期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
柳伊河水电站大坝右岸坝区研究(英文) 被引量:1
1
作者 S.A. Velikin A.M. Snegirev 《冰川冻土》 CSCD 北大核心 2004年第S1期142-150,共9页
In the paper in order to ascertain the condition of the right-bank of the dam at the Vilyui hydroelectric power plant measurements are applied to obtain experimentaldate such as drilling borehole, hydrolocationand so ... In the paper in order to ascertain the condition of the right-bank of the dam at the Vilyui hydroelectric power plant measurements are applied to obtain experimentaldate such as drilling borehole, hydrolocationand so forth. By finding out the distribution of the temperature field some corresponding measures are taken to improve the stability of the dam during the change of the ground temperature. And finally some conclusions are draw to the study. 展开更多
关键词 right-bank CONTIGUITY FILTERING FLOW temperature field hydrolocation
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部