期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
HEURISTIC MODELING FOR A DYNAMIC AND GOAL PROGRAMMING IN PRODUCTION PLANNING OF CONTINUOUS MANUFACTURING SYSTEMS 被引量:2
1
作者 JAHAN A ABDOLSHAH M 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第5期110-113,共4页
At the first sight it seems that advanced operation research is not used enough in continuous production systems as comparison with mass production, batch production and job shop systems, but really in a comprehensive... At the first sight it seems that advanced operation research is not used enough in continuous production systems as comparison with mass production, batch production and job shop systems, but really in a comprehensive evaluation the advanced operation research techniques can be used in continuous production systems in developing countries very widely, because of initial inadequate plant layout, stage by stage development of production lines, the purchase of second hand machineries from various countries, plurality of customers. A case of production system planning is proposed for a chemical company in which the above mentioned conditions are almost presented. The goals and constraints in this issue are as follows: (1) Minimizing deviation of customer's requirements. (2) Maximizing the profit. (3) Minimizing the frequencies of changes in formula production. (4) Minimizing the inventory of final products. (5) Balancing the production sections with regard to rate in production. (6) Limitation in inventory of raw material. The present situation is in such a way that various techniques such as goal programming, linear programming and dynamic programming can be used. But dynamic production programming issues are divided into two categories, at first one with limitation in production capacity and another with unlimited production capacity. For the first category, a systematic and acceptable solution has not been presented yet. Therefore an innovative method is used to convert the dynamic situation to a zero- one model. At last this issue is changed to a goal programming model with non-linear limitations with the use of GRG algorithm and that's how it is solved. 展开更多
关键词 Heuristic model Dynamic programming goal programming production planning
在线阅读 下载PDF
COAL QUALITY CONTROL
2
作者 孟祥瑞 《Journal of Coal Science & Engineering(China)》 1998年第1期81-87,共7页
Coal storing and loading have much more influence on coal quality. In the paper, a goal programming model has been constructed to determine the ideal quantity extracting from stockpile and silos and a quality control ... Coal storing and loading have much more influence on coal quality. In the paper, a goal programming model has been constructed to determine the ideal quantity extracting from stockpile and silos and a quality control model is inferred under the guidance of maximum theory of dispersed number and practice methods are given to meet production demand, with which a coal mine has achieved a better tech-economic result. 展开更多
关键词 coal quality goal programming model maximum theory of dispersed number control model
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部