Load prediction and power prediction uncertainties are inevitable aspects of a virtual power plant(VPP).In power system economic dispatch(ED)modeling,the interval is used to describe prediction uncertainties.An ED mod...Load prediction and power prediction uncertainties are inevitable aspects of a virtual power plant(VPP).In power system economic dispatch(ED)modeling,the interval is used to describe prediction uncertainties.An ED model with interval uncertainty is established in this paper.The probability degree definition is adopted to convert the interval-based economic dispatch model into a deterministic model for the purposes of solving the modeling problem.Simulation tests are performed on a 10-machine system using professional optimization software(LINGO).The simulation results verify the validity of the proposed interval-based scheme for the economic dispatch of a power system with VPP.展开更多
基金supported by the State Grid Corporation of China Project:Study on Key Technologies for Power and Frequency Control of System with Source-Grid-Load Interactions,and sponsored by NUPTSF(under Grant XJKY14018).
文摘Load prediction and power prediction uncertainties are inevitable aspects of a virtual power plant(VPP).In power system economic dispatch(ED)modeling,the interval is used to describe prediction uncertainties.An ED model with interval uncertainty is established in this paper.The probability degree definition is adopted to convert the interval-based economic dispatch model into a deterministic model for the purposes of solving the modeling problem.Simulation tests are performed on a 10-machine system using professional optimization software(LINGO).The simulation results verify the validity of the proposed interval-based scheme for the economic dispatch of a power system with VPP.