Fraction repetition(FR)codes are integral in distributed storage systems(DSS)with exact repair-by-transfer,while pliable fraction repetition codes are vital for DSSs in which both the per-node storage and repetition d...Fraction repetition(FR)codes are integral in distributed storage systems(DSS)with exact repair-by-transfer,while pliable fraction repetition codes are vital for DSSs in which both the per-node storage and repetition degree can easily be adjusted simultaneously.This paper introduces a new type of pliable FR codes,called absolute balanced pliable FR(ABPFR)codes,in which the access balancing in DSS is considered.Additionally,the equivalence between pliable FR codes and resolvable transversal packings in combinatorial design theory is presented.Then constructions of pliable FR codes and ABPFR codes based on resolvable transversal packings are presented.展开更多
Typhoons can cause large-area blackouts or partial outages of distribution networks.We define a partial outage state in the distribution network as a gray state and propose a gray-start strategy and two-stage distribu...Typhoons can cause large-area blackouts or partial outages of distribution networks.We define a partial outage state in the distribution network as a gray state and propose a gray-start strategy and two-stage distribution network emergency recovery framework.A phase-space reconstruction and stacked integrated model for predicting wind and photovoltaic generation during typhoon disasters is proposed in the first stage.This provides guidance for second-stage post-disaster emergency recovery scheduling.The emergency recovery scheduling model is established in the second stage,and this model is supported by a thermal power-generating unit,mobile emergency generators,and distributed generators.Distributed generation includes wind power generation,photovoltaics,fuel cells,etc.Simultaneously,we con-sider the gray-start based on the pumped storage unit to be an important first step in the emergency recovery strategy.This model is val-idated on the improved IEEE 33 node system,which utilizes data from the 2022 super typhoon“Muifa”in Zhoushan,Zhejiang,China.Simulations indicate the superiority of a gray start with a pumped storage unit and the proposed emergency recovery strategy.展开更多
The volatility introduced by the integration of renewable energy poses challenges to the reliability of power supply,increasing the demand for energy storage in distribution networks.Shared energy storage in distribut...The volatility introduced by the integration of renewable energy poses challenges to the reliability of power supply,increasing the demand for energy storage in distribution networks.Shared energy storage in distribution networks can participate in energy storage allocation as a provider of reliability ancillary services.This paper proposes a novel Nash bargaining based energy storage coordinated allocation method to fully incentivize shared energy storage to participate in reliability services within the distribution network.First,an analytical reliability assessment model is constructed and embedded into the energy storage allocation model,where the impact of renewable energy uncertainty is described using chance constraints.Considering the interests of both the distribution network and shared energy storage operators,a Nash bargaining based energy storage coordinated allocation and benefit sharing mechanism is established,which is then transformed into a mixed-integer linear programming(MILP)model for efficient solution.Case studies show that the proposed method,through cooperation between the distribution system operator and shared energy storage operators,signif-icantly reduces investment cost of energy storage and ensures a rational distribution of the benefits obtained.展开更多
Grid-scale energy storage systems provide effective solutions to address challenges such as supply-load imbalances and voltage violations resulting from the non-coinciding nature of renewable energy generation and pea...Grid-scale energy storage systems provide effective solutions to address challenges such as supply-load imbalances and voltage violations resulting from the non-coinciding nature of renewable energy generation and peak demand incidents.While battery and hydrogen storage are commonly used for peak shaving,ice-based thermal energy storage systems(TESSs)offer a direct way to reduce cooling loads without electrical conversion.This paper presents a multi-objective planning framework that optimizes TESS dispatch,network topology,and photovoltaic(PV)inverter reactive power support to address operational issues in active distribution networks.The objectives of the proposed scheme include minimizing peak demand,voltage deviations,and PV inverter VAr dependency.The mixed-integer nonlinear programming problem is solved using a Pareto-based multi-objective particle swarm optimization(MOPSO)method.The MATLAB-OpenDSS simulations for a modified IEEE-123 bus system show a 7.1%reduction in peak demand,a 13%reduction in voltage deviation,and a 52%drop in PV inverter VAr usage.The obtained solutions confirm minimal operational stress on control devices such as switches and PV inverters.Thus,unlike earlier studies,this work combines all three strategies to offer an effective solution for the operational planning of the active distribution network.展开更多
Distributed photovoltaic(PV)is one of the important power sources for building a new power system with new energy as the main body.The rapid development of distributed PV has brought new challenges to the operation of...Distributed photovoltaic(PV)is one of the important power sources for building a new power system with new energy as the main body.The rapid development of distributed PV has brought new challenges to the operation of distribution networks.In order to improve the absorption ability of large-scale distributed PV access to the distribution network,the AC/DC hybrid distribution network is constructed based on flexible interconnection technology,and a coordinated scheduling strategy model of hydrogen energy storage(HS)and distributed PV is established.Firstly,the mathematical model of distributed PV and HS system is established,and a comprehensive energy storage system combining seasonal hydrogen energy storage(SHS)and battery(BT)is proposed.Then,a flexible interconnected distribution network scheduling optimization model is established to minimize the total active power loss,voltage deviation and system operating cost.Finally,simulation analysis is carried out on the improved IEEE33 node,the NSGA-II algorithm is used to solve specific examples,and the optimal scheduling results of the comprehensive economy and power quality of the distribution network are obtained.Compared with the method that does not consider HS and flexible interconnection technology,the network loss and voltage deviation of this method are lower,and the total system cost can be reduced by 3.55%,which verifies the effectiveness of the proposed method.展开更多
The new energy power generation is becoming increasingly important in the power system.Such as photovoltaic power generation has become a research hotspot,however,due to the characteristics of light radiation changes,...The new energy power generation is becoming increasingly important in the power system.Such as photovoltaic power generation has become a research hotspot,however,due to the characteristics of light radiation changes,photovoltaic power generation is unstable and random,resulting in a low utilization rate and directly affecting the stability of the power grid.To solve this problem,this paper proposes a coordinated control strategy for a newenergy power generation system with a hybrid energy storage unit based on the lithium iron phosphate-supercapacitor hybrid energy storage unit.Firstly,the variational mode decomposition algorithm is used to separate the high and low frequencies of the power signal,which is conducive to the rapid and accurate suppression of the power fluctuation of the energy storage system.Secondly,the fuzzy control algorithm is introduced to balance the power between energy storage.In this paper,the actual data is used for simulation,and the simulation results show that the strategy realizes the effective suppression of the bus voltage fluctuation and the accurate control of the internal state of the energy storage unit,effectively avoiding problems such as overshoot and over-discharge,and can significantly improve the stability of the photovoltaic power generation systemand the stability of the Direct Current bus.It is of great significance to promote the development of collaborative control technology for photovoltaic hybrid energy storage units.展开更多
To adapt to the uncertainty of new energy,increase new energy consumption,and reduce carbon emissions,a high-voltage distribution network energy storage planning model based on robustness-oriented planning and distrib...To adapt to the uncertainty of new energy,increase new energy consumption,and reduce carbon emissions,a high-voltage distribution network energy storage planning model based on robustness-oriented planning and distributed new energy consumption is proposed.Firstly,the spatio-temporal correlation of large-scale wind-photovoltaic energy is modeled based on the Vine Copula model,and the spatial correlation of the generated wind-photovoltaic power generation is corrected to get the spatio-temporal correlation of wind-photovoltaic power generation scenarios.Finally,considering the subsequent development of new energy on demand for high-voltage distribution network peaking margin and the economy of the system peaking,we propose the optimization model of high-voltage distribution network energy storage plant siting and capacity setting for source-storage cooperative peaking.The simulation results show that the proposed energy storage plant planning method can effectively alleviate the branch circuit blockage,promote new energy consumption,reduce the burden of the main grid peak shifting,and leave sufficient peak shifting margin for the subsequent development of a new energy distribution network while ensuring the economy.展开更多
In high-renewable-energy power systems,the demand for fast-responding capabilities is growing.To address the limitations of conventional closed-loop frequency control,where the integral coefficient cannot dynamically ...In high-renewable-energy power systems,the demand for fast-responding capabilities is growing.To address the limitations of conventional closed-loop frequency control,where the integral coefficient cannot dynamically adjust the frequency regulation command based on the state of charge(SoC)of energy storage units,this paper proposes a secondary frequency regulation control strategy based on variable integral coefficients for multiple energy storage units.First,a power-uniform controller is designed to ensure that thermal power units gradually take on more regulation power during the frequency regulation process.Next,a control framework based on variable integral coefficients is proposed within the secondary frequency regulation model,along with an objective function that simultaneously considers both Automatic Generation Control(AGC)command tracking performance and SoC recovery requirements of energy storage units.Finally,a gradient descent optimization method is used to dynamically adjust the gain of the energy storage integral controller,allowingmultiple energy storage units to respond in real-time to AGC instructions and SoC variations.Simulation results confirmthe effectiveness of the proposedmethod.Compared to traditional strategies,the proposed approach takes into account the SoCdiscrepancies amongmultiple energy storage units and the duration of system net power imbalances.It successfully implements secondary frequency regulation while achieving dynamic power allocation among the units.展开更多
Cyclic injection holds great potential for CO_(2) emission reduction coupled with enhanced unconventional oil recovery.There is,however,a lack of a thorough understanding of carbon distribution,migration,and transform...Cyclic injection holds great potential for CO_(2) emission reduction coupled with enhanced unconventional oil recovery.There is,however,a lack of a thorough understanding of carbon distribution,migration,and transformation underground over time at the reservoir scale.To address this issue,we conducted a rig-orous numerical simulation integrating microseismic events,multi-geomechanics,and multi-geochemistry to represent the complex fracture geometry,rock stress sensitivity,and CO_(2)-oil-brine-rock interactions.The fluid model,reservoir model,and geochemical reaction kinetics were carefully validated and calibrated using experimental data.The performance of CO_(2) utilization and geological storage was comprehensively investigated in terms of changes in oil production,CO_(2) storage,carbon distribution,and petrophysical properties.The results indicate that 48.3%of the injected CO_(2) was stored stably under-ground after ten cycles(ten years),with a 3.4%increase in oil recovery.The presence of multiple CO_(2) stor-age forms,such as dissolved in water and mineralized carbonate,impeded CO_(2)-oil interaction,leading to a 25.9%reduction in the volume of the CO_(2)-oil mixing zone and a 2.2%decrease in cumulative oil pro-duction,albeit with a 7.7%increase in the storage rate.The cyclic injection mode had a significant impact on the migration and transformation of CO_(2) in the reservoir.While dissolved CO_(2) in oil accounted for over half of the total storage,it had the possibility of being released during production.After ten cycles,20%of the injected CO_(2)(approximately 12000 t)reached long-term storage in four forms:mineralized carbon-ate(6%),water-dissolved CO_(2)(6%),aqueous ions(4%),and trapped gas(4%).Notably,the non-fracture zone within the stimulated reservoir volume(SRV)served as the primary trapping area for residual gas.This work provides valuable insights into dynamic CO_(2) transport and transformation processes under cyclic injection and presents a more comprehensive and precise framework for assessing CO_(2) capture,utilization,and storage with enhanced oil recovery(CCUS-EOR)performance in unconventional reser-voirs after fracturing.展开更多
To reduce the time required to complete the regeneration process of erasure codes, we propose a Tree-structured Parallel Regeneration (TPR) scheme for multiple data losses in distributed storage systems. Under the sch...To reduce the time required to complete the regeneration process of erasure codes, we propose a Tree-structured Parallel Regeneration (TPR) scheme for multiple data losses in distributed storage systems. Under the scheme, two algorithms are proposed for the construction of multiple regeneration trees, namely the edge-disjoint algorithm and edge-sharing algorithm. The edge-disjoint algorithm constructs multiple independent trees, and is simple and appropriate for environments where newcomers and their providers are distributed over a large area and have few intersections. The edge-sharing algorithm constructs multiple trees that compete to utilize the bandwidth, and make a better utilization of the bandwidth, although it needs to measure the available band-width and deal with the bandwidth changes; it is therefore difficult to implement in practical systems. The parallel regeneration for multiple data losses of TPR primarily includes two optimizations: firstly, transferring the data through the bandwidth optimized-paths in a pipe-line manner; secondly, executing data regeneration over multiple trees in parallel. To evaluate the proposal, we implement an event-based simulator and make a detailed comparison with some popular regeneration methods. The quantitative comparison results show that the use of TPR employing either the edge-disjoint algorithm or edge-sharing algorithm reduces the regeneration time significantly.展开更多
Distributed storage can store data in multiple devices or servers to improve data security.However,in today’s explosive growth of network data,traditional distributed storage scheme is faced with some severe challeng...Distributed storage can store data in multiple devices or servers to improve data security.However,in today’s explosive growth of network data,traditional distributed storage scheme is faced with some severe challenges such as insufficient performance,data tampering,and data lose.A distributed storage scheme based on blockchain has been proposed to improve security and efficiency of traditional distributed storage.Under this scheme,the following improvements have been made in this paper.This paper first analyzes the problems faced by distributed storage.Then proposed to build a new distributed storage blockchain scheme with sharding blockchain.The proposed scheme realizes the partitioning of the network and nodes by means of blockchain sharding technology,which can improve the efficiency of data verification between nodes.In addition,this paper uses polynomial commitment to construct a new verifiable secret share scheme called PolyVSS.This new scheme is one of the foundations for building our improved distributed storage blockchain scheme.Compared with the previous scheme,our new scheme does not require a trusted third party and has some new features such as homomorphic and batch opening.The security of VSS can be further improved.Experimental comparisons show that the proposed scheme significantly reduces storage and communication costs.展开更多
This paper describes the architecture of global distributed storage system for data grid. It focue on the management and the capability for the maximum users and maximum resources on the Internet, as well as performan...This paper describes the architecture of global distributed storage system for data grid. It focue on the management and the capability for the maximum users and maximum resources on the Internet, as well as performance and other issues.展开更多
With the advent of the era of big data,cloud computing,Internet of things,and other information industries continue to develop.There is an increasing amount of unstructured data such as pictures,audio,and video on the...With the advent of the era of big data,cloud computing,Internet of things,and other information industries continue to develop.There is an increasing amount of unstructured data such as pictures,audio,and video on the Internet.And the distributed object storage system has become the mainstream cloud storage solution.With the increasing number of distributed applications,data security in the distributed object storage system has become the focus.For the distributed object storage system,traditional defenses are means that fix discovered system vulnerabilities and backdoors by patching,or means to modify the corresponding structure and upgrade.However,these two kinds of means are hysteretic and hardly deal with unknown security threats.Based on mimic defense theory,this paper constructs the principle framework of the distributed object storage system and introduces the dynamic redundancy and heterogeneous function in the distributed object storage system architecture,which increases the attack cost,and greatly improves the security and availability of data.展开更多
Distributed energy resources have been proven to be an effective and promising solution to enhance power system resilience and improve household-level reliability.In this paper,we propose a method to evaluate the reli...Distributed energy resources have been proven to be an effective and promising solution to enhance power system resilience and improve household-level reliability.In this paper,we propose a method to evaluate the reliability value of a photovoltaic(PV)energy system with a battery storage system(BSS)by considering the probability of grid outages causing household blackouts.Considering this reliability value,which is the economic profit and capital cost of PV+BSS,a simple formula is derived to calculate the optimal planning strategy.This strategy can provide household-level customers with a simple and straightforward expression for invested PV+BSS capacity.Case studies on 600 households located in eight zones of the US for the period of 2006 to 2015 demonstrate that adding the reliability value to economic profit allows households to invest in a larger PV+BSS and avoid loss of load caused by blackouts.Owing to the differences in blackout hours,households from the 8 zones express distinct willingness to install PV+BSS.The greater the probability of blackout,the greater revenue that household can get from the PV+BSS.The simulation example shows that the planning strategy obtained by proposed model has good economy in the actual operation and able to reduce the economic risk of power failure of the household users.This model can provide household with an easy and straightforward investment strategy of PV+BSS capacity.展开更多
In distributed cloud storage systems, inevitably there exist multiple node failures at the same time. The existing methods of regenerating codes, including minimum storage regenerating(MSR) codes and minimum bandwidth...In distributed cloud storage systems, inevitably there exist multiple node failures at the same time. The existing methods of regenerating codes, including minimum storage regenerating(MSR) codes and minimum bandwidth regenerating(MBR) codes, are mainly to repair one single or several failed nodes, unable to meet the repair need of distributed cloud storage systems. In this paper, we present locally minimum storage regenerating(LMSR) codes to recover multiple failed nodes at the same time. Specifically, the nodes in distributed cloud storage systems are divided into multiple local groups, and in each local group(4, 2) or(5, 3) MSR codes are constructed. Moreover, the grouping method of storage nodes and the repairing process of failed nodes in local groups are studied. Theoretical analysis shows that LMSR codes can achieve the same storage overhead as MSR codes. Furthermore, we verify by means of simulation that, compared with MSR codes, LMSR codes can reduce the repair bandwidth and disk I/O overhead effectively.展开更多
Based on the energy storage cloud platform architecture,this study considers the extensive configuration of energy storage devices and the future large-scale application of electric vehicles at the customer side to bu...Based on the energy storage cloud platform architecture,this study considers the extensive configuration of energy storage devices and the future large-scale application of electric vehicles at the customer side to build a new mode of smart power consumption with a flexible interaction,smooth the peak/valley difference of the load side power,and improve energy efficiency.A plug and play device for customer-side energy storage and an internet-based energy storage cloud platform are developed herein to build a new intelligent power consumption mode with a flexible interaction suitable for ordinary customers.Based on the load perception of the power grid,this study aims to investigate the operating state and service life of distributed energy storage devices.By selecting an integrated optimal control scheme,this study designs a kind of energy optimization and deployment strategy for stratified partition to reduce the operating cost of the energy storage device on the client side.The effectiveness of the system and the control strategy is verified through the Suzhou client-side distributed energy storage demonstration project.展开更多
Erasure code is widely used as the redundancy scheme in distributed storage system. When a storage node fails, the repair process often requires to transfer a large amount of data. Regenerating code and hierarchical c...Erasure code is widely used as the redundancy scheme in distributed storage system. When a storage node fails, the repair process often requires to transfer a large amount of data. Regenerating code and hierarchical code are two classes of codes proposed to reduce the repair bandwidth cost. Regenerating codes reduce the amount of data transferred by each helping node, while hierarchical codes reduce the number of nodes participating in the repair process. In this paper, we propose a "sub-code nesting framework" to combine them together. The resulting regenerating hierarchical code has low repair degree as hierarchical code and lower repair cost than hierarchical code. Our code can achieve exact regeneration of the failed node, and has the additional property of low updating complexity.展开更多
Remote data auditing becomes critical to ensure the storage reliability in distributed cloud storage.Recently,Le et al proposed an efficient private data auditing scheme NC-Audit designed for regenerating codes,which ...Remote data auditing becomes critical to ensure the storage reliability in distributed cloud storage.Recently,Le et al proposed an efficient private data auditing scheme NC-Audit designed for regenerating codes,which claimed that NC-Audit can effectively realize privacy-preserving data auditing for distributed storage systems.However,our analysis shows that NC-Audit is not secure for that the adversarial cloud can forge some illegal blocks to cheat the auditor successfully with a high probability even without storing the user’s whole data,when the coding field is large enough.展开更多
Distributed collaborative control strategies for microgrids often use periodic time to trigger communication,which is likely to enhance the burden of communication and increase the frequency of controller updates,lead...Distributed collaborative control strategies for microgrids often use periodic time to trigger communication,which is likely to enhance the burden of communication and increase the frequency of controller updates,leading to greater waste of communication resources.In response to this problem,a distributed cooperative control strategy triggered by an adaptive event is proposed.By introducing an adaptive event triggering mechanism in the distributed controller,the triggering parameters are dynamically adjusted so that the distributed controller can communicate only at a certain time,the communication pressure is reduced,and the DC bus voltage deviation is effectively reduced,at the same time,the accuracy of power distribution is improved.The MATLAB/Simulink modeling and simulation results prove the correctness and effectiveness of the proposed control strategy.展开更多
The penetration rate of distributed generation is gradually increasing in the distribution system concerned.This is creating new problems and challenges in the planning and operation of the system.The intermittency an...The penetration rate of distributed generation is gradually increasing in the distribution system concerned.This is creating new problems and challenges in the planning and operation of the system.The intermittency and variability of power outputs from numerous distributed renewable generators could significantly jeopardize the secure operation of the distribution system.Therefore,it is necessary to assess the hosting capability for intermittent distributed generation by a distribution system considering operational constraints.This is the subject of this study.An assessment model considering the uncertainty of generation outputs from distributed generators is presented for this purpose.It involves different types of regulation or control functions using on-load tap-changers(OLTCs),reactive power compensation devices,energy storage systems,and the reactive power support of the distributed generators employed.A robust optimization model is then attained It is solved by Bertsimas robust counterpart through GUROBI solver.Finally,the feasibility and efficiency of the proposed method are demonstrated by a modified IEEE 33-bus distribution system.In addition,the effects of the aforementioned regulation or control functions on the enhancement of the hosting capability for intermittent distributed generation are examined.展开更多
基金Supported in part by the National Key R&D Program of China(No.2020YFA0712300)NSFC(No.61872353)。
文摘Fraction repetition(FR)codes are integral in distributed storage systems(DSS)with exact repair-by-transfer,while pliable fraction repetition codes are vital for DSSs in which both the per-node storage and repetition degree can easily be adjusted simultaneously.This paper introduces a new type of pliable FR codes,called absolute balanced pliable FR(ABPFR)codes,in which the access balancing in DSS is considered.Additionally,the equivalence between pliable FR codes and resolvable transversal packings in combinatorial design theory is presented.Then constructions of pliable FR codes and ABPFR codes based on resolvable transversal packings are presented.
基金supported in part by the National Nat-ural Science Foundation of China(52177110)Key Pro-gram of the National Natural Science Foundation of China(U22B20106,U2142206)+2 种基金Shenzhen Science and Technology Program(JCYJ20210324131409026)the Science and Technology Project of the State Grid Corpo-ration of China(5200-202319382A-2-3-XG)State Grid Zhejiang Elctric Power Co.,Ltd.Science and Tech-nology Project(B311DS24001A).
文摘Typhoons can cause large-area blackouts or partial outages of distribution networks.We define a partial outage state in the distribution network as a gray state and propose a gray-start strategy and two-stage distribution network emergency recovery framework.A phase-space reconstruction and stacked integrated model for predicting wind and photovoltaic generation during typhoon disasters is proposed in the first stage.This provides guidance for second-stage post-disaster emergency recovery scheduling.The emergency recovery scheduling model is established in the second stage,and this model is supported by a thermal power-generating unit,mobile emergency generators,and distributed generators.Distributed generation includes wind power generation,photovoltaics,fuel cells,etc.Simultaneously,we con-sider the gray-start based on the pumped storage unit to be an important first step in the emergency recovery strategy.This model is val-idated on the improved IEEE 33 node system,which utilizes data from the 2022 super typhoon“Muifa”in Zhoushan,Zhejiang,China.Simulations indicate the superiority of a gray start with a pumped storage unit and the proposed emergency recovery strategy.
基金supported in part by the National Science Foundation of China(Grant.U24B6009)Beijing Natural Science Foundation(L243003).
文摘The volatility introduced by the integration of renewable energy poses challenges to the reliability of power supply,increasing the demand for energy storage in distribution networks.Shared energy storage in distribution networks can participate in energy storage allocation as a provider of reliability ancillary services.This paper proposes a novel Nash bargaining based energy storage coordinated allocation method to fully incentivize shared energy storage to participate in reliability services within the distribution network.First,an analytical reliability assessment model is constructed and embedded into the energy storage allocation model,where the impact of renewable energy uncertainty is described using chance constraints.Considering the interests of both the distribution network and shared energy storage operators,a Nash bargaining based energy storage coordinated allocation and benefit sharing mechanism is established,which is then transformed into a mixed-integer linear programming(MILP)model for efficient solution.Case studies show that the proposed method,through cooperation between the distribution system operator and shared energy storage operators,signif-icantly reduces investment cost of energy storage and ensures a rational distribution of the benefits obtained.
基金supported by the US Appalachian Regional Commission(ARC)under Grant MU-21579-23。
文摘Grid-scale energy storage systems provide effective solutions to address challenges such as supply-load imbalances and voltage violations resulting from the non-coinciding nature of renewable energy generation and peak demand incidents.While battery and hydrogen storage are commonly used for peak shaving,ice-based thermal energy storage systems(TESSs)offer a direct way to reduce cooling loads without electrical conversion.This paper presents a multi-objective planning framework that optimizes TESS dispatch,network topology,and photovoltaic(PV)inverter reactive power support to address operational issues in active distribution networks.The objectives of the proposed scheme include minimizing peak demand,voltage deviations,and PV inverter VAr dependency.The mixed-integer nonlinear programming problem is solved using a Pareto-based multi-objective particle swarm optimization(MOPSO)method.The MATLAB-OpenDSS simulations for a modified IEEE-123 bus system show a 7.1%reduction in peak demand,a 13%reduction in voltage deviation,and a 52%drop in PV inverter VAr usage.The obtained solutions confirm minimal operational stress on control devices such as switches and PV inverters.Thus,unlike earlier studies,this work combines all three strategies to offer an effective solution for the operational planning of the active distribution network.
文摘Distributed photovoltaic(PV)is one of the important power sources for building a new power system with new energy as the main body.The rapid development of distributed PV has brought new challenges to the operation of distribution networks.In order to improve the absorption ability of large-scale distributed PV access to the distribution network,the AC/DC hybrid distribution network is constructed based on flexible interconnection technology,and a coordinated scheduling strategy model of hydrogen energy storage(HS)and distributed PV is established.Firstly,the mathematical model of distributed PV and HS system is established,and a comprehensive energy storage system combining seasonal hydrogen energy storage(SHS)and battery(BT)is proposed.Then,a flexible interconnected distribution network scheduling optimization model is established to minimize the total active power loss,voltage deviation and system operating cost.Finally,simulation analysis is carried out on the improved IEEE33 node,the NSGA-II algorithm is used to solve specific examples,and the optimal scheduling results of the comprehensive economy and power quality of the distribution network are obtained.Compared with the method that does not consider HS and flexible interconnection technology,the network loss and voltage deviation of this method are lower,and the total system cost can be reduced by 3.55%,which verifies the effectiveness of the proposed method.
基金supported by the State Grid Corporation of China Science and Technology Project,grant number 52270723000900K.
文摘The new energy power generation is becoming increasingly important in the power system.Such as photovoltaic power generation has become a research hotspot,however,due to the characteristics of light radiation changes,photovoltaic power generation is unstable and random,resulting in a low utilization rate and directly affecting the stability of the power grid.To solve this problem,this paper proposes a coordinated control strategy for a newenergy power generation system with a hybrid energy storage unit based on the lithium iron phosphate-supercapacitor hybrid energy storage unit.Firstly,the variational mode decomposition algorithm is used to separate the high and low frequencies of the power signal,which is conducive to the rapid and accurate suppression of the power fluctuation of the energy storage system.Secondly,the fuzzy control algorithm is introduced to balance the power between energy storage.In this paper,the actual data is used for simulation,and the simulation results show that the strategy realizes the effective suppression of the bus voltage fluctuation and the accurate control of the internal state of the energy storage unit,effectively avoiding problems such as overshoot and over-discharge,and can significantly improve the stability of the photovoltaic power generation systemand the stability of the Direct Current bus.It is of great significance to promote the development of collaborative control technology for photovoltaic hybrid energy storage units.
基金supported by State Grid Anhui Electric Power Co.,Ltd.Research Program(B3120923000C).
文摘To adapt to the uncertainty of new energy,increase new energy consumption,and reduce carbon emissions,a high-voltage distribution network energy storage planning model based on robustness-oriented planning and distributed new energy consumption is proposed.Firstly,the spatio-temporal correlation of large-scale wind-photovoltaic energy is modeled based on the Vine Copula model,and the spatial correlation of the generated wind-photovoltaic power generation is corrected to get the spatio-temporal correlation of wind-photovoltaic power generation scenarios.Finally,considering the subsequent development of new energy on demand for high-voltage distribution network peaking margin and the economy of the system peaking,we propose the optimization model of high-voltage distribution network energy storage plant siting and capacity setting for source-storage cooperative peaking.The simulation results show that the proposed energy storage plant planning method can effectively alleviate the branch circuit blockage,promote new energy consumption,reduce the burden of the main grid peak shifting,and leave sufficient peak shifting margin for the subsequent development of a new energy distribution network while ensuring the economy.
文摘In high-renewable-energy power systems,the demand for fast-responding capabilities is growing.To address the limitations of conventional closed-loop frequency control,where the integral coefficient cannot dynamically adjust the frequency regulation command based on the state of charge(SoC)of energy storage units,this paper proposes a secondary frequency regulation control strategy based on variable integral coefficients for multiple energy storage units.First,a power-uniform controller is designed to ensure that thermal power units gradually take on more regulation power during the frequency regulation process.Next,a control framework based on variable integral coefficients is proposed within the secondary frequency regulation model,along with an objective function that simultaneously considers both Automatic Generation Control(AGC)command tracking performance and SoC recovery requirements of energy storage units.Finally,a gradient descent optimization method is used to dynamically adjust the gain of the energy storage integral controller,allowingmultiple energy storage units to respond in real-time to AGC instructions and SoC variations.Simulation results confirmthe effectiveness of the proposedmethod.Compared to traditional strategies,the proposed approach takes into account the SoCdiscrepancies amongmultiple energy storage units and the duration of system net power imbalances.It successfully implements secondary frequency regulation while achieving dynamic power allocation among the units.
基金support from the National Key Research and Development Program of China(2023YFE0120700)National Natural Science Foundation of China(52274041)Distinguished Young Sichuan Science Scholars(2023NSFSC1954).
文摘Cyclic injection holds great potential for CO_(2) emission reduction coupled with enhanced unconventional oil recovery.There is,however,a lack of a thorough understanding of carbon distribution,migration,and transformation underground over time at the reservoir scale.To address this issue,we conducted a rig-orous numerical simulation integrating microseismic events,multi-geomechanics,and multi-geochemistry to represent the complex fracture geometry,rock stress sensitivity,and CO_(2)-oil-brine-rock interactions.The fluid model,reservoir model,and geochemical reaction kinetics were carefully validated and calibrated using experimental data.The performance of CO_(2) utilization and geological storage was comprehensively investigated in terms of changes in oil production,CO_(2) storage,carbon distribution,and petrophysical properties.The results indicate that 48.3%of the injected CO_(2) was stored stably under-ground after ten cycles(ten years),with a 3.4%increase in oil recovery.The presence of multiple CO_(2) stor-age forms,such as dissolved in water and mineralized carbonate,impeded CO_(2)-oil interaction,leading to a 25.9%reduction in the volume of the CO_(2)-oil mixing zone and a 2.2%decrease in cumulative oil pro-duction,albeit with a 7.7%increase in the storage rate.The cyclic injection mode had a significant impact on the migration and transformation of CO_(2) in the reservoir.While dissolved CO_(2) in oil accounted for over half of the total storage,it had the possibility of being released during production.After ten cycles,20%of the injected CO_(2)(approximately 12000 t)reached long-term storage in four forms:mineralized carbon-ate(6%),water-dissolved CO_(2)(6%),aqueous ions(4%),and trapped gas(4%).Notably,the non-fracture zone within the stimulated reservoir volume(SRV)served as the primary trapping area for residual gas.This work provides valuable insights into dynamic CO_(2) transport and transformation processes under cyclic injection and presents a more comprehensive and precise framework for assessing CO_(2) capture,utilization,and storage with enhanced oil recovery(CCUS-EOR)performance in unconventional reser-voirs after fracturing.
基金supported by the National Grand Fundamental Research of China (973 Program) under Grant No. 2011CB302601the National High Technology Research and Development of China (863 Program) under GrantNo. 2013AA01A213+2 种基金the National Natural Science Foundation of China under Grant No. 60873215the Natural Science Foundation for Distinguished Young Scholars of Hunan Province under Grant No. S2010J5050Specialized Research Fund for the Doctoral Program of Higher Education under Grant No. 20124307110015
文摘To reduce the time required to complete the regeneration process of erasure codes, we propose a Tree-structured Parallel Regeneration (TPR) scheme for multiple data losses in distributed storage systems. Under the scheme, two algorithms are proposed for the construction of multiple regeneration trees, namely the edge-disjoint algorithm and edge-sharing algorithm. The edge-disjoint algorithm constructs multiple independent trees, and is simple and appropriate for environments where newcomers and their providers are distributed over a large area and have few intersections. The edge-sharing algorithm constructs multiple trees that compete to utilize the bandwidth, and make a better utilization of the bandwidth, although it needs to measure the available band-width and deal with the bandwidth changes; it is therefore difficult to implement in practical systems. The parallel regeneration for multiple data losses of TPR primarily includes two optimizations: firstly, transferring the data through the bandwidth optimized-paths in a pipe-line manner; secondly, executing data regeneration over multiple trees in parallel. To evaluate the proposal, we implement an event-based simulator and make a detailed comparison with some popular regeneration methods. The quantitative comparison results show that the use of TPR employing either the edge-disjoint algorithm or edge-sharing algorithm reduces the regeneration time significantly.
基金This work was supported by the National Natural Science Foundation of China under Grant 62072249,61772280,61772454,62072056.J.Wang and Y.Ren received the grants,and the URL of the sponsors’website is http://www.nsfc.gov.cn/This work was also supported by the Project of Transformation and Upgrading of Industries and Information Technologies of Jiangsu Province(No.JITC-1900AX2038/01).X.Yu received the grant,and the URL of the sponsors’website is http://gxt.jiangsu.gov.cn/.
文摘Distributed storage can store data in multiple devices or servers to improve data security.However,in today’s explosive growth of network data,traditional distributed storage scheme is faced with some severe challenges such as insufficient performance,data tampering,and data lose.A distributed storage scheme based on blockchain has been proposed to improve security and efficiency of traditional distributed storage.Under this scheme,the following improvements have been made in this paper.This paper first analyzes the problems faced by distributed storage.Then proposed to build a new distributed storage blockchain scheme with sharding blockchain.The proposed scheme realizes the partitioning of the network and nodes by means of blockchain sharding technology,which can improve the efficiency of data verification between nodes.In addition,this paper uses polynomial commitment to construct a new verifiable secret share scheme called PolyVSS.This new scheme is one of the foundations for building our improved distributed storage blockchain scheme.Compared with the previous scheme,our new scheme does not require a trusted third party and has some new features such as homomorphic and batch opening.The security of VSS can be further improved.Experimental comparisons show that the proposed scheme significantly reduces storage and communication costs.
文摘This paper describes the architecture of global distributed storage system for data grid. It focue on the management and the capability for the maximum users and maximum resources on the Internet, as well as performance and other issues.
基金National Keystone R&D Program of China(No.2017YFB0803204)Shenzhen Research Programs(JCYJ20170306092030521)+3 种基金the PCL Future Regional Network Facilities for Largescale Experiments and Applications(LZC0019)ZTE University Funding,Natural Science Foundation of China(NSFC)(No.61671001)GuangDong Prov.,R&D Key Program(No.2019B010137001)the Shenzhen Municipal Development and Reform Commission(Disciplinary Development Program for Data Science and Intelligent Computing).
文摘With the advent of the era of big data,cloud computing,Internet of things,and other information industries continue to develop.There is an increasing amount of unstructured data such as pictures,audio,and video on the Internet.And the distributed object storage system has become the mainstream cloud storage solution.With the increasing number of distributed applications,data security in the distributed object storage system has become the focus.For the distributed object storage system,traditional defenses are means that fix discovered system vulnerabilities and backdoors by patching,or means to modify the corresponding structure and upgrade.However,these two kinds of means are hysteretic and hardly deal with unknown security threats.Based on mimic defense theory,this paper constructs the principle framework of the distributed object storage system and introduces the dynamic redundancy and heterogeneous function in the distributed object storage system architecture,which increases the attack cost,and greatly improves the security and availability of data.
基金supported by National Natural Science Foundation of China(Project 51907064)in part by China State Key Lab.of Power System(SKLD19KM09)in part by State Grid Corporation of China(1400202024222A-0-0-00)
文摘Distributed energy resources have been proven to be an effective and promising solution to enhance power system resilience and improve household-level reliability.In this paper,we propose a method to evaluate the reliability value of a photovoltaic(PV)energy system with a battery storage system(BSS)by considering the probability of grid outages causing household blackouts.Considering this reliability value,which is the economic profit and capital cost of PV+BSS,a simple formula is derived to calculate the optimal planning strategy.This strategy can provide household-level customers with a simple and straightforward expression for invested PV+BSS capacity.Case studies on 600 households located in eight zones of the US for the period of 2006 to 2015 demonstrate that adding the reliability value to economic profit allows households to invest in a larger PV+BSS and avoid loss of load caused by blackouts.Owing to the differences in blackout hours,households from the 8 zones express distinct willingness to install PV+BSS.The greater the probability of blackout,the greater revenue that household can get from the PV+BSS.The simulation example shows that the planning strategy obtained by proposed model has good economy in the actual operation and able to reduce the economic risk of power failure of the household users.This model can provide household with an easy and straightforward investment strategy of PV+BSS capacity.
基金supported in part by the National Natural Science Foundation of China (61640006, 61572188)the Natural Science Foundation of Shaanxi Province, China (2015JM6307, 2016JQ6011)the project of science and technology of Xi’an City (2017088CG/RC051(CADX002))
文摘In distributed cloud storage systems, inevitably there exist multiple node failures at the same time. The existing methods of regenerating codes, including minimum storage regenerating(MSR) codes and minimum bandwidth regenerating(MBR) codes, are mainly to repair one single or several failed nodes, unable to meet the repair need of distributed cloud storage systems. In this paper, we present locally minimum storage regenerating(LMSR) codes to recover multiple failed nodes at the same time. Specifically, the nodes in distributed cloud storage systems are divided into multiple local groups, and in each local group(4, 2) or(5, 3) MSR codes are constructed. Moreover, the grouping method of storage nodes and the repairing process of failed nodes in local groups are studied. Theoretical analysis shows that LMSR codes can achieve the same storage overhead as MSR codes. Furthermore, we verify by means of simulation that, compared with MSR codes, LMSR codes can reduce the repair bandwidth and disk I/O overhead effectively.
基金supported by the State Grid Corporation of China Science and Technological Project(Research and demonstration application of key technology of energy storage cloud for mobile energy storage application of electric vehicles 5419-20197121 7a-0-0-00)
文摘Based on the energy storage cloud platform architecture,this study considers the extensive configuration of energy storage devices and the future large-scale application of electric vehicles at the customer side to build a new mode of smart power consumption with a flexible interaction,smooth the peak/valley difference of the load side power,and improve energy efficiency.A plug and play device for customer-side energy storage and an internet-based energy storage cloud platform are developed herein to build a new intelligent power consumption mode with a flexible interaction suitable for ordinary customers.Based on the load perception of the power grid,this study aims to investigate the operating state and service life of distributed energy storage devices.By selecting an integrated optimal control scheme,this study designs a kind of energy optimization and deployment strategy for stratified partition to reduce the operating cost of the energy storage device on the client side.The effectiveness of the system and the control strategy is verified through the Suzhou client-side distributed energy storage demonstration project.
基金Supported by 973 Project of China (No. 2012CB315803)Research Fund for the Doctoral Program of Higher Education of China (No. 20100002110033)Open research Fund of National Mobile Communications Research Laboratory, Southeast University (No. 2011D11)
文摘Erasure code is widely used as the redundancy scheme in distributed storage system. When a storage node fails, the repair process often requires to transfer a large amount of data. Regenerating code and hierarchical code are two classes of codes proposed to reduce the repair bandwidth cost. Regenerating codes reduce the amount of data transferred by each helping node, while hierarchical codes reduce the number of nodes participating in the repair process. In this paper, we propose a "sub-code nesting framework" to combine them together. The resulting regenerating hierarchical code has low repair degree as hierarchical code and lower repair cost than hierarchical code. Our code can achieve exact regeneration of the failed node, and has the additional property of low updating complexity.
基金Supported by the National Natural Science Foundation of China(61872088)the Science and Technology Plan Project of Xi’an(2020KJWL02,2017CGWL35)the China National Study Abroad Fund。
文摘Remote data auditing becomes critical to ensure the storage reliability in distributed cloud storage.Recently,Le et al proposed an efficient private data auditing scheme NC-Audit designed for regenerating codes,which claimed that NC-Audit can effectively realize privacy-preserving data auditing for distributed storage systems.However,our analysis shows that NC-Audit is not secure for that the adversarial cloud can forge some illegal blocks to cheat the auditor successfully with a high probability even without storing the user’s whole data,when the coding field is large enough.
基金funded by the Natural Science Foundation of Shaanxi Province,Grant No.2021GY-135the Scientific Research Project of Yan’an University,Grant No.YDQ2018-07.
文摘Distributed collaborative control strategies for microgrids often use periodic time to trigger communication,which is likely to enhance the burden of communication and increase the frequency of controller updates,leading to greater waste of communication resources.In response to this problem,a distributed cooperative control strategy triggered by an adaptive event is proposed.By introducing an adaptive event triggering mechanism in the distributed controller,the triggering parameters are dynamically adjusted so that the distributed controller can communicate only at a certain time,the communication pressure is reduced,and the DC bus voltage deviation is effectively reduced,at the same time,the accuracy of power distribution is improved.The MATLAB/Simulink modeling and simulation results prove the correctness and effectiveness of the proposed control strategy.
基金the Scientific and Technological Project of SGCC Headquarters entitled“Smart Distribution Network and Ubiquitous Power Internet of Things Integrated Development Collaborative Planning Technology Research”(5400-201956447A-0-0-00).
文摘The penetration rate of distributed generation is gradually increasing in the distribution system concerned.This is creating new problems and challenges in the planning and operation of the system.The intermittency and variability of power outputs from numerous distributed renewable generators could significantly jeopardize the secure operation of the distribution system.Therefore,it is necessary to assess the hosting capability for intermittent distributed generation by a distribution system considering operational constraints.This is the subject of this study.An assessment model considering the uncertainty of generation outputs from distributed generators is presented for this purpose.It involves different types of regulation or control functions using on-load tap-changers(OLTCs),reactive power compensation devices,energy storage systems,and the reactive power support of the distributed generators employed.A robust optimization model is then attained It is solved by Bertsimas robust counterpart through GUROBI solver.Finally,the feasibility and efficiency of the proposed method are demonstrated by a modified IEEE 33-bus distribution system.In addition,the effects of the aforementioned regulation or control functions on the enhancement of the hosting capability for intermittent distributed generation are examined.