期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Baosteel's No.8 air separation unit and the practice of its system commissioning
1
作者 ZHOU Chenhao CAI Lemin LI Zhengqiang 《Baosteel Technical Research》 CAS 2009年第3期23-26,共4页
This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes t... This paper introduces the process flow, technical parameters and relevant features of Baosteel's No. 8 air separation unit (ASU) with a capacity of 60000m^3/h. It summarizes the commissioning work, which includes the adjustment of the air compressor,the system's naked cooling,the precooling system and the operation adjustment. It also provides detailed analyses on some failures which occurred in the commissioning. Through the modification of the design and the interlocks, the tripping probability of the air compressor was greatly reduced. Through the heating of the system and the control of the water cooler's nitrogen flow,the overproof content of carbon dioxide and fluctuation of oxygen flow were avoided. Nitrogen-block in the argon system was eliminated by the precise control of the argon rectification flow and argon content. All these solutions have been proved to be effective by practice. 展开更多
关键词 air separation unit commissioning malfunction solution
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部