An attempt has been made to develop a distributed software infrastructure model for onboard data fusion system simulation, which is also applied to netted radar systems, onboard distributed detection systems and advan...An attempt has been made to develop a distributed software infrastructure model for onboard data fusion system simulation, which is also applied to netted radar systems, onboard distributed detection systems and advanced C3I systems. Two architectures are provided and verified: one is based on pure TCP/IP protocol and C/S model, and implemented with Winsock, the other is based on CORBA (common object request broker architecture). The performance of data fusion simulation system, i.e. reliability, flexibility and scalability, is improved and enhanced by two models. The study of them makes valuable explore on incorporating the distributed computation concepts into radar system simulation techniques.展开更多
Based on MATRIXx, a universal real-time visual distributed simulation system is developed. The system can receive different input data from network or local terminal. Application models in the simulation modules can a...Based on MATRIXx, a universal real-time visual distributed simulation system is developed. The system can receive different input data from network or local terminal. Application models in the simulation modules can automatically get such data to be analyzed and calculated, and then produce real-time simulation control information. Meanwhile, this paper designs relevant simulation components to implement the input and output data, which can guarantee the real-time and universal of the data transmission. Result of the experimental system shows that the real-time performance of the simulation is perfect.展开更多
The objective of this study is to quantitatively evaluate Tropical Rainfall Measuring Mission (TRMM) data with rain gauge data and further to use this TRMM data to drive a Dis- tributed Time-Variant Gain Model (DT...The objective of this study is to quantitatively evaluate Tropical Rainfall Measuring Mission (TRMM) data with rain gauge data and further to use this TRMM data to drive a Dis- tributed Time-Variant Gain Model (DTVGM) to perform hydrological simulations in the semi-humid Weihe River catchment in China. Before the simulations, a comparison with a 10-year (2001-2010) daily rain gauge data set reveals that, at daily time step, TRMM rainfall data are better at capturing rain occurrence and mean values than rainfall extremes. On a monthly time scale, good linear relationships between TRMM and rain gauge rainfall data are found, with determination coefficients R2 varying between 0.78 and 0.89 for the individual stations. Subsequent simulation results of seven years (2001-2007) of data on daily hydro- logical processes confirm that the DTVGM when calibrated by rain gauge data performs better than when calibrated by TRMM data, but the performance of the simulation driven by TRMM data is better than that driven by gauge data on a monthly time scale. The results thus suggest that TRMM rainfall data are more suitable for monthly streamfiow simulation in the study area, and that, when the effects of recalibration and the results for water balance components are also taken into account, the TRMM 3B42-V7 product has the potential to perform well in similar basins.展开更多
Smelting with oxygen bottom blowing is one of the main methods used in the frame of copper pyrometallurgy.With this approach,feed materials and oxygen-enriched air are introduced in reversed order to enhance multiphas...Smelting with oxygen bottom blowing is one of the main methods used in the frame of copper pyrometallurgy.With this approach,feed materials and oxygen-enriched air are introduced in reversed order to enhance multiphaseflow within the furnace.Understanding the flow structure and temperature distribution in this setup is crucial foroptimizing production.In this study,gas-liquid interactions,and temperature profiles under varying air-injectionconditions are examined by means of numerical simulation for a 3.2 m×20 m furnace.The results indicate that thehigh-velocity regions are essentially distributed near the lance within the reaction region and the flue gas outlet,while low-velocity regions are located close to the furnace walls on both side of the reaction region.Dead regionsappear in the sedimentation region,with gas velocities surpassing those of the molten phase.As the injection rateincreases from 0.50 to 0.80 Nm3/s,the stabilization time of the average liquid surface velocity decreases from 2.6 sto 1.9 s,exhibiting a similar trend to the gas holdup.During stabilization,the average liquid surface velocity risesfrom 0.505 to 0.702 m/s.The average turbulent kinetic energy(TKE)of the fluid in the molten bath increases from0.095 to 0.162 m^(2)/s^(2).The proportion of the area distribution with TKE greater than 0.10 m^(2)/s^(2) and the gas holdupat steady state both rise with an increase in the injection quantity.The maximum splashing height of the melt growsfrom approximately 0.756 to 1.154 m,with the affected area expanding from 14.239 to 20.498 m^(2).Under differentworking conditions with varying injection quantities,the average temperature changes in melt zone and flue gaszone of the furnace are small.The temperature in the melt and in the flue-gas zone spans the interval 1200℃–1257℃,and 1073℃–1121℃,respectively.The temperature distribution of the melt and flue gas reveals a patterncharacterized by elevated temperatures in the reaction zone,gradually transitioning to lower temperatures in thesedimentation region.展开更多
Effective isolation between the cement sheath and the sandstone is crucial for the development and production of oil and gas wells in sandstone formations.In this study,a cement-sandstone composite(CSC)was prepared,an...Effective isolation between the cement sheath and the sandstone is crucial for the development and production of oil and gas wells in sandstone formations.In this study,a cement-sandstone composite(CSC)was prepared,and based onμ-CT three-dimensional reconstruction imaging and finite element analysis(FEA)techniques,the stress distribution and potential failure mechanism at the cement-sandstone bonding interface under axial loading were analyzed.The key findings are as follows:(1)stress concentrations are highly likely to form at the gap between the cement and sandstone interface and around interfacial voids,with Von Mises stress reaching critical levels of 18.0-20.0 MPa at these locations,significantly exceeding the stress magnitudes in well-bonded regions;(2)the phenomenon of local stress concentration driven by interfacial defects can be identified as the main basis for predicting damage location in interfacial debonding and continuous shear under axial load;(3)ensuring tight cementation at the cement-sandstone interface and minimizing interfacial voids are paramount for preventing stress-induced failure;(4)the critical Von Mises stress value of 20 MPa at the interface defect can be used as a benchmark for material selection and designed to ensure long-term integrity in oil and gas well applications subjected to similar axial loads.These findings contribute to a more accurate understanding of the failure mechanism of the cement-sandstone interface and to the precise design of material properties,thereby ensuring the long-term integrity of oil and gas well applications subjected to similar axial loads.展开更多
A model suitable for describing the mechanical response of thin elastic objects is proposed to simulate the deformation of guide wires in minimally invasive interventions. The main objective of this simulation is to p...A model suitable for describing the mechanical response of thin elastic objects is proposed to simulate the deformation of guide wires in minimally invasive interventions. The main objective of this simulation is to provide doctors an opportunity to rehearse the surgery and select an optimal operation plan before the real surgery. In this model the guide wire is discretized with the multi-body representation and its elastic energy derivate from elastic theory is a polynomial function of the nodal displacements. The vascular structure is represented by a tetrahedron mesh extended from the triangular mesh of the artery, which can be extracted from the patient's CT image data. The model applies the energy decline process of the conjugate gradient method to the deformation simulation of the guide wire. Experimental results show that the polynomial relationship between elastic energy and nodal displacements tremendously simplifies the evaluation of the conjugate gradient method and significantly improves the model's efficiency. Compared with models depending on an explicit scheme for evaluation, the new model is not only non-conditionally stable but also more efficient. The model can be applied to the real-time simulation of guide wire in a vascular structure.展开更多
Modeling technology has been introduced into software testing field.However,how to carry through the testing modeling effectively is still a difficulty.Based on combination of simulation modeling technology and embedd...Modeling technology has been introduced into software testing field.However,how to carry through the testing modeling effectively is still a difficulty.Based on combination of simulation modeling technology and embedded real-time software testing method,the process of simulation testing modeling is studied first.And then,the supporting environment of simulation testing modeling is put forward.Furthermore,an approach of embedded real-time software simulation testing modeling including modeling of cross-linked equipments of system under testing(SUT),test case,testing scheduling,and testing system service is brought forward.Finally,the formalized description and execution system of testing models are given,with which we can realize real-time,closed loop,mad automated system testing for embedded real-time software.展开更多
Real-time hybrid simulation is an efficient and cost-effective dynamic testing technique for performance evaluation of structural systems subjected to earthquake loading with rate-dependent behavior. A loading assembl...Real-time hybrid simulation is an efficient and cost-effective dynamic testing technique for performance evaluation of structural systems subjected to earthquake loading with rate-dependent behavior. A loading assembly with multiple actuators is required to impose realistic boundary conditions on physical specimens. However, such a testing system is expected to exhibit significant dynamic coupling of the actuators and suffer from time lags that are associated with the dynamics of the servo-hydraulic system, as well as control-structure interaction (CSI). One approach to reducing experimental errors considers a multi-input, multi-output (MIMO) controller design, yielding accurate reference tracking and noise rejection. In this paper, a framework for multi-axial real-time hybrid simulation (maRTHS) testing is presented. The methodology employs a real-time feedback-feedforward controller for multiple actuators commanded in Cartesian coordinates. Kinematic transformations between actuator space and Cartesian space are derived for all six-degrees-of- freedom of the moving platform. Then, a frequency domain identification technique is used to develop an accurate MIMO transfer function of the system. Further, a Cartesian-domain model-based feedforward-feedback controller is implemented for time lag compensation and to increase the robustness of the reference tracking for given model uncertainty. The framework is implemented using the 1/5th-scale Load and Boundary Condition Box (LBCB) located at the University of Illinois at Urbana- Champaign. To demonstrate the efficacy of the proposed methodology, a single-story frame subjected to earthquake loading is tested. One of the columns in the fraane is represented physically in the laboratory as a cantilevered steel column. For real- time execution, the numerical substructure, kinematic transformations, and controllers are implemented on a digital signal processor. Results show excellent performance of the maRTHS framework when six-degrees-of-freedom are controUed at the interface between substructures.展开更多
A solution scheme is proposed in this paper for an existing RTDHT system to simulate large-scale finite element (FE) numerical substructures. The analysis of the FE numerical substructure is split into response anal...A solution scheme is proposed in this paper for an existing RTDHT system to simulate large-scale finite element (FE) numerical substructures. The analysis of the FE numerical substructure is split into response analysis and signal generation tasks, and executed in two different target computers in real-time. One target computer implements the response analysis task, wherein a large time-step is used to solve the FE substructure, and another target computer implements the signal generation task, wherein an interpolation program is used to generate control signals in a small time-step to meet the input demand of the controller. By using this strategy, the scale of the FE numerical substructure simulation may be increased significantly. The proposed scheme is initially verified by two FE numerical substructure models with 98 and 1240 degrees of freedom (DOFs). Thereafter, RTDHTs of a single frame-foundation structure are implemented where the foundation, considered as the numerical substructure, is simulated by the FE model with 1240 DOFs. Good agreements between the results of the RTDHT and those from the FE analysis in ABAQUS are obtained.展开更多
A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction ...A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.展开更多
A class of hybrid algorithms of real-time simulation based on evaluation of non-integerstep right-hand side function are presented in this paper. And some results of the convergence and stability of the algorithms are...A class of hybrid algorithms of real-time simulation based on evaluation of non-integerstep right-hand side function are presented in this paper. And some results of the convergence and stability of the algorithms are given. Using the class of algorithms, evaluation for the right-hand side function is needed once in every integration-step. Moreover, comparing with the other methods with the same amount of work, their numerical stability regions are larger and the method errors are smaller, and the numerical experiments show that the algorithms are very effective.展开更多
Hybrid simulation can be a cost effective approach for dynamic testing of structural components at full scale while capturing the system level response through interactions with a numerical model.The dynamic response ...Hybrid simulation can be a cost effective approach for dynamic testing of structural components at full scale while capturing the system level response through interactions with a numerical model.The dynamic response of a seismically isolated structure depends on the combined characteristics of the ground motion,bearings,and superstructure.Therefore,dynamic full-scale system level tests of isolated structures under realistic dynamic loading conditions are desirable towards a holistic validation of this earthquake protection strategy.Moreover,bearing properties and their ultimate behavior have been shown to be highly dependent on rate-of-loading and scale size effects,especially under extreme loading conditions.Few laboratory facilities can test full-scale seismic isolation bearings under prescribed displacement and/or loading protocols.The adaptation of a full-scale bearing test machine for the implementation of real-time hybrid simulation is presented here with a focus on the challenges encountered in attaining reliable simulation results for large scale dynamic tests.These advanced real-time hybrid simulations of large and complex hybrid models with several thousands of degrees of freedom are some of the first to use high performance parallel computing to rapidly execute the numerical analyses.Challenges in the experimental setup included measured forces contaminated by delay and other systematic control errors in applying desired displacements.Friction and inertial forces generated by the large-scale loading apparatus can affect the accuracy of measured force feedbacks.Reliable results from real-time hybrid simulation requires implementation of compensation algorithms and correction of these various sources of errors.Overall,this research program confirms that real-time hybrid simulation is a viable testing method to experimentally assess the behavior of full-scale isolators while capturing interactions with the numerical models of the superstructure to evaluate system level and in-structure response.展开更多
The development process as well as the core theory of distributed interactive simulation and high level architecture are discussed, and combined with graphics features, a system of real time distributed visual simula...The development process as well as the core theory of distributed interactive simulation and high level architecture are discussed, and combined with graphics features, a system of real time distributed visual simulation is established. Based on computer network, simulation platform is built by installing related software and modeling object, and the interactive functions are extended by programming. A set of solutions for building a distributed visual simulation system that include both hardware and software are put forward, and a practical instance is also provided. The whole building process can be summarized into two steps that are scheme consideration and system realization.展开更多
Tuned liquid damper (TLD) and tuned liquid column damper (TLCD) are two types of passive control devices that are widely used in structural control. In this study, a real-time hybrid simulation (RTHS) technique is emp...Tuned liquid damper (TLD) and tuned liquid column damper (TLCD) are two types of passive control devices that are widely used in structural control. In this study, a real-time hybrid simulation (RTHS) technique is employed to investigate the diff erence in control performance between TLD and TLCD. A series of RTHSs is presented with the premise of the same liquid length, mass ratio, and structural parameters. Herein, TLD and TLCD are physically experimented, and controlled structures are numerically simulated. Then, parametric studies are performed to further evaluate the diff erent performance between TLD and TLCD. Experimental results demonstrate that TLD is more eff ective than TLCD under diff erent amplitude excitations.展开更多
Aiming at the problems of unreliable data transmission,poor steadiness,nonsupport of complex data types,direct couple between data transmission and exchange,a high-level method based on advanced message queuing protoc...Aiming at the problems of unreliable data transmission,poor steadiness,nonsupport of complex data types,direct couple between data transmission and exchange,a high-level method based on advanced message queuing protocol( AMQP) is proposed to integrate naval distributed tactical training simulation system after serious consideration with current information exchange features of military combat system. Transferring layer in traditional user datagram protocol is implemented by publishing and subscribing scheme of message middleware. By creating message model to standardize message structure,integration architecture is formulated to resolve potential information security risks from inconsistent data type and express data transmission. Meanwhile,a communication model is put forward based on AMQP,which is in the center position of the whole transmission framework and responsible for reliably transferring battlefield data among subsystems. Experiments show that the method can accurately post amounts of data to the subscriber without error and loss,and can get excellent real-time performance of data exchange.展开更多
The delay compensation method plays an essential role in maintaining the stability and achieving accurate real-time hybrid simulation results. The effectiveness of various compensation methods in different test scenar...The delay compensation method plays an essential role in maintaining the stability and achieving accurate real-time hybrid simulation results. The effectiveness of various compensation methods in different test scenarios, however, needs to be quantitatively evaluated. In this study, four compensation methods (i.e., the polynomial extrapolation, the linear acceleration extrapolation, the inverse compensation and the adaptive inverse compensation) are selected and compared experimentally using a frequency evaluation index (FEI) method. The effectiveness of the FEI method is first verified through comparison with the discrete transfer fimction approach for compensation methods assuming constant delay. Incomparable advantage is further demonstrated for the FEI method when applied to adaptive compensation methods, where the discrete transfer function approach is difficult to implement. Both numerical simulation and laboratory tests with predefined displacements are conducted using sinusoidal signals and random signals as inputs. Findings from numerical simulation and experimental results demonstrate that the FEI method is an efficient and effective approach to compare the performance of different compensation methods, especially for those requiring adaptation of compensation parameters.展开更多
In this paper a class of real-time parallel modified Rosenbrock methods of numerical simulation is constructed for stiff dynamic systems on a multiprocessor system, and convergence and numerical stability of these met...In this paper a class of real-time parallel modified Rosenbrock methods of numerical simulation is constructed for stiff dynamic systems on a multiprocessor system, and convergence and numerical stability of these methods are discussed. A-stable real-time parallel formula of two-stage third-order and A(α)-stable real-time parallel formula with o ≈ 89.96° of three-stage fourth-order are particularly given. The numerical simulation experiments in parallel environment show that the class of algorithms is efficient and applicable, with greater speedup.展开更多
Real-time hybrid simulation is an attractive method to evaluate the response of structures under earthquake loads. The method is a variation of the pseudodynamic testing technique in which the experiment is executed i...Real-time hybrid simulation is an attractive method to evaluate the response of structures under earthquake loads. The method is a variation of the pseudodynamic testing technique in which the experiment is executed in real time, thus allowing investigation of structural systems with rate-dependent components. Real-time hybrid simulation is challenging because it requires performance of all calculations, application of displacements, and acquisition of measured forces, within a very small increment of time. Furthermore, unless appropriate compensation for actuator dynamics is implemented, stability problems are likely to occur during the experiment. This paper presents an approach for real-time hybrid simulation in which compensation for actuator dynamics is implemented using a model-based feedforward compensator. The method is used to evaluate the response of a semi-active control of a structure employing an MR damper. Experimental results show good agreement with the predicted responses, demonstrating the effectiveness of the method for structural control performance assessment.展开更多
This paper aims to investigate the critical stability of a multi-degree-of-freedom(multi-DOF)real-time hybrid simulation(RTHS).First,the critical time-delay analysis models are developed using the continuous-and discr...This paper aims to investigate the critical stability of a multi-degree-of-freedom(multi-DOF)real-time hybrid simulation(RTHS).First,the critical time-delay analysis models are developed using the continuous-and discrete-time root locus(RL)techniques,respectively.A bilinear transform is introduced into the first-order Padéapproximation while conducting the discrete RL analysis.Based on this technique,the time delay can be explicitly used as the gain factor and thus the instability mechanism of the multi-DOF RTHS system can be analyzed.Subsequently,the critical time delays calculated by the continuous-and discrete-time RL techniques,respectively,are compared for a 2-DOF RTHS system.It is shown that assuming the RTHS system to be a continuous-time system will result in overestimating the critical time delay.Finally,theoretically calculated critical delays are demonstrated and validated by numerical simulation and a set of RTHS experiments.Parametric analysis provides a glimpse of the effects of time step,frequency and damping ratio in a performing partitioning scheme.The constructed analysis model proves to be useful for evaluating the critical time delay to predict stability and performance,therefore facilitating successful RTHS.展开更多
Variable curvature friction pendulum bearings(VCFPB)effectively reduce the dynamic response of storage tanks induced by earthquakes.Shaking table testing is used to assess the seismic performance of VCFPB isolated sto...Variable curvature friction pendulum bearings(VCFPB)effectively reduce the dynamic response of storage tanks induced by earthquakes.Shaking table testing is used to assess the seismic performance of VCFPB isolated storage tanks.However,the vertical pressure and friction coefficient of the scaled VCFPB in the shaking table tests cannot match the equivalent values of these parameters in the prototype.To avoid this drawback,a real-time hybrid simulation(RTHS)test was developed.Using RTHS testing,a 1/8 scaled tank isolated by VCFPB was tested.The experimental results showed that the displacement dynamic magnification factor of VCFPB,peak reduction factors of the acceleration,shear force,and overturning moment at bottom of the tank,were negative exponential functions of the ratio of peak ground acceleration(PGA)and friction coefficient.The peak reduction factors of displacement,acceleration,force and overturning moment,which were obtained from the experimental results,are compared with those calculated by the Housner model.It can be concluded that the Housner model is applicable in estimation of the acceleration,shear force,and overturning moment of liquid storage tank,but not for the sliding displacement of VCFPBs.展开更多
文摘An attempt has been made to develop a distributed software infrastructure model for onboard data fusion system simulation, which is also applied to netted radar systems, onboard distributed detection systems and advanced C3I systems. Two architectures are provided and verified: one is based on pure TCP/IP protocol and C/S model, and implemented with Winsock, the other is based on CORBA (common object request broker architecture). The performance of data fusion simulation system, i.e. reliability, flexibility and scalability, is improved and enhanced by two models. The study of them makes valuable explore on incorporating the distributed computation concepts into radar system simulation techniques.
文摘Based on MATRIXx, a universal real-time visual distributed simulation system is developed. The system can receive different input data from network or local terminal. Application models in the simulation modules can automatically get such data to be analyzed and calculated, and then produce real-time simulation control information. Meanwhile, this paper designs relevant simulation components to implement the input and output data, which can guarantee the real-time and universal of the data transmission. Result of the experimental system shows that the real-time performance of the simulation is perfect.
基金National Key Technology P&D Program,No.2012BAB02B00The Fundamental Research Funds for the Central Universities
文摘The objective of this study is to quantitatively evaluate Tropical Rainfall Measuring Mission (TRMM) data with rain gauge data and further to use this TRMM data to drive a Dis- tributed Time-Variant Gain Model (DTVGM) to perform hydrological simulations in the semi-humid Weihe River catchment in China. Before the simulations, a comparison with a 10-year (2001-2010) daily rain gauge data set reveals that, at daily time step, TRMM rainfall data are better at capturing rain occurrence and mean values than rainfall extremes. On a monthly time scale, good linear relationships between TRMM and rain gauge rainfall data are found, with determination coefficients R2 varying between 0.78 and 0.89 for the individual stations. Subsequent simulation results of seven years (2001-2007) of data on daily hydro- logical processes confirm that the DTVGM when calibrated by rain gauge data performs better than when calibrated by TRMM data, but the performance of the simulation driven by TRMM data is better than that driven by gauge data on a monthly time scale. The results thus suggest that TRMM rainfall data are more suitable for monthly streamfiow simulation in the study area, and that, when the effects of recalibration and the results for water balance components are also taken into account, the TRMM 3B42-V7 product has the potential to perform well in similar basins.
基金Supported by Yunnan Fundamental Research Projects(Nos.202301AT070469,202301AT070275)Supported by Yunnan Major Scientific and Technological Projects(No.202202AG050002).
文摘Smelting with oxygen bottom blowing is one of the main methods used in the frame of copper pyrometallurgy.With this approach,feed materials and oxygen-enriched air are introduced in reversed order to enhance multiphaseflow within the furnace.Understanding the flow structure and temperature distribution in this setup is crucial foroptimizing production.In this study,gas-liquid interactions,and temperature profiles under varying air-injectionconditions are examined by means of numerical simulation for a 3.2 m×20 m furnace.The results indicate that thehigh-velocity regions are essentially distributed near the lance within the reaction region and the flue gas outlet,while low-velocity regions are located close to the furnace walls on both side of the reaction region.Dead regionsappear in the sedimentation region,with gas velocities surpassing those of the molten phase.As the injection rateincreases from 0.50 to 0.80 Nm3/s,the stabilization time of the average liquid surface velocity decreases from 2.6 sto 1.9 s,exhibiting a similar trend to the gas holdup.During stabilization,the average liquid surface velocity risesfrom 0.505 to 0.702 m/s.The average turbulent kinetic energy(TKE)of the fluid in the molten bath increases from0.095 to 0.162 m^(2)/s^(2).The proportion of the area distribution with TKE greater than 0.10 m^(2)/s^(2) and the gas holdupat steady state both rise with an increase in the injection quantity.The maximum splashing height of the melt growsfrom approximately 0.756 to 1.154 m,with the affected area expanding from 14.239 to 20.498 m^(2).Under differentworking conditions with varying injection quantities,the average temperature changes in melt zone and flue gaszone of the furnace are small.The temperature in the melt and in the flue-gas zone spans the interval 1200℃–1257℃,and 1073℃–1121℃,respectively.The temperature distribution of the melt and flue gas reveals a patterncharacterized by elevated temperatures in the reaction zone,gradually transitioning to lower temperatures in thesedimentation region.
基金supported by the National Natural Science Foundation of China(No.52274026)the National Key Research and Development Program(No.2022YFC2806504)the CNOOC Research Project(No.KJGG-2022-17-04 and NO.KJGG-2022-17-05).
文摘Effective isolation between the cement sheath and the sandstone is crucial for the development and production of oil and gas wells in sandstone formations.In this study,a cement-sandstone composite(CSC)was prepared,and based onμ-CT three-dimensional reconstruction imaging and finite element analysis(FEA)techniques,the stress distribution and potential failure mechanism at the cement-sandstone bonding interface under axial loading were analyzed.The key findings are as follows:(1)stress concentrations are highly likely to form at the gap between the cement and sandstone interface and around interfacial voids,with Von Mises stress reaching critical levels of 18.0-20.0 MPa at these locations,significantly exceeding the stress magnitudes in well-bonded regions;(2)the phenomenon of local stress concentration driven by interfacial defects can be identified as the main basis for predicting damage location in interfacial debonding and continuous shear under axial load;(3)ensuring tight cementation at the cement-sandstone interface and minimizing interfacial voids are paramount for preventing stress-induced failure;(4)the critical Von Mises stress value of 20 MPa at the interface defect can be used as a benchmark for material selection and designed to ensure long-term integrity in oil and gas well applications subjected to similar axial loads.These findings contribute to a more accurate understanding of the failure mechanism of the cement-sandstone interface and to the precise design of material properties,thereby ensuring the long-term integrity of oil and gas well applications subjected to similar axial loads.
文摘A model suitable for describing the mechanical response of thin elastic objects is proposed to simulate the deformation of guide wires in minimally invasive interventions. The main objective of this simulation is to provide doctors an opportunity to rehearse the surgery and select an optimal operation plan before the real surgery. In this model the guide wire is discretized with the multi-body representation and its elastic energy derivate from elastic theory is a polynomial function of the nodal displacements. The vascular structure is represented by a tetrahedron mesh extended from the triangular mesh of the artery, which can be extracted from the patient's CT image data. The model applies the energy decline process of the conjugate gradient method to the deformation simulation of the guide wire. Experimental results show that the polynomial relationship between elastic energy and nodal displacements tremendously simplifies the evaluation of the conjugate gradient method and significantly improves the model's efficiency. Compared with models depending on an explicit scheme for evaluation, the new model is not only non-conditionally stable but also more efficient. The model can be applied to the real-time simulation of guide wire in a vascular structure.
文摘Modeling technology has been introduced into software testing field.However,how to carry through the testing modeling effectively is still a difficulty.Based on combination of simulation modeling technology and embedded real-time software testing method,the process of simulation testing modeling is studied first.And then,the supporting environment of simulation testing modeling is put forward.Furthermore,an approach of embedded real-time software simulation testing modeling including modeling of cross-linked equipments of system under testing(SUT),test case,testing scheduling,and testing system service is brought forward.Finally,the formalized description and execution system of testing models are given,with which we can realize real-time,closed loop,mad automated system testing for embedded real-time software.
基金CONICYT-Chile through Becas Chile Scholarship under Grant No.72140204Universidad Tecnica Federico Santa Maria(Chile)through Faculty Development Scholarship under Grant No.208-13
文摘Real-time hybrid simulation is an efficient and cost-effective dynamic testing technique for performance evaluation of structural systems subjected to earthquake loading with rate-dependent behavior. A loading assembly with multiple actuators is required to impose realistic boundary conditions on physical specimens. However, such a testing system is expected to exhibit significant dynamic coupling of the actuators and suffer from time lags that are associated with the dynamics of the servo-hydraulic system, as well as control-structure interaction (CSI). One approach to reducing experimental errors considers a multi-input, multi-output (MIMO) controller design, yielding accurate reference tracking and noise rejection. In this paper, a framework for multi-axial real-time hybrid simulation (maRTHS) testing is presented. The methodology employs a real-time feedback-feedforward controller for multiple actuators commanded in Cartesian coordinates. Kinematic transformations between actuator space and Cartesian space are derived for all six-degrees-of- freedom of the moving platform. Then, a frequency domain identification technique is used to develop an accurate MIMO transfer function of the system. Further, a Cartesian-domain model-based feedforward-feedback controller is implemented for time lag compensation and to increase the robustness of the reference tracking for given model uncertainty. The framework is implemented using the 1/5th-scale Load and Boundary Condition Box (LBCB) located at the University of Illinois at Urbana- Champaign. To demonstrate the efficacy of the proposed methodology, a single-story frame subjected to earthquake loading is tested. One of the columns in the fraane is represented physically in the laboratory as a cantilevered steel column. For real- time execution, the numerical substructure, kinematic transformations, and controllers are implemented on a digital signal processor. Results show excellent performance of the maRTHS framework when six-degrees-of-freedom are controUed at the interface between substructures.
基金National Natural Science Foundation under Grant Nos.51179093,91215301 and 41274106the Specialized Research Fund for the Doctoral Program of Higher Education under Grant No.20130002110032Tsinghua University Initiative Scientific Research Program under Grant No.20131089285
文摘A solution scheme is proposed in this paper for an existing RTDHT system to simulate large-scale finite element (FE) numerical substructures. The analysis of the FE numerical substructure is split into response analysis and signal generation tasks, and executed in two different target computers in real-time. One target computer implements the response analysis task, wherein a large time-step is used to solve the FE substructure, and another target computer implements the signal generation task, wherein an interpolation program is used to generate control signals in a small time-step to meet the input demand of the controller. By using this strategy, the scale of the FE numerical substructure simulation may be increased significantly. The proposed scheme is initially verified by two FE numerical substructure models with 98 and 1240 degrees of freedom (DOFs). Thereafter, RTDHTs of a single frame-foundation structure are implemented where the foundation, considered as the numerical substructure, is simulated by the FE model with 1240 DOFs. Good agreements between the results of the RTDHT and those from the FE analysis in ABAQUS are obtained.
基金National Natural Science Foundation of China(No.50539120)National Basic Research Program of China("973"Program,No. 2007 CB714101)+1 种基金National Science Fund for Distinguished Young Scholars of China(No.50525927)National Natural Science Founda-tion of China(No.50579045)
文摘A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.
文摘A class of hybrid algorithms of real-time simulation based on evaluation of non-integerstep right-hand side function are presented in this paper. And some results of the convergence and stability of the algorithms are given. Using the class of algorithms, evaluation for the right-hand side function is needed once in every integration-step. Moreover, comparing with the other methods with the same amount of work, their numerical stability regions are larger and the method errors are smaller, and the numerical experiments show that the algorithms are very effective.
文摘Hybrid simulation can be a cost effective approach for dynamic testing of structural components at full scale while capturing the system level response through interactions with a numerical model.The dynamic response of a seismically isolated structure depends on the combined characteristics of the ground motion,bearings,and superstructure.Therefore,dynamic full-scale system level tests of isolated structures under realistic dynamic loading conditions are desirable towards a holistic validation of this earthquake protection strategy.Moreover,bearing properties and their ultimate behavior have been shown to be highly dependent on rate-of-loading and scale size effects,especially under extreme loading conditions.Few laboratory facilities can test full-scale seismic isolation bearings under prescribed displacement and/or loading protocols.The adaptation of a full-scale bearing test machine for the implementation of real-time hybrid simulation is presented here with a focus on the challenges encountered in attaining reliable simulation results for large scale dynamic tests.These advanced real-time hybrid simulations of large and complex hybrid models with several thousands of degrees of freedom are some of the first to use high performance parallel computing to rapidly execute the numerical analyses.Challenges in the experimental setup included measured forces contaminated by delay and other systematic control errors in applying desired displacements.Friction and inertial forces generated by the large-scale loading apparatus can affect the accuracy of measured force feedbacks.Reliable results from real-time hybrid simulation requires implementation of compensation algorithms and correction of these various sources of errors.Overall,this research program confirms that real-time hybrid simulation is a viable testing method to experimentally assess the behavior of full-scale isolators while capturing interactions with the numerical models of the superstructure to evaluate system level and in-structure response.
文摘The development process as well as the core theory of distributed interactive simulation and high level architecture are discussed, and combined with graphics features, a system of real time distributed visual simulation is established. Based on computer network, simulation platform is built by installing related software and modeling object, and the interactive functions are extended by programming. A set of solutions for building a distributed visual simulation system that include both hardware and software are put forward, and a practical instance is also provided. The whole building process can be summarized into two steps that are scheme consideration and system realization.
基金National Natural Science Foundation of China under Grant Nos.51725901 and 51639006
文摘Tuned liquid damper (TLD) and tuned liquid column damper (TLCD) are two types of passive control devices that are widely used in structural control. In this study, a real-time hybrid simulation (RTHS) technique is employed to investigate the diff erence in control performance between TLD and TLCD. A series of RTHSs is presented with the premise of the same liquid length, mass ratio, and structural parameters. Herein, TLD and TLCD are physically experimented, and controlled structures are numerically simulated. Then, parametric studies are performed to further evaluate the diff erent performance between TLD and TLCD. Experimental results demonstrate that TLD is more eff ective than TLCD under diff erent amplitude excitations.
基金Supported by the National Natural Science Foundation of China(No.61401496)
文摘Aiming at the problems of unreliable data transmission,poor steadiness,nonsupport of complex data types,direct couple between data transmission and exchange,a high-level method based on advanced message queuing protocol( AMQP) is proposed to integrate naval distributed tactical training simulation system after serious consideration with current information exchange features of military combat system. Transferring layer in traditional user datagram protocol is implemented by publishing and subscribing scheme of message middleware. By creating message model to standardize message structure,integration architecture is formulated to resolve potential information security risks from inconsistent data type and express data transmission. Meanwhile,a communication model is put forward based on AMQP,which is in the center position of the whole transmission framework and responsible for reliably transferring battlefield data among subsystems. Experiments show that the method can accurately post amounts of data to the subscriber without error and loss,and can get excellent real-time performance of data exchange.
基金National Natural Science Foundation of China under Grant No.51378107the Fundamental Research Funds for the Central Universities and Priority Academic Program Development of Jiangsu Higher Education Institutions under Grant No.KYLX-0158the National Natural Science Foundation under Grant No.CMMI-1227962
文摘The delay compensation method plays an essential role in maintaining the stability and achieving accurate real-time hybrid simulation results. The effectiveness of various compensation methods in different test scenarios, however, needs to be quantitatively evaluated. In this study, four compensation methods (i.e., the polynomial extrapolation, the linear acceleration extrapolation, the inverse compensation and the adaptive inverse compensation) are selected and compared experimentally using a frequency evaluation index (FEI) method. The effectiveness of the FEI method is first verified through comparison with the discrete transfer fimction approach for compensation methods assuming constant delay. Incomparable advantage is further demonstrated for the FEI method when applied to adaptive compensation methods, where the discrete transfer function approach is difficult to implement. Both numerical simulation and laboratory tests with predefined displacements are conducted using sinusoidal signals and random signals as inputs. Findings from numerical simulation and experimental results demonstrate that the FEI method is an efficient and effective approach to compare the performance of different compensation methods, especially for those requiring adaptation of compensation parameters.
基金This project was supported by the National Natural Science Foundation of China (No. 19871080).
文摘In this paper a class of real-time parallel modified Rosenbrock methods of numerical simulation is constructed for stiff dynamic systems on a multiprocessor system, and convergence and numerical stability of these methods are discussed. A-stable real-time parallel formula of two-stage third-order and A(α)-stable real-time parallel formula with o ≈ 89.96° of three-stage fourth-order are particularly given. The numerical simulation experiments in parallel environment show that the class of algorithms is efficient and applicable, with greater speedup.
基金National Science Foundation Graduate Research Fellowship
文摘Real-time hybrid simulation is an attractive method to evaluate the response of structures under earthquake loads. The method is a variation of the pseudodynamic testing technique in which the experiment is executed in real time, thus allowing investigation of structural systems with rate-dependent components. Real-time hybrid simulation is challenging because it requires performance of all calculations, application of displacements, and acquisition of measured forces, within a very small increment of time. Furthermore, unless appropriate compensation for actuator dynamics is implemented, stability problems are likely to occur during the experiment. This paper presents an approach for real-time hybrid simulation in which compensation for actuator dynamics is implemented using a model-based feedforward compensator. The method is used to evaluate the response of a semi-active control of a structure employing an MR damper. Experimental results show good agreement with the predicted responses, demonstrating the effectiveness of the method for structural control performance assessment.
基金National Natural Science Foundation of China under Grant Nos.51725901 and 51639006。
文摘This paper aims to investigate the critical stability of a multi-degree-of-freedom(multi-DOF)real-time hybrid simulation(RTHS).First,the critical time-delay analysis models are developed using the continuous-and discrete-time root locus(RL)techniques,respectively.A bilinear transform is introduced into the first-order Padéapproximation while conducting the discrete RL analysis.Based on this technique,the time delay can be explicitly used as the gain factor and thus the instability mechanism of the multi-DOF RTHS system can be analyzed.Subsequently,the critical time delays calculated by the continuous-and discrete-time RL techniques,respectively,are compared for a 2-DOF RTHS system.It is shown that assuming the RTHS system to be a continuous-time system will result in overestimating the critical time delay.Finally,theoretically calculated critical delays are demonstrated and validated by numerical simulation and a set of RTHS experiments.Parametric analysis provides a glimpse of the effects of time step,frequency and damping ratio in a performing partitioning scheme.The constructed analysis model proves to be useful for evaluating the critical time delay to predict stability and performance,therefore facilitating successful RTHS.
基金Scientific Research Fund of Institute of Engineering Mechanics,China Earthquake Administration under Grant No.2018D03the National Natural Science Foundation of China under Grant Nos.51608016 and 51421005。
文摘Variable curvature friction pendulum bearings(VCFPB)effectively reduce the dynamic response of storage tanks induced by earthquakes.Shaking table testing is used to assess the seismic performance of VCFPB isolated storage tanks.However,the vertical pressure and friction coefficient of the scaled VCFPB in the shaking table tests cannot match the equivalent values of these parameters in the prototype.To avoid this drawback,a real-time hybrid simulation(RTHS)test was developed.Using RTHS testing,a 1/8 scaled tank isolated by VCFPB was tested.The experimental results showed that the displacement dynamic magnification factor of VCFPB,peak reduction factors of the acceleration,shear force,and overturning moment at bottom of the tank,were negative exponential functions of the ratio of peak ground acceleration(PGA)and friction coefficient.The peak reduction factors of displacement,acceleration,force and overturning moment,which were obtained from the experimental results,are compared with those calculated by the Housner model.It can be concluded that the Housner model is applicable in estimation of the acceleration,shear force,and overturning moment of liquid storage tank,but not for the sliding displacement of VCFPBs.