analyzing the optimal configuration,optimal detection area,and optimal position dilution of precision in both elevation-known and elevation-unknown scenarios.Specifically,the paper constructs a signal receiving model,establishes the corresponding positioning equations,and performs dimensional normalization on these equations to derive measurement values in meters.Through differential processing,the position dilution of precision is obtained,which is then used as the optimization function to determine the optimal configuration,optimal detection area,and optimal position dilution of precision.Simulation results validate the accuracy of the proposed formulas.
基金The National Natural Science Foundation of China(No.51377021)the Science and Technology Project of State Grid Corporation of China(No.SGTJDK00DWJS1600014)
文摘To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.
基金supported by the National Natural Science Foundation of China(61703419)。
文摘This article investigates the optimal observation configuration of unmanned aerial vehicles(UAVs) based on angle and range measurements, and generalizes predecessors' researches in two dimensions into three dimensions. The relative geometry of the UAVs-target will significantly affect the state estimation performance of the target, the cost function based on the Fisher information matrix(FIM) is used to derive the FIM determinant of UAVs' observation in three-dimensional space, and the optimal observation geometric configuration that maximizes the determinant of the FIM is obtained. It is shown that the optimal observation configuration of the UAVs-target is usually not unique, and the optimal observation configuration is proved for two UAVs and three UAVs in three-dimension. The long-range over-the-horizon target tracking is simulated and analyzed based on the analysis of optimal observation configuration for two UAVs. The simulation results show that the theoretical analysis and control algorithm can effectively improve the positioning accuracy of the target. It can provide a helpful reference for the design of over-the-horizon target localization based on UAVs.
基金National Natural Science Foundation of China(Grant No.51875287)National Defense Basic Scientific Research Program of China(Grant No.JCKY2018605C002)Jiangsu Provincial Natural Science Foundation of China(Grant No.BK20190417).
文摘Industrial robots are increasingly being used in machining tasks because of their high flexibility and intelligence.However,the low structural stiffness of a robot significantly affects its positional accuracy and the machining quality of its operation equipment.Studying robot stiffness characteristics and optimization methods is an effective method of improving the stiffness performance of a robot.Accordingly,aiming at the poor accuracy of stiffness modeling caused by approximating the stiffness of each joint as a constant,a variable stiffness identification method is proposed based on space gridding.Subsequently,a task-oriented axial stiffness evaluation index is proposed to quantitatively assess the stiffness performance in the machining direction.In addition,by analyzing the redundant kinematic characteristics of the robot machining system,a configuration optimization method is further developed to maximize the index.For numerous points or trajectory-processing tasks,a configuration smoothing strategy is proposed to rapidly acquire optimized configurations.Finally,experiments on a KR500 robot were conducted to verify the feasibility and validity of the proposed stiffness identification and configuration optimization methods.
基金supported by the NationalNatural Science Foundation of China Under Grant 61961017Key R&D Plan Projects in Hubei Province 2022BAA060.
文摘To reduce the comprehensive costs of the construction and operation of microgrids and to minimize the power fluctuations caused by randomness and intermittency in distributed generation,a double-layer optimizing configuration method of hybrid energy storage microgrid based on improved grey wolf optimization(IGWO)is proposed.Firstly,building a microgrid system containing a wind-solar power station and electric-hydrogen coupling hybrid energy storage system.Secondly,the minimum comprehensive cost of the construction and operation of the microgrid is taken as the outer objective function,and the minimum peak-to-valley of the microgrid’s daily output is taken as the inner objective function.By iterating through the outer and inner layers,the system improves operational stability while achieving economic configuration.Then,using the energy-self-smoothness of the microgrid as the evaluation index,a double-layer optimizing configuration method of the microgrid is constructed.Finally,to improve the disadvantages of grey wolf optimization(GWO),such as slow convergence in the later period and easy falling into local optima,by introducing the convergence factor nonlinear adjustment strategy and Cauchy mutation operator,an IGWO with excellent global performance is proposed.After testing with the typical test functions,the superiority of IGWO is verified.Next,using IGWO to solve the double-layer model.The case analysis shows that compared to GWO and particle swarm optimization(PSO),the IGWO reduced the comprehensive cost by 15.6%and 18.8%,respectively.Therefore,the proposed double-layer optimizationmethod of capacity configuration ofmicrogrid with wind-solar-hybrid energy storage based on IGWO could effectively improve the independence and stability of the microgrid and significantly reduce the comprehensive cost.
基金supported by the National Natural Science Foundation of China under Grant No.90718019the National High-Tech Research and Development Plan of China under Grant No.2007AA010304
文摘ARINC653 systems,which have been widely used in avionics industry,are an important class of safety-critical applications.Partitions are the core concept in the Arinc653 system architecture.Due to the existence of partitions,the system designer must allocate adequate time slots statically to each partition in the design phase.Although some time slot allocation policies could be borrowed from task scheduling policies,no existing literatures give an optimal allocation policy.In this paper,we present a partition configuration policy and prove that this policy is optimal in the sense that if this policy fails to configure adequate time slots to each partition,nor do other policies.Then,by simulation,we show the effects of different partition configuration policies on time slot allocation of partitions and task response time,respectively.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
基金supported by the Science and Technology Project of State Grid Corporation Headquarters(No.5100-202323008A-1-1-ZN).
文摘As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.
基金supported by Manage Innovation Project of China Southern Power Grid Co.,Ltd.(No.GZHKJXM20210232).
文摘To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.
文摘Spares inventory configuration optimization is an effective way to improve readiness and reduce life cycle cost of equipment.Through analyzing two-echelon spares support system,the METRIC model basic theory was used.An inventory configuration optimization model of two-echelon spares support system was proposed which took the spares expected shortfall as the object and made the minimum repairable parts expected shortfall instead of the maximum spares supportability as the objective function.Marginal efficiency analysis algorithm was applied to optimizing the spares configuration and generating a rational spares inventory configuration.Finally,several examples are given to verify the model.
基金Supported by Shanghai Municipal Science and Technology Commission(Grant No.12JC1408700)National Science and Technology Major Project of the Ministry of Science and Technology of China(Grant Nos.2013ZX04012-071,2011ZX04015-022)
文摘Line configuration and balancing is to select the type of line and allot a given set of operations as well as machines to a sequence of workstations to realize high-efficiency production. Most of the current researches for machining line configuration and balancing problems are related to dedicated transfer lines with dedicated machine workstations. With growing trends towards great product variety and fluctuations in market demand, dedicated transfer lines are being replaced with flexible machining line composed of identical CNC machines. This paper deals with the line configuration and balancing problem for flexible machining lines. The objective is to assign operations to workstations and find the sequence of execution, specify the number of machines in each workstation while minimizing the line cycle time and total number of machines. This problem is subject to precedence, clustering, accessibility and capacity constraints among the features, operations, setups and workstations. The mathematical model and heuristic algorithm based on feature group strategy and polychromatic sets theory are presented to find an optimal solution. The feature group strategy and polychromatic sets theory are used to establish constraint model. A heuristic operations sequencing and assignment algorithm is given. An industrial case study is carried out, and multiple optimal solutions in different line configurations are obtained. The case studying results show that the solutions with shorter cycle time and higher line balancing rate demonstrate the feasibility and effectiveness of the proposed algorithm. This research proposes a heuristic line configuration and balancing algorithm based on feature group strategy and polychromatic sets theory which is able to provide better solutions while achieving an improvement in computing time.
基金This work was partly supported by the Grant-in-Aid for Scientific Research of KAKENHI No.19H02060,19H00750,JSPSa Global Prominent Research Program,Chiba University.
文摘Motivated by optimal combination of paired wings configuration and troke-plane inclination in biological flapping flights that can achieve high aerodynamic performance,we propose a biomimetic rotor-configuration design to explore optimal aerodynamic performance in multirotor drones.While aerodynamic interactions among propellers in multirotor Unmanned Aerial Vehicles(UAVs)play a crucial role in lift force production and Figure of Merit(FM)efficiency,the rotor-configuration effect remains poorly understood.Here we address a Computational Fluid Dynamics(CFD)-based study on optimal aerodynamic performance of the rotor-configuration in hovering quadrotor drones with a specific focus on the aerodynamic effects of tip distance,height difference and tilt angle of propellers.Our results indicate that the tip distance-induced interactions can most alter lift force production and hence lead to remarked improvement in FM,and the height difference also plays a key role in improving aerodynamic performance,while the tilt angle effect is less important.Furthermore,we carried out an extensive analysis to explore the optimal aerodynamic performance of the rotor-configuration over a broad parameter space,by combining the CFD-based simulations and a novel surrogate model.We find that a rotor-configuration with a large tip distance and some height difference with zero tilt angle is capable of optimizing both lift force production and FM,which could offer a novel optimal design as well as maneuver strategy for multirotor UAVs.
基金supported by the National Natural Science Foundation of China (21725601 and 2187081058)。
文摘Dielectric barrier discharge (DBD) has been widely employed in ozone generation.However,the technology still exhibits relatively low energy yield (E_(Y)) referring to its theoretical value.In this work,E_(Y)of ozone generation was improved by optimizing the mesh number,electrode length,and dielectric material in a coaxial DBD reactor with two wire mesh electrodes.Meanwhile,the discharge characteristics were investigated to elucidate the effect of reactor configuration on E_(Y).Results showed that the discharge characteristics were improved by increasing the mesh number,electrode length,and relative permittivity.When the mesh number was increased from 40 to 100,an improvement of approximately 48%in E_(Y) was obtained.Additionally,higher E_(Y) values were obtained using corundum as the dielectric material relative to polytetrafluoroethylene and quartz.Ultimately,E_(Y) in the optimal DBD reactor could reach 326.77 g·(k W·h)^(-1).Compared with the reported DBD reactor,the coaxial DBD reactor with the mesh electrode and the dielectric material of corundum could effectively improve E_(Y),which lays a foundation for the design of high-efficiency coaxial DBD reactor.
基金supported by the National Natural Science Foundation of China(Grant No.51667013)the Research on Scheduling Control Technology of Photothermal Power Generation of The Power System with High Proportion New Energy on The Supply End(Grant No.SGGSKY00FJJS1900273).
文摘This paper proposed a new type of combined cooling heating and power(CCHP)system,including the parabolic trough solar thermal(PTST)power generation and gas turbine power generation.The thermal energy storage subsystem in the PTST unit provides both thermal energy and electrical energy.Based on the life cycle method,the configuration optimization under eight operation strategies is studied with the economy,energy,and environment indicators.The eight operation strategies include FEL,FEL-EC,FEL-TES,FEL-TES&EC,FTL,FTL-EC,FTL-TES,and FTL-TES&EC.The feasibility of each strategy is verified by taking a residential building cluster as an example.The indicators under the optimal configuration of each strategy are compared with that of the separate production(SP)system.The results showed that the PTST-CCHP system improves the environment and energy performance by changing the ratio of thermal energy and electric energy.The environment and energy indicators of FEL-TES&EC are superior to those of FTL-TES&EC in summer,and the results are just the opposite in winter.The initial annual investment of the PTST-CCHP system is higher than that of the SP system,but its economic performance is better than that of the SP system with the increase of life-cycle.
文摘<span style="font-family:""><span style="font-family:Verdana;">Water resource is an important supporting material for life support system and eco</span><span style="font-family:Verdana;">nomic development, and the sustainable development and utilization of water resource </span></span><span style="font-family:Verdana;">are</span><span style="font-family:Verdana;"> the guarantee of social sustainable development. The upper Minjiang River is the most important source of water supply for the Chengdu Plain. With the water resources of the upper Minjiang River facing the problems of overall water volume reduction, flood and water pollution, etc.</span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> based on the optimal allocation theory, this paper constructs an optimal allocation model of water resourc</span><span style="font-family:Verdana;">es in the upper reaches of the Minjiang River, analyzes its characteristics and proposes some relevant countermeasures and suggestions to solve the existing problems, aiming to provide reference</span><span style="font-family:Verdana;">s</span><span style="font-family:Verdana;"> for the sustainable utilization of water resources in the upper reaches of the Minjiang River.
基金2023 Beilin District Science and Technology Plan Project(Project No.GX2339)the 2024 Xi’an Science and Technology Plan Project(Project No.24GXFW0065).
文摘In urban water ecological restoration projects,the selection and configuration of wetland plants are crucial for water quality improvement,ecological diversity enhancement,and landscape beautification.Different plants have different characteristics,and a scientific and rational selection and optimization of plant species is needed.This paper proposes an optimized plant selection and configuration scheme for urban water ecological restoration based on the ecological characteristics and pollutant removal performance of wetland plants.It analyzes the diversity,removal mechanisms,and configuration modes of wetland plants,taking into account ecology,aesthetics,and cost-effectiveness,to provide scientific evidence for wetland plant configuration and support water environment management decision-making.