The main cable is the primary load-bearing component of a suspension bridge,continuously exposed to harsh environmental conditions,such as wind and rain,throughout the year.These adverse conditions contribute to varyi...The main cable is the primary load-bearing component of a suspension bridge,continuously exposed to harsh environmental conditions,such as wind and rain,throughout the year.These adverse conditions contribute to varying degrees of degradation and damage to the main cable,necessitating regular inspections to prevent catastrophic failures.Traditional manual inspection methods not only suffer from low efficiency but also pose significant safety risks to personnel.To address these challenges and ensure the safe and effective inspection of suspension bridge main cables,this study introduces a novel cooperative climbing robot,designated as Main Cable Robot Version II(CCRobot-M-II),inspired by the locomotion of the inchworm.The robot employs an alternating opening and closing mechanism of four gripper sets,mimicking the inchworm's movement to achieve efficient crawling along the suspension bridge handrails.This paper provides a comprehensive analysis of the structural design,key components,and motion mechanisms of CCRobot-M-II.A detailed force analysis of the robot's crawling process is also presented,followed by the design of the control system and the development of an efficient motion control algorithm.Laboratory experiments demonstrate that the robot achieves a positional error of 00.64%during crawling,with a maximum average crawling speed of 7.6 m/min.Furthermore,the biomimetic design enables the robot to overcome obstacles up to 30 mm in height and possess the capability to handle suspension bridge cables with spans ranging from 740 to 1100 mm.Finally,CCRobot-M-II successfully conducted an inspection of the main cable on a suspension bridge,marking the world's first successful deployment of a climbing robot for main cable inspection on a suspension bridge.展开更多
This article discusses the design strategy of complex mountain highway bridges.During the research phase,details were obtained based on prior literature review and analysis of engineering materials from mountainous ar...This article discusses the design strategy of complex mountain highway bridges.During the research phase,details were obtained based on prior literature review and analysis of engineering materials from mountainous area bridges.After analyzing the design characteristics of complex mountainous area road and bridge projects,the principles for the design of bridges on complex mountainous area expressways were proposed.The research on bridge design was carried out from five dimensions:bridge type selection,foundation design,superstructure design,connection part design,and material and technological innovation.Eventually,a relatively complete design system was formed.It is expected that this paper can provide technical references and value for road and bridge projects in China and promote the sustainable development of China’s road traffic system from a macro perspective.展开更多
BIM technology has become an important tool in road and bridge design.Through the application of BIM technology,the entire bridge process can be modeled to form a virtual bridge form.Through the simulation of bridge c...BIM technology has become an important tool in road and bridge design.Through the application of BIM technology,the entire bridge process can be modeled to form a virtual bridge form.Through the simulation of bridge construction materials,construction techniques,and construction processes,a comprehensive analysis can be conducted to achieve visualization of the design and improve the efficiency of bridge design.This article mainly analyzes the advantages of BIM technology in bridge design,explores the application forms in bridge design,and proposes strategies to optimize bridge design,providing a certain reference for the improvement and optimization of bridge design work.展开更多
An investigation of girder bridges on National Highway 213 and the Doujiangyan-Wenchuan expressway after the Wenchuan earthquake showed that typical types of damage included: span collapses due to unseating at expans...An investigation of girder bridges on National Highway 213 and the Doujiangyan-Wenchuan expressway after the Wenchuan earthquake showed that typical types of damage included: span collapses due to unseating at expansion joints; shear key failure; and damage of the expansion joint due to the slide-induced large relative displacement between the bottom of the girder and the top of the laminated-rubber bearing. This slide, however, can actually act as a form of isolation for the substructure, and as a result, the piers and foundation of most of the bridges on state route 213 suffered minor damage. The exception was the Baihua Bridge, which suffered severe damage. Corresponding seismic design recommendations are presented based on this investigation.展开更多
Purpose–The bridge expansion joint(BEJ)is a key device for accommodating spatial displacement at the beam end,and for providing vertical support for running trains passing over the gap between the main bridge and the...Purpose–The bridge expansion joint(BEJ)is a key device for accommodating spatial displacement at the beam end,and for providing vertical support for running trains passing over the gap between the main bridge and the approach bridge.For long-span railway bridges,it must also be coordinated with rail expansion joint(REJ),which is necessary to accommodate the expansion and contraction of,and reducing longitudinal stress in,the rails.The main aim of this study is to present analysis of recent developments in the research and application of BEJs in high-speed railway(HSR)long-span bridges in China,and to propose a performance-based integral design method for BEJs used with REJs,from both theoretical and engineering perspectives.Design/methodology/approach–The study first presents a summary on the application and maintenance of BEJs in HSR long-span bridges in China representing an overview of their state of development.Results of a survey of typical BEJ faults were analyzed,and field testing was conducted on a railway cable-stayed bridge in order to obtain information on the major mechanical characteristics of its BEJ under train load.Based on the above,a performance-based integral design method for BEJs with maximum expansion range 1600 mm(±800 mm),was proposed,covering all stages from overall conceptual design to consideration of detailed structural design issues.The performance of the novel BEJ design thus derived was then verified via theoretical analysis under different scenarios,full-scale model testing,and field testing and commissioning.Findings–Two major types of BEJs,deck-type and through-type,are used in HSR long-span bridges in China.Typical BEJ faults were found to mainly include skewness of steel sleepers at the bridge gap,abnormally large longitudinal frictional resistance,and flexural deformation of the scissor mechanisms.These faults influence BEJ functioning,and thus adversely affect track quality and train running performance at the beam end.Due to their simple and integral structure,deck-type BEJs with expansion range 1200 mm(±600 mm)or less have been favored as a solution offering improved operational conditions,and have emerged as a standard design.However,when the expansion range exceeds the above-mentioned value,special design work becomes necessary.Therefore,based on engineering practice,a performance-based integral design method for BEJs used with REJs was proposed,taking into account four major categories of performance requirements,i.e.,mechanical characteristics,train running quality,durability and insulation performance.Overall BEJ design must mainly consider component strength and the overall stiffness of BEJ;the latter factor in particular has a decisive influence on train running performance at the beam end.Detailed BEJ structural design must stress minimization of the frictional resistance of its sliding surface.The static and dynamic performance of the newlydesigned BEJ with expansion range 1600 mm have been confirmed to be satisfactory,via numerical simulation,full-scale model testing,and field testing and commissioning.Originality/value–This research provides a broad overview of the status of BEJs with large expansion range in HSR long-span bridges in China,along with novel insights into their design.展开更多
In the U.S., the current Load and Resistance Factor Design (LRFD) Specifications for highway bridges is a reliability-based formulation that considers failure probabilities of bridge components due to the actions of...In the U.S., the current Load and Resistance Factor Design (LRFD) Specifications for highway bridges is a reliability-based formulation that considers failure probabilities of bridge components due to the actions of typical dead load and frequent vehicular loads. Various extreme load effects, such as earthquake and vessel collision, are on the same reliability-based platform. Since these extreme loads are time variables, combining them with not considered frequent. non- extreme loads is a significant challenge. The number of design limit state equations based on these failure probabilities can be unrealistically large and unnecessary from the view point of practical applications. Based on the opinion of AASHTO State Bridge Engineers, many load combinations are insignificant in their states. This paper describes the formulation of a criterion to include only the necessary load combinations to establish the design limit states. This criterion is established by examining the total failure probabilities for all possible time-invariant and time varying load combinations and breaking them down into partial terms. Then, important load combinations can be readily determined quantitatively,展开更多
The Federal Highway Administration (FHWA) sponsored a large,multi-year project conducted by the Multidisciplinary Center for Earthquake Engineering Research (MCEER) titled'Seismic Vulnerability of New Highway Cons...The Federal Highway Administration (FHWA) sponsored a large,multi-year project conducted by the Multidisciplinary Center for Earthquake Engineering Research (MCEER) titled'Seismic Vulnerability of New Highway Construction'(MCEER Project 112),which was completed in 1998.MCEER coordinated the work of many researchers,who performed studies on the seismic design and vulnerability analysis of highway bridges,tunnels,and retaining structures. Extensive research was conducted to provide revisions and improvements to current design and detailing approaches and national design specifications for highway bridges.The program included both analytical and experimental studies,and addressed seismic hazard exposure and ground motion input for the U.S.highway system;foundation design and soil behavior: structural importance,analysis,and response:structural design issues and details;and structural design criteria.展开更多
This paper reviews the use of fiber-reinforced polymers (FRPs) in architectural and structural bridge design in the Netherlands. The challenges and opportunities of this relatively new material, both for the archite...This paper reviews the use of fiber-reinforced polymers (FRPs) in architectural and structural bridge design in the Netherlands. The challenges and opportunities of this relatively new material, both for the architect and the engineer, are discussed. An inventory of recent structural solutions in FRP is included, followed by a discussion on architectural FRP applications derived from the architectural practice of the author and of other pioneers.展开更多
This paper presents the first of a series of case studies on the seismic design of long span bridges (cable-stayed bridges, suspension bridges and arch bridges) under a cooperative research project on seismic behavi...This paper presents the first of a series of case studies on the seismic design of long span bridges (cable-stayed bridges, suspension bridges and arch bridges) under a cooperative research project on seismic behavior and design of highway bridges between the State Key Laboratory for Disaster Reduction in Civil Engineering, Tongji University and the Multidisciplinary Center for Earthquake Engineering Research, University at Buffalo. The objective of this series of case studies is to examine the differences and similarities on the seismic design practice of long span bridges in China and the U.S., to identify research needs and to develop design guidelines beneficial to bridge engineers in both countries. Unlike short to medium span bridges, long span bridges are not included in most seismic design specifications, mainly because they are location dependent and structurally unique. In this paper, an available model of a steel tied half through arch bridge with a main span of 550m in China is discussed. Analysis is focused on comparisons of the seismic responses due to different ground motions. Seismic design criteria and seismic performance requirements for long span bridges in both countries were first introduced and compared, and then three near field earthquake records with large vertical components were selected as the excitations to examine the seismic behavior and seismic vulnerability of the bridge. Results show that (1) the selected near field ground motions cause larger responses to key components (critical sections) of the bridge (such as arch rib ends) with a maximum increase of more than twice those caused by the site specific ground motions; (2) piers, longitudinal girders and arch crowns are more vulnerable to vertical motions, especially their axial forces; and (3) large vertical components of near field ground motions may not significantly affect the bridge's internal forces provided that their peak acceleration spectra ordinates only appear at periods of less than 0.2s. However, they may have more influence on the longitudinal displacements of sliding bearings due to their large displacement spectra ordinates at the fundamental period of the bridge.展开更多
The aseismic design of cable-stayed bridges in the transverse direction with newly proposed metallic dampers that can accommodate both longitudinal and transverse movement of the deck has recently been considered.This...The aseismic design of cable-stayed bridges in the transverse direction with newly proposed metallic dampers that can accommodate both longitudinal and transverse movement of the deck has recently been considered.This work focuses on developing a simplified method to design an appropriate metallic damper.The seismic performance of cablestayed bridges with different damper stiffness,main span lengths,tower shapes and types of deck in the transverse direction are investigated.The transverse displacement of the deck of a cable-stayed bridge increases significantly with the increment of the damper stiffness,which proves that the design of the damper stiffness is crucial.A simplified model considering the damper stiffness,cable system and tower in the transverse direction is developed to evaluate the period and lateral displacement of a complicated cable-stayed bridge.Based on the simplified model,a design method is proposed and assessed using two cable-stayed bridges as examples.The results show that metallic dampers can be designed with high efficiency,and the optimal ductility of the damper can be selected.展开更多
This paper presents the Location,the structural design as well as the anti-corrosion and the pilot programs of the marine exposure station of Zhoushan Archipelago seas sea-crossing bridges. Subjected to the marine env...This paper presents the Location,the structural design as well as the anti-corrosion and the pilot programs of the marine exposure station of Zhoushan Archipelago seas sea-crossing bridges. Subjected to the marine environment,the concrete structures in serve with different mixing proportions,cover thickness,additional anti-corrosion measures such as rust-preventing agent,coating,penetration crystalline waterproof material,silicone and permeable fabric were studied. Those results obtained provide important information for the maintenance of marine concrete and the structural design of sea-crossing bridges in the above sea area.展开更多
Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure...Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure,mechanical characteristics and transmission routes of deck loads.The simplified calculation models were brought out for the stud design of the longitudinal girders and transverse girders in the composite floor system of Nanjing Dashengguan Yangtze River Bridge (NDB).Studs were designed and arranged by taking the middle panel of 336 m main span for example.The results show that under deck loads,the longitudinal girders in the composite floor system of through steel bridges are in tension-bending state,longitudinal shear force on the interface is caused by both longitudinal force of "The first mechanical system" and vertical bending of "The second mechanical system",and studs can be arranged with equal space in terms of the shear force in range of 0.2d (where d is the panel length) on the top ends.Transverse girders in steel longitudinal and transverse girders-concrete slab composite deck are in compound-bending state,and out-of-plane bending has to be taken into account in the stud design.In orthotropic integral steel deck-concrete slab composite deck,out-of-plane bending of transverse girders is very small so that it can be neglected,and studs on the orthotropic integral steel deck can be arranged according to the structural requirements.The above design methods and simplified calculation models have been applied in the stud design of NDB.展开更多
As one of the main load-carrying components of cable-stayed bridges,bridge towers are typically required to remain elastic even when subjected to severe ground motions with a 2%-3%probability of exceedance in 50 years...As one of the main load-carrying components of cable-stayed bridges,bridge towers are typically required to remain elastic even when subjected to severe ground motions with a 2%-3%probability of exceedance in 50 years.To fulfill this special requirement imposed by current seismic design codes,reinforcement ratios in the bridge towers have to be kept significantly higher than if limited ductility behavior of the tower is allowed.In addition,since the foundation capacity is closely related to the moment and shear capacities of the bridge tower,a large increase in bridge construction cost for elastically designed cable-stayed bridge is inevitable.To further investigate the possibility of limited ductility bridge tower design strategies,a new 1/20-scale cable-stayed bridge model with H-shaped bridge towers designed according to strong strut-weak tower column design was tested.The shake table experimental results are compared with a previous strong tower column-weak strut designed full bridge model.A comparison of the results show that ductility design with plastic hinges located on tower columns,i.e.,strong strut-weak tower column design,is another effective seismic design strategy that results in only small residual displacement at the top of the tower column,even under very severe earthquake excitations.展开更多
Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC)structures.Limited research has been performed to investigate the life-cycle cost(LCC)of coastal bridge piers with nonun...Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC)structures.Limited research has been performed to investigate the life-cycle cost(LCC)of coastal bridge piers with nonuniform corrosion using different materials.In this study,a reliability-based design optimization(RBDO)procedure is improved for the design of coastal bridge piers using six groups of commonly used materials,i.e.,normal performance concrete(NPC)with black steel(BS)rebar,high strength steel(HSS)rebar,epoxy coated(EC)rebar,and stainless steel(SS)rebar(named NPC-BS,NPC-HSS,NPC-EC,and NPC-SS,respectively),NPC with BS with silane soakage on the pier surface(named NPC-Silane),and high-performance concrete(HPC)with BS rebar(named HPC-BS).First,the RBDO procedure is improved for the design optimization of coastal bridge piers,and a bridge is selected to illustrate the procedure.Then,reliability analysis of the pier designed with each group of materials is carried out to obtain the time-dependent reliability in terms of the ultimate and serviceability performances.Next,the repair time of the pier is predicted based on the time-dependent reliability indices.Finally,the time-dependent LCCs for the pier are obtained for the selection of the optimal design.展开更多
Sutong Bridge tower which is 300.4 m is the highest one in the world.The tower anchor area uses the steel-concrete composite structure,its structure and the stress mechanism are complex,so it must be paid more attenti...Sutong Bridge tower which is 300.4 m is the highest one in the world.The tower anchor area uses the steel-concrete composite structure,its structure and the stress mechanism are complex,so it must be paid more attention to the structure durable issue.The 300 m height makes the tower quite sensitive to the environmental factors such as wind and temperature.The wind resistance safety of tower in construction stage is especially important.In this paper,the design of composite structure is introduced.The key technologies of tower geometry control and wind resistance in construction stage are analyzed.展开更多
Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requir...Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.展开更多
This paper,from three aspects including construction conditions,foundation design and construction,introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with cer...This paper,from three aspects including construction conditions,foundation design and construction,introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions,such as deep water,tidal effect,soft stratum and heavy traffic,during the construction of main-pylon foundations.展开更多
Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotec...Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotechnical conditions and therefore,scour protection will be a decisive factor for ensuring smooth and successful construction of this bridge.This paper,starting from structural description of deep-water group pile foundation,analyzes impact to the bridge safety introduced by scour and its protection and further presents different solutions of scour protection for foundation structures of this bridge.展开更多
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c...Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.展开更多
Carbon fiber reinforced polymer(CFRP)is an advanced material widely used in bridge structures,demonstrating a promising application prospect.CFRP possesses excellent mechanical properties,construction advantages,and d...Carbon fiber reinforced polymer(CFRP)is an advanced material widely used in bridge structures,demonstrating a promising application prospect.CFRP possesses excellent mechanical properties,construction advantages,and durability benefits.Its application in bridge reinforcement can significantly enhance the overall performance of the reinforced bridge,thereby improving the durability and extending the service life of the bridge.Therefore,it is necessary to further explore how CFRP can be effectively applied in bridge reinforcement projects to improve the quality of such projects and ensure the safety of bridges during operation.展开更多
基金Shenzhen Science and Technology Program(Grant No.20220817171811004)(Grant No.RCBS20231211090816033)+4 种基金the Major Key Project of PCL,China under Grant PCL2025A13Longgang District,Shenzhen's"Ten-Action Plan"for Supporting Innovation Projects(Grant No.LGKCSDPT2024002,LGKCSDPT2024003,LGKCSDPT2024004)the"Zhiguo"Action of Guangxi Science and Technology Program(Grant No.ZG2503980003)Guangdong S&T Program under(Grant No.2025B0909040003)Guangdong Provincial Leading Talent Program(Grant No.2024TX08Z319).
文摘The main cable is the primary load-bearing component of a suspension bridge,continuously exposed to harsh environmental conditions,such as wind and rain,throughout the year.These adverse conditions contribute to varying degrees of degradation and damage to the main cable,necessitating regular inspections to prevent catastrophic failures.Traditional manual inspection methods not only suffer from low efficiency but also pose significant safety risks to personnel.To address these challenges and ensure the safe and effective inspection of suspension bridge main cables,this study introduces a novel cooperative climbing robot,designated as Main Cable Robot Version II(CCRobot-M-II),inspired by the locomotion of the inchworm.The robot employs an alternating opening and closing mechanism of four gripper sets,mimicking the inchworm's movement to achieve efficient crawling along the suspension bridge handrails.This paper provides a comprehensive analysis of the structural design,key components,and motion mechanisms of CCRobot-M-II.A detailed force analysis of the robot's crawling process is also presented,followed by the design of the control system and the development of an efficient motion control algorithm.Laboratory experiments demonstrate that the robot achieves a positional error of 00.64%during crawling,with a maximum average crawling speed of 7.6 m/min.Furthermore,the biomimetic design enables the robot to overcome obstacles up to 30 mm in height and possess the capability to handle suspension bridge cables with spans ranging from 740 to 1100 mm.Finally,CCRobot-M-II successfully conducted an inspection of the main cable on a suspension bridge,marking the world's first successful deployment of a climbing robot for main cable inspection on a suspension bridge.
文摘This article discusses the design strategy of complex mountain highway bridges.During the research phase,details were obtained based on prior literature review and analysis of engineering materials from mountainous area bridges.After analyzing the design characteristics of complex mountainous area road and bridge projects,the principles for the design of bridges on complex mountainous area expressways were proposed.The research on bridge design was carried out from five dimensions:bridge type selection,foundation design,superstructure design,connection part design,and material and technological innovation.Eventually,a relatively complete design system was formed.It is expected that this paper can provide technical references and value for road and bridge projects in China and promote the sustainable development of China’s road traffic system from a macro perspective.
文摘BIM technology has become an important tool in road and bridge design.Through the application of BIM technology,the entire bridge process can be modeled to form a virtual bridge form.Through the simulation of bridge construction materials,construction techniques,and construction processes,a comprehensive analysis can be conducted to achieve visualization of the design and improve the efficiency of bridge design.This article mainly analyzes the advantages of BIM technology in bridge design,explores the application forms in bridge design,and proposes strategies to optimize bridge design,providing a certain reference for the improvement and optimization of bridge design work.
基金National Natural Science Foundation Under Grant No.50578118
文摘An investigation of girder bridges on National Highway 213 and the Doujiangyan-Wenchuan expressway after the Wenchuan earthquake showed that typical types of damage included: span collapses due to unseating at expansion joints; shear key failure; and damage of the expansion joint due to the slide-induced large relative displacement between the bottom of the girder and the top of the laminated-rubber bearing. This slide, however, can actually act as a form of isolation for the substructure, and as a result, the piers and foundation of most of the bridges on state route 213 suffered minor damage. The exception was the Baihua Bridge, which suffered severe damage. Corresponding seismic design recommendations are presented based on this investigation.
基金National Key R&D Program of China(2022YFB2602900)R&D Fund Project of China Academy of Railway Sciences Corporation Limited(2021YJ084)+2 种基金Project of Science and Technology R&D Program of China Railway(2016G002-K)R&D Fund Project of China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.(2021)R&D Fund Project of China Railway Shanghai Group(2021141).
文摘Purpose–The bridge expansion joint(BEJ)is a key device for accommodating spatial displacement at the beam end,and for providing vertical support for running trains passing over the gap between the main bridge and the approach bridge.For long-span railway bridges,it must also be coordinated with rail expansion joint(REJ),which is necessary to accommodate the expansion and contraction of,and reducing longitudinal stress in,the rails.The main aim of this study is to present analysis of recent developments in the research and application of BEJs in high-speed railway(HSR)long-span bridges in China,and to propose a performance-based integral design method for BEJs used with REJs,from both theoretical and engineering perspectives.Design/methodology/approach–The study first presents a summary on the application and maintenance of BEJs in HSR long-span bridges in China representing an overview of their state of development.Results of a survey of typical BEJ faults were analyzed,and field testing was conducted on a railway cable-stayed bridge in order to obtain information on the major mechanical characteristics of its BEJ under train load.Based on the above,a performance-based integral design method for BEJs with maximum expansion range 1600 mm(±800 mm),was proposed,covering all stages from overall conceptual design to consideration of detailed structural design issues.The performance of the novel BEJ design thus derived was then verified via theoretical analysis under different scenarios,full-scale model testing,and field testing and commissioning.Findings–Two major types of BEJs,deck-type and through-type,are used in HSR long-span bridges in China.Typical BEJ faults were found to mainly include skewness of steel sleepers at the bridge gap,abnormally large longitudinal frictional resistance,and flexural deformation of the scissor mechanisms.These faults influence BEJ functioning,and thus adversely affect track quality and train running performance at the beam end.Due to their simple and integral structure,deck-type BEJs with expansion range 1200 mm(±600 mm)or less have been favored as a solution offering improved operational conditions,and have emerged as a standard design.However,when the expansion range exceeds the above-mentioned value,special design work becomes necessary.Therefore,based on engineering practice,a performance-based integral design method for BEJs used with REJs was proposed,taking into account four major categories of performance requirements,i.e.,mechanical characteristics,train running quality,durability and insulation performance.Overall BEJ design must mainly consider component strength and the overall stiffness of BEJ;the latter factor in particular has a decisive influence on train running performance at the beam end.Detailed BEJ structural design must stress minimization of the frictional resistance of its sliding surface.The static and dynamic performance of the newlydesigned BEJ with expansion range 1600 mm have been confirmed to be satisfactory,via numerical simulation,full-scale model testing,and field testing and commissioning.Originality/value–This research provides a broad overview of the status of BEJs with large expansion range in HSR long-span bridges in China,along with novel insights into their design.
基金Federal Highway Administration at the University at Buffalo under Contract No.DTFH61-08-C-00012
文摘In the U.S., the current Load and Resistance Factor Design (LRFD) Specifications for highway bridges is a reliability-based formulation that considers failure probabilities of bridge components due to the actions of typical dead load and frequent vehicular loads. Various extreme load effects, such as earthquake and vessel collision, are on the same reliability-based platform. Since these extreme loads are time variables, combining them with not considered frequent. non- extreme loads is a significant challenge. The number of design limit state equations based on these failure probabilities can be unrealistically large and unnecessary from the view point of practical applications. Based on the opinion of AASHTO State Bridge Engineers, many load combinations are insignificant in their states. This paper describes the formulation of a criterion to include only the necessary load combinations to establish the design limit states. This criterion is established by examining the total failure probabilities for all possible time-invariant and time varying load combinations and breaking them down into partial terms. Then, important load combinations can be readily determined quantitatively,
基金the Federal Highway Administration under contract number DTFH61-92-C-00112.
文摘The Federal Highway Administration (FHWA) sponsored a large,multi-year project conducted by the Multidisciplinary Center for Earthquake Engineering Research (MCEER) titled'Seismic Vulnerability of New Highway Construction'(MCEER Project 112),which was completed in 1998.MCEER coordinated the work of many researchers,who performed studies on the seismic design and vulnerability analysis of highway bridges,tunnels,and retaining structures. Extensive research was conducted to provide revisions and improvements to current design and detailing approaches and national design specifications for highway bridges.The program included both analytical and experimental studies,and addressed seismic hazard exposure and ground motion input for the U.S.highway system;foundation design and soil behavior: structural importance,analysis,and response:structural design issues and details;and structural design criteria.
文摘This paper reviews the use of fiber-reinforced polymers (FRPs) in architectural and structural bridge design in the Netherlands. The challenges and opportunities of this relatively new material, both for the architect and the engineer, are discussed. An inventory of recent structural solutions in FRP is included, followed by a discussion on architectural FRP applications derived from the architectural practice of the author and of other pioneers.
文摘This paper presents the first of a series of case studies on the seismic design of long span bridges (cable-stayed bridges, suspension bridges and arch bridges) under a cooperative research project on seismic behavior and design of highway bridges between the State Key Laboratory for Disaster Reduction in Civil Engineering, Tongji University and the Multidisciplinary Center for Earthquake Engineering Research, University at Buffalo. The objective of this series of case studies is to examine the differences and similarities on the seismic design practice of long span bridges in China and the U.S., to identify research needs and to develop design guidelines beneficial to bridge engineers in both countries. Unlike short to medium span bridges, long span bridges are not included in most seismic design specifications, mainly because they are location dependent and structurally unique. In this paper, an available model of a steel tied half through arch bridge with a main span of 550m in China is discussed. Analysis is focused on comparisons of the seismic responses due to different ground motions. Seismic design criteria and seismic performance requirements for long span bridges in both countries were first introduced and compared, and then three near field earthquake records with large vertical components were selected as the excitations to examine the seismic behavior and seismic vulnerability of the bridge. Results show that (1) the selected near field ground motions cause larger responses to key components (critical sections) of the bridge (such as arch rib ends) with a maximum increase of more than twice those caused by the site specific ground motions; (2) piers, longitudinal girders and arch crowns are more vulnerable to vertical motions, especially their axial forces; and (3) large vertical components of near field ground motions may not significantly affect the bridge's internal forces provided that their peak acceleration spectra ordinates only appear at periods of less than 0.2s. However, they may have more influence on the longitudinal displacements of sliding bearings due to their large displacement spectra ordinates at the fundamental period of the bridge.
基金National Key Research and Development Program of China under Grant No.2011CB013606The financial support from the National Natural Science Foundation of China under Grant No.51378343。
文摘The aseismic design of cable-stayed bridges in the transverse direction with newly proposed metallic dampers that can accommodate both longitudinal and transverse movement of the deck has recently been considered.This work focuses on developing a simplified method to design an appropriate metallic damper.The seismic performance of cablestayed bridges with different damper stiffness,main span lengths,tower shapes and types of deck in the transverse direction are investigated.The transverse displacement of the deck of a cable-stayed bridge increases significantly with the increment of the damper stiffness,which proves that the design of the damper stiffness is crucial.A simplified model considering the damper stiffness,cable system and tower in the transverse direction is developed to evaluate the period and lateral displacement of a complicated cable-stayed bridge.Based on the simplified model,a design method is proposed and assessed using two cable-stayed bridges as examples.The results show that metallic dampers can be designed with high efficiency,and the optimal ductility of the damper can be selected.
文摘This paper presents the Location,the structural design as well as the anti-corrosion and the pilot programs of the marine exposure station of Zhoushan Archipelago seas sea-crossing bridges. Subjected to the marine environment,the concrete structures in serve with different mixing proportions,cover thickness,additional anti-corrosion measures such as rust-preventing agent,coating,penetration crystalline waterproof material,silicone and permeable fabric were studied. Those results obtained provide important information for the maintenance of marine concrete and the structural design of sea-crossing bridges in the above sea area.
基金Project(2004G016-B) supported by the Science and Technology Development Program of Railways Department,China
文摘Aimed at two typical composite floor systems of through steel bridges in high speed railway,design methods of headed studs were put forward for different composite members through comparing and analyzing the structure,mechanical characteristics and transmission routes of deck loads.The simplified calculation models were brought out for the stud design of the longitudinal girders and transverse girders in the composite floor system of Nanjing Dashengguan Yangtze River Bridge (NDB).Studs were designed and arranged by taking the middle panel of 336 m main span for example.The results show that under deck loads,the longitudinal girders in the composite floor system of through steel bridges are in tension-bending state,longitudinal shear force on the interface is caused by both longitudinal force of "The first mechanical system" and vertical bending of "The second mechanical system",and studs can be arranged with equal space in terms of the shear force in range of 0.2d (where d is the panel length) on the top ends.Transverse girders in steel longitudinal and transverse girders-concrete slab composite deck are in compound-bending state,and out-of-plane bending has to be taken into account in the stud design.In orthotropic integral steel deck-concrete slab composite deck,out-of-plane bending of transverse girders is very small so that it can be neglected,and studs on the orthotropic integral steel deck can be arranged according to the structural requirements.The above design methods and simplified calculation models have been applied in the stud design of NDB.
基金National Key Research and Development Plan,China under Grant No.2017YFC1500702the National Natural Science Foundation of China under Grant No.51478338。
文摘As one of the main load-carrying components of cable-stayed bridges,bridge towers are typically required to remain elastic even when subjected to severe ground motions with a 2%-3%probability of exceedance in 50 years.To fulfill this special requirement imposed by current seismic design codes,reinforcement ratios in the bridge towers have to be kept significantly higher than if limited ductility behavior of the tower is allowed.In addition,since the foundation capacity is closely related to the moment and shear capacities of the bridge tower,a large increase in bridge construction cost for elastically designed cable-stayed bridge is inevitable.To further investigate the possibility of limited ductility bridge tower design strategies,a new 1/20-scale cable-stayed bridge model with H-shaped bridge towers designed according to strong strut-weak tower column design was tested.The shake table experimental results are compared with a previous strong tower column-weak strut designed full bridge model.A comparison of the results show that ductility design with plastic hinges located on tower columns,i.e.,strong strut-weak tower column design,is another effective seismic design strategy that results in only small residual displacement at the top of the tower column,even under very severe earthquake excitations.
基金National Natural Science Foundation of China under Grant Nos.51921006 and 51725801Fundamental Research Funds for the Central Universities under Grant No.FRFCU5710093320Heilongjiang Touyan Innovation Team Program。
文摘Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC)structures.Limited research has been performed to investigate the life-cycle cost(LCC)of coastal bridge piers with nonuniform corrosion using different materials.In this study,a reliability-based design optimization(RBDO)procedure is improved for the design of coastal bridge piers using six groups of commonly used materials,i.e.,normal performance concrete(NPC)with black steel(BS)rebar,high strength steel(HSS)rebar,epoxy coated(EC)rebar,and stainless steel(SS)rebar(named NPC-BS,NPC-HSS,NPC-EC,and NPC-SS,respectively),NPC with BS with silane soakage on the pier surface(named NPC-Silane),and high-performance concrete(HPC)with BS rebar(named HPC-BS).First,the RBDO procedure is improved for the design optimization of coastal bridge piers,and a bridge is selected to illustrate the procedure.Then,reliability analysis of the pier designed with each group of materials is carried out to obtain the time-dependent reliability in terms of the ultimate and serviceability performances.Next,the repair time of the pier is predicted based on the time-dependent reliability indices.Finally,the time-dependent LCCs for the pier are obtained for the selection of the optimal design.
基金National Science and Technology Support Program of China(No.2006BAG04B04)
文摘Sutong Bridge tower which is 300.4 m is the highest one in the world.The tower anchor area uses the steel-concrete composite structure,its structure and the stress mechanism are complex,so it must be paid more attention to the structure durable issue.The 300 m height makes the tower quite sensitive to the environmental factors such as wind and temperature.The wind resistance safety of tower in construction stage is especially important.In this paper,the design of composite structure is introduced.The key technologies of tower geometry control and wind resistance in construction stage are analyzed.
文摘Beijing-Tianjin intercity railway is the first newly-built passenger dedicated line with operating speed of 350 km/h in our country. During design,new ideas of bridge construction were carried out to ensure the requirements of safety,comfort and stability of the train under high-speed condition. At the same time,concepts of environmental adaptability,service to transportation and comprehensive benefits were observed. On the whole line,long-bridge schemes were adopted and the most advanced technologies of unballasted track were utilized on bridges,the length of which accounts for 87.7 % of the total line. The success of design and construction of the bridges on this rail has accumulated valuable experience for high-speed railway construction on a large scale in the future,and made it a marking,demonstrating,and model project to follow.
基金National Science and Technology Support Program(No.2006BAG04B05)
文摘This paper,from three aspects including construction conditions,foundation design and construction,introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions,such as deep water,tidal effect,soft stratum and heavy traffic,during the construction of main-pylon foundations.
基金National Science and Technology Support Program(No.2006BAG04B05)
文摘Sutong Bridge,as a world-record cable-stayed bridge with its main span exceeding 1 000 m constructed in Yangtze River estuary region in China,is located at a site with complicated hydrologic conditions and poor geotechnical conditions and therefore,scour protection will be a decisive factor for ensuring smooth and successful construction of this bridge.This paper,starting from structural description of deep-water group pile foundation,analyzes impact to the bridge safety introduced by scour and its protection and further presents different solutions of scour protection for foundation structures of this bridge.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)
文摘Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.
文摘Carbon fiber reinforced polymer(CFRP)is an advanced material widely used in bridge structures,demonstrating a promising application prospect.CFRP possesses excellent mechanical properties,construction advantages,and durability benefits.Its application in bridge reinforcement can significantly enhance the overall performance of the reinforced bridge,thereby improving the durability and extending the service life of the bridge.Therefore,it is necessary to further explore how CFRP can be effectively applied in bridge reinforcement projects to improve the quality of such projects and ensure the safety of bridges during operation.