期刊文献+
共找到1,849篇文章
< 1 2 93 >
每页显示 20 50 100
Settlement Control Standards of Construction and Expansion for Mountainous Highway Roadbeds 被引量:1
1
作者 Zhipan Yang Wei Gan Haonan Ding 《Journal of Architectural Research and Development》 2024年第2期43-49,共7页
This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade sett... This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade settlement control standard that states that the maximum differential settlement value should be less than 5 cm when the embankment fill height exceeds 20 m.Similarly,the maximum differential settlement value should be less than 10 cm when the embankment fill height does not exceed 20 m.The findings of the study can provide a useful reference for the design of roadbed widening in highway reconstruction and expansion projects. 展开更多
关键词 Mountainous highway Reconstruction and expansion Roadbed widening settlement control
在线阅读 下载PDF
Shallow Tunneling Method and Control Measure for Ground Surface Settlement 被引量:1
2
作者 Jinxiao Jia Xiong Zhou 《Journal of World Architecture》 2023年第3期46-52,共7页
In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes fo... In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes for ground settlement control of this project.Based on the example of a shallow tunneling project on Subway line 8,this paper analyzes and discusses the shallow tunneling method in detail and puts forward corresponding technical measures for ground settlement control. 展开更多
关键词 Shallow tunneling Ground surface settlement control Advance ductule
在线阅读 下载PDF
Settlement Control Technology of High Filled Soil-Rock Embankment in Alpine and High-Altitude Areas
3
作者 Guangxi Wu 《Journal of World Architecture》 2023年第4期75-81,共7页
China's infrastructure has gradually achieved large-scale development,and transportation construction has also shifted from east to west,transitioning from plains to mountainous areas.High-fill embankments of diff... China's infrastructure has gradually achieved large-scale development,and transportation construction has also shifted from east to west,transitioning from plains to mountainous areas.High-fill embankments of different sizes in mountainous areas are unavoidable,and the settlement of high-fill embankments is usually the most concerned issue in high-fill projects.According to the current research of highway projects,most of the high embankments in mountainous areas are soil-rock mixed embankments or rock-filled embankments,and their post-construction settlements are directly related to construction technology and the type of filler used.In this paper,the problems in the settlement control of earth-filled embankment and related factors are analyzed in detail.The settlement control technology of high-fill embankment in high-cold and high-altitude areas is also discussed,so as to ensure the overall quality of high-fill embankment. 展开更多
关键词 High-altitude and cold areas High soil-rock embankment settlement control technology
在线阅读 下载PDF
Analysis of Control Measures for Settlement of Differences on the Problems of Highway Subgrade Widening
4
作者 Yuyan Wang 《Open Journal of Civil Engineering》 2015年第2期149-153,共5页
The study mainly discusses the issues of the settlement of differences that occurs in the process of highway subgrade widening. Firstly, it briefly introduces the settlement of difference and its harms;then it analyze... The study mainly discusses the issues of the settlement of differences that occurs in the process of highway subgrade widening. Firstly, it briefly introduces the settlement of difference and its harms;then it analyzes the mechanism of settlement of differences in the process of difference widening, including four aspects: the new and old roadbeds themselves, design, construction and other links;finally, based on the above analysis of the mechanism, it discusses the corresponding control measures, mainly proposing these suggestions as followings: the use of lightweight materials, the foundation treatment, the cut slope excavation steps, and the strict control of the degree of compaction, etc. The paper is expected to provide some theoretical basis for the control measures of highway subgrade widening settlement of difference. 展开更多
关键词 Road WIDENING settlement of DIFFERENCE Mechanism control MEASURE
暂未订购
项目施工成本管控与结算评审审减风险控制浅谈 被引量:1
5
作者 李瑞平 《价值工程》 2026年第2期28-30,共3页
本文围绕建设施工项目的施工成本在招投标、分包合同签约及履行、结算等整个施工阶段的控制,同时针对结算评审审减风险的降低,以结算审核为导向,简述竣工结算应对结算评审在施工阶段应做的准备工作,最终形成“有说服力”的项目结算,减... 本文围绕建设施工项目的施工成本在招投标、分包合同签约及履行、结算等整个施工阶段的控制,同时针对结算评审审减风险的降低,以结算审核为导向,简述竣工结算应对结算评审在施工阶段应做的准备工作,最终形成“有说服力”的项目结算,减少结算审减,提高项目利润率。为项目管理者提供理论支持和实操指导。 展开更多
关键词 施工成本管控 结算评审 施工阶段 审减风险
在线阅读 下载PDF
TBM隧道近接下穿运营高铁隧道模型试验研究
6
作者 董宇 童孝红 +1 位作者 杜威 谢强 《路基工程》 2026年第1期218-223,共6页
依托温州市瓯江引水工程TBM隧道下穿高速铁路隧道,采用模型试验与现场监测相结合的方法,探究新建隧道下穿对既有隧道产生的沉降影响。研究表明:模型试验既有隧道沉降最终为1.92mm,满足控制标准;既有隧道沉降呈凹槽型分布,随着既有隧道... 依托温州市瓯江引水工程TBM隧道下穿高速铁路隧道,采用模型试验与现场监测相结合的方法,探究新建隧道下穿对既有隧道产生的沉降影响。研究表明:模型试验既有隧道沉降最终为1.92mm,满足控制标准;既有隧道沉降呈凹槽型分布,随着既有隧道轴线方向距离增加,既有隧道拱顶沉降逐渐减小;随着穿越间距的增加,新建隧道下穿对既有隧道的沉降影响逐渐减小;现场监测穿越过程中,既有隧道出现隆起现象,而后随着穿越的进行发生沉降;既有隧道先开挖一侧产生沉降略大于后开挖一侧,且最大沉降位置沿轴线方向移动。 展开更多
关键词 引水隧道 TBM下穿 监控量测 变形规律 沉降控制
在线阅读 下载PDF
深厚软弱地层强夯与CFG桩地基处理多向对比分析
7
作者 严义招 梁杨 +1 位作者 杨渊 杨泉 《路基工程》 2026年第1期160-165,共6页
强夯法具有施工便捷、成本低等特点,适合软弱地基的加固。采用数值仿真对8000kN·m高能级强夯加固地基的效果进行模拟,并现场钻孔取样对比,数值模拟结果与现场数据拟合良好,模拟结果可靠。计算分析表明:7次8000kN·m强夯加固人... 强夯法具有施工便捷、成本低等特点,适合软弱地基的加固。采用数值仿真对8000kN·m高能级强夯加固地基的效果进行模拟,并现场钻孔取样对比,数值模拟结果与现场数据拟合良好,模拟结果可靠。计算分析表明:7次8000kN·m强夯加固人工弃土层的有效加固深度为11.5m,模量由4MPa提升至44MPa,加固效果良好;相比未加固地层,强夯加固与CFG桩加固地基工后沉降分别减小65.0%、75.0%,效果均较好,满足变形控制要求;相比CFG桩,强夯法施工更加便利,采用强夯加固工程成本仅为CFG桩62.9%,可替代CFG桩进行本工点加固方案。 展开更多
关键词 铁路车站 复合地基 强夯 方案优化 沉降控制 经济性
在线阅读 下载PDF
Study on the Evolution of Rural Settlement Landscapes on Guanzhong Plain of China 被引量:1
8
作者 王琼 乔征 王葆华 《Journal of Landscape Research》 2012年第1期35-38,41,共5页
Overall figures of rural settlement landscapes on Guanzhong Plain were summarized,material components of these landscapes were classified into living landscape facilities and production landscape facilities,and then i... Overall figures of rural settlement landscapes on Guanzhong Plain were summarized,material components of these landscapes were classified into living landscape facilities and production landscape facilities,and then introduced respectively.From the perspective of rural central landscapes,rural yard landscapes,rural cluster landscapes and rural road landscapes,evolution of rural landscape spatial forms on Guanzhong Plain was analyzed.Moreover,problems of present rural landscapes were proposed,necessity and urgency of controlling evolution of rural settlement landscapes were stressed,and a rural landscape control mode in view of regional characteristics of Guanzhong Plain was given. 展开更多
关键词 RURAL settlement RURAL LANDSCAPE EVOLUTION control STRATEGY
在线阅读 下载PDF
基于双重预顶撑的PBA法密贴下穿既有车站施工技术
9
作者 刘佳杰 冀大亨 +1 位作者 马海燕 高琨 《工程建设》 2026年第2期66-72,共7页
为了有效解决密贴下穿既有车站施工中既有车站结构受扰及沉降控制难题,本文通过针对基于双重预顶撑的PBA法展开系统研究,重点分析其在初期支护中增设千斤顶和丝杠构建双重预顶撑体系实施路径及作用机制。结果表明:相较于传统暗挖工艺,... 为了有效解决密贴下穿既有车站施工中既有车站结构受扰及沉降控制难题,本文通过针对基于双重预顶撑的PBA法展开系统研究,重点分析其在初期支护中增设千斤顶和丝杠构建双重预顶撑体系实施路径及作用机制。结果表明:相较于传统暗挖工艺,基于双重预顶撑的PBA施工技术能够显著降低施工对既有车站的扰动影响,有效控制沉降变形,并为施工全过程的安全可控提供了关键保障;同时,该技术通过双重预顶撑体系的应用,进一步提升了暗挖结构的整体稳定性。本文成果可为类似复杂工程实践提供借鉴与参考。 展开更多
关键词 PBA施工技术 双重预顶撑 密贴下穿 既有车站 沉降控制
原文传递
地基沉降控制与基础加固技术在建筑施工中的协同应用
10
作者 霍艳艳 王晓明 《中国厨卫》 2026年第2期142-144,共3页
文章聚焦于地基沉降控制与基础加固技术在建筑施工中的协同应用,系统分析了沉降机制与影响因素,梳理了常见控制技术与加固工艺,探讨了两者在实际工程中的集成路径与耦合策略。通过典型工程案例分析,文章总结了多技术协同应用在复杂工况... 文章聚焦于地基沉降控制与基础加固技术在建筑施工中的协同应用,系统分析了沉降机制与影响因素,梳理了常见控制技术与加固工艺,探讨了两者在实际工程中的集成路径与耦合策略。通过典型工程案例分析,文章总结了多技术协同应用在复杂工况下的有效性与可行性,同时提出了优化建议与未来发展方向。 展开更多
关键词 地基沉降 基础加固 协同控制 沉降机制
在线阅读 下载PDF
复杂地质条件下地铁盾构施工关键技术与风险控制研究
11
作者 卢贺 《山西建筑》 2026年第3期153-156,170,共5页
基于绍兴市轨道交通1号线玉山路站—阳和路站区间工程,系统研究了在复杂地质条件下盾构始发、掘进及接收施工的关键技术。通过对地层结构、水文条件及相邻构筑物风险的系统分析,提出了端头加固、洞门破除防控、承压水层处治及岩溶加固... 基于绍兴市轨道交通1号线玉山路站—阳和路站区间工程,系统研究了在复杂地质条件下盾构始发、掘进及接收施工的关键技术。通过对地层结构、水文条件及相邻构筑物风险的系统分析,提出了端头加固、洞门破除防控、承压水层处治及岩溶加固等综合技术措施。结果表明,该方案有效控制了地层变形和地表沉降,保障了施工安全与质量。 展开更多
关键词 盾构施工 复杂地质 端头加固 风险控制 沉降监测
在线阅读 下载PDF
水电站工程建设投资数字化管控系统研发与应用
12
作者 李锦成 何展国 +2 位作者 岳智猛 黄成家 林瀚文 《水电与新能源》 2026年第1期84-87,92,共5页
为应对水电站工程建设投资管控过程中结算计划数据整合困难、节点签证与工程进度实时联动难度大等难点和挑战,遵从全流程、电子化、协同化的思路,分析投资管控过程中的结算计划、节点签证、结算付款到投资对比的全链条业务,研发数字化... 为应对水电站工程建设投资管控过程中结算计划数据整合困难、节点签证与工程进度实时联动难度大等难点和挑战,遵从全流程、电子化、协同化的思路,分析投资管控过程中的结算计划、节点签证、结算付款到投资对比的全链条业务,研发数字化管控系统并应用于实际工程,有效地提升了工程投资管控效率,可推广于行业内类似工程。 展开更多
关键词 工程数字化 水电站建设 投资管控 结算管理
在线阅读 下载PDF
BIM技术在道路桥梁沉降段路基施工精度控制及沉降预测中的实践
13
作者 仲崇锋 《智能建筑与智慧城市》 2026年第2期82-84,共3页
文章针对道路桥梁沉降段路基施工精度难把控、沉降预测滞后的问题,结合沉降段地质复杂、沉降影响因素多的特性,分析BIM技术与施工精度控制、沉降预测的适配逻辑,详解模型构建、施工管控、预测建模的实践要点,旨在通过BIM实现沉降段施工... 文章针对道路桥梁沉降段路基施工精度难把控、沉降预测滞后的问题,结合沉降段地质复杂、沉降影响因素多的特性,分析BIM技术与施工精度控制、沉降预测的适配逻辑,详解模型构建、施工管控、预测建模的实践要点,旨在通过BIM实现沉降段施工精准管控与沉降提前预判,保障路基稳定,为道路桥梁工程高质量建设提供技术支撑。 展开更多
关键词 BIM技术 道路桥梁 沉降段路基 施工精度控制 沉降预测
在线阅读 下载PDF
运营铁路下大断面箱涵顶进施工变形机理与控制技术研究
14
作者 陈天艳 姜艳红 《市政技术》 2026年第1期202-211,共10页
针对大断面箱涵顶进施工中既有铁路轨道沉降大、变形控制困难的问题,提出了一种基于纵横梁加固体系与分阶段线路整修、注浆加固技术的轨道沉降控制技术。依托北京市某城市道路下穿京哈铁路工程,通过开展全过程现场监测与数值模拟研究,... 针对大断面箱涵顶进施工中既有铁路轨道沉降大、变形控制困难的问题,提出了一种基于纵横梁加固体系与分阶段线路整修、注浆加固技术的轨道沉降控制技术。依托北京市某城市道路下穿京哈铁路工程,通过开展全过程现场监测与数值模拟研究,系统地揭示了不同施工阶段在列车荷载作用下,轨道、纵横梁、桩基协同受力的“M”形弯矩分布与“W”形纵向沉降演化特征,并阐明了受力体系转换的关键时段与峰值沉降触发机制。通过实施2次线路整修与2次注浆加固,顶进阶段产生的101.2 mm沉降峰值得以快速回落并稳定至≤1.8 mm,实现了铁路限速条件下的安全可控运营。该研究提出的基于监测反馈的动态加固与整修技术体系,验证了多阶段沉降控制措施的可行性,为类似下穿铁路工程提供了新的技术路径与设计参考依据。 展开更多
关键词 下穿铁路工程 箱涵顶进 大断面 变形控制 沉降监测 数值模拟
在线阅读 下载PDF
AI Agent赋能下财务共享服务中心的风险控制与资金结算运营效率研究
15
作者 刘飞扬 冯鹏蒴 +1 位作者 汤玥 王亚丽 《商业观察》 2026年第3期131-134,共4页
AI Agent技术凭借环境感知、自主决策与协同执行能力,为财务共享服务中心的智能化升级提供了新型技术方案。财务共享中心作为集约化财务管理载体,在业务规模扩张与数据量激增的背景下,面临着风险识别滞后与资金结算效率不足等挑战,AI Ag... AI Agent技术凭借环境感知、自主决策与协同执行能力,为财务共享服务中心的智能化升级提供了新型技术方案。财务共享中心作为集约化财务管理载体,在业务规模扩张与数据量激增的背景下,面临着风险识别滞后与资金结算效率不足等挑战,AI Agent通过构建智能识别预警系统、动态评估管控体系、自动化应急处置机制及全程追踪管理框架,实现了交易异常、信用风险、资金异常与合规风险的精准防控。 展开更多
关键词 AI Agent 财务共享服务中心 风险控制 资金结算 智能化运营
在线阅读 下载PDF
地铁隧道穿越既有地铁线微沉降控制技术应用研究
16
作者 米军红 《建筑机械》 2026年第1期246-249,共4页
地铁隧道建设中沉降量控制不当会导致结构体变形,危及结构安稳与运营安全。文章针对地铁隧道穿越工程微沉降控制技术进行深入探究,分析其技术原理,从施工前预处理、施工阶段参数优化及应急问题处理等方面制定具体的优化策略。通过系统... 地铁隧道建设中沉降量控制不当会导致结构体变形,危及结构安稳与运营安全。文章针对地铁隧道穿越工程微沉降控制技术进行深入探究,分析其技术原理,从施工前预处理、施工阶段参数优化及应急问题处理等方面制定具体的优化策略。通过系统化的技术应用,将隧道沉降严格控制在安全范围内,保障了新建隧道顺利掘进及既有线路稳定运营。 展开更多
关键词 地铁隧道 下穿施工 沉降控制
在线阅读 下载PDF
大断面矩形顶管施工控制技术
17
作者 田冰雨 《中国厨卫》 2026年第1期93-96,共4页
针对高密度城区地下通道建设,文章旨在通过大断面矩形顶管施工全过程精准控制技术,解决传统明挖法引发的交通中断、管线破坏及地层扰动问题。该技术采用土压平衡式顶管机结合工厂化预制管节的方式,通过端头高压旋喷桩加固、动态土仓压... 针对高密度城区地下通道建设,文章旨在通过大断面矩形顶管施工全过程精准控制技术,解决传统明挖法引发的交通中断、管线破坏及地层扰动问题。该技术采用土压平衡式顶管机结合工厂化预制管节的方式,通过端头高压旋喷桩加固、动态土仓压力调控、轴线实时纠偏及同步触变泥浆注浆等核心工艺,实现覆土3.3~11.0 m复杂地层中总长328.1 m的双通道精准顶进。结果表明,该技术成功穿越既有地铁隧道(最小净距7.75 m),地表沉降控制在±10 mm内,工期较盾构法缩短35%,总投资降低21%,废浆排放减少62%,为城市地下空间绿色建造提供了高效解决方案。 展开更多
关键词 大断面矩形顶管 施工控制技术 非开挖施工 沉降控制
在线阅读 下载PDF
智能技术在铁路路基填筑质量及沉降控制中的应用研究
18
作者 王玮 《价值工程》 2026年第1期114-117,共4页
在铁路建设规模持续拓展、质量标准持续提升的背景下传统以人工为主导的路基填筑质量管控与沉降监测方法已然无法符合需求。本文首先探究智能技术在助力铁路工程智能化转变方面的应用意义,其次结合某铁路路基工程系统整理工程实践中监... 在铁路建设规模持续拓展、质量标准持续提升的背景下传统以人工为主导的路基填筑质量管控与沉降监测方法已然无法符合需求。本文首先探究智能技术在助力铁路工程智能化转变方面的应用意义,其次结合某铁路路基工程系统整理工程实践中监测数据分散且孤立、智能设备对环境适应性欠佳、设备操作复杂且脱离一线需求、填筑过程与沉降控制相互脱节等难题,最后提出了智能化技术的应用策略,实现了填筑过程实时监管、沉降趋势的智能预判。 展开更多
关键词 智能技术 铁路路基 填筑质量 沉降控制
在线阅读 下载PDF
既有建筑加装电梯井道基础机械结构设计研究
19
作者 谢静 刘奇 《机械管理开发》 2026年第2期111-113,共3页
针对既有建筑加装电梯井道中差异沉降难以控制和抗震性能不足的问题,研究提出基于荷载传递路径重构与梯度截面支撑优化的井道基础机械结构,并通过高聚物隔离层和动态监测系统实现结构受力协同优化。实验表明,研究结构的成本稳定在100万... 针对既有建筑加装电梯井道中差异沉降难以控制和抗震性能不足的问题,研究提出基于荷载传递路径重构与梯度截面支撑优化的井道基础机械结构,并通过高聚物隔离层和动态监测系统实现结构受力协同优化。实验表明,研究结构的成本稳定在100万元~118万元之间,维护成本维持20万元~25万元区间;差异沉降控制精度最高达到4.2 mm,节点损伤指数最低为0.56,整体性能优于传统井道基础结构。研究提出的加装电梯井道基础机械结构能够提升井道安全性和全生命周期经济性,为既有建筑功能改造提供切实可行的技术路径。 展开更多
关键词 加装电梯 沉降控制 抗震强化 梯度截面支撑
在线阅读 下载PDF
地铁车辆基地和停车场大库结构设计重难点研究
20
作者 董晓鹏 《铁道勘察》 2026年第1期150-155,共6页
针对地铁车辆基地与停车场大库结构设计,分别从联合检修库及物资总库主体结构选型、运用库悬挂式起重机振动分析与优化、库区二次吊挂免焊节点设计和库区沉降控制4个方面,分析地铁车辆基地与停车场大库结构设计的重难点。研究表明,相较... 针对地铁车辆基地与停车场大库结构设计,分别从联合检修库及物资总库主体结构选型、运用库悬挂式起重机振动分析与优化、库区二次吊挂免焊节点设计和库区沉降控制4个方面,分析地铁车辆基地与停车场大库结构设计的重难点。研究表明,相较于“排架柱+钢网架、排架柱+钢桁架”两种结构形式,门式刚架结构形式具有对二次吊挂荷载不敏感、施工难度小和施工周期短的优势,尽管用钢量多3~5 kg/m^(2),但仍可作为联合检修库及物资总库结构方案的首选;悬挂式起重机附加振动位移和振动加速度分别是牛腿支撑式起重机的20倍和2.7倍,应慎重选择,以避免产生振动危害;为了避免二次吊挂焊接或开孔施工对大库主体结构的安全产生不利影响,建议采用抱箍节点等免焊接连接方式;针对大库内不同基础类型的沉降控制要求,建议采用复合地基处理措施,以确保地基方案的经济性和合理性。 展开更多
关键词 地铁 车辆基地 结构选型 起重机振动 二次吊挂 沉降控制
在线阅读 下载PDF
上一页 1 2 93 下一页 到第
使用帮助 返回顶部