Due to the rapid industrialization and the development of the economy in each country,the demand for energy is increasing rapidly.The coal mines have to pace up the mining operations with large production to meet the ...Due to the rapid industrialization and the development of the economy in each country,the demand for energy is increasing rapidly.The coal mines have to pace up the mining operations with large production to meet the energy demand.This requirement has led underground coal mines to go deeper with more difficult conditions,especially the mining hazards,such as large deformations,rockburst,coal burst,roof collapse,to name a few.Therefore,this study aims at investigating and predicting the stability of the roadways in underground coal mines exploited by longwall mining method,using various novel intelligent techniques based on physics-based optimization algorithms(i.e.multi-verse optimizer(MVO),equilibrium optimizer(EO),simulated annealing(SA),and Henry gas solubility optimization(HGSO)) and adaptive neuro-fuzzy inference system(ANFIS),named as MVO-ANFIS,EO-ANFIS,SA-ANFIS and HGSOANFIS models.Accordingly,162 roof displacement events were investigated based on the characteristics of surrounding rocks,such as cohesion,Young’s modulus,density,shear strength,angle of internal friction,uniaxial compressive strength,quench durability index,rock mass rating,and tensile strength.The MVO-ANFIS,EO-ANFIS,SA-ANFIS and HGSO-ANFIS models were then developed and evaluated based on this dataset for predicting roof displacements in roadways of underground mines.The results indicated that the proposed intelligent techniques could accurately predict the roof displacements in roadways of underground mines with an accuracy in the range of 83%-92%.Remarkably,the SA-ANFIS model yielded the most dominant accuracy(i.e.92%).Based on the accurate predictions from the proposed techniques,the reinforced solutions can be timely suggested to ensure the stability of roadways during exploiting coal,especially in the underground coal mines exploited by the longwall mining.展开更多
An optimization model of underground mining method selection was established on the basis of the unascertained measurement theory.Considering the geologic conditions,technology,economy and safety production,ten main f...An optimization model of underground mining method selection was established on the basis of the unascertained measurement theory.Considering the geologic conditions,technology,economy and safety production,ten main factors influencing the selection of mining method were taken into account,and the comprehensive evaluation index system of mining method selection was constructed.The unascertained evaluation indices corresponding to the selected factors for the actual situation were solved both qualitatively and quantitatively.New measurement standards were constructed.Then,the unascertained measurement function of each evaluation index was established.The index weights of the factors were calculated by entropy theory,and credible degree recognition criteria were established according to the unascertained measurement theory.The results of mining method evaluation were obtained using the credible degree criteria,thus the best underground mining method was determined.Furthermore,this model was employed for the comprehensive evaluation and selection of the chosen standard mining methods in Xinli Gold Mine in Sanshandao of China.The results show that the relative superiority degrees of mining methods can be calculated using the unascertained measurement optimization model,so the optimal method can be easily determined.Meanwhile,the proposed method can take into account large amount of uncertain information in mining method selection,which can provide an effective way for selecting the optimal underground mining method.展开更多
Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining.This paper investigates the strategy of mining options for an orebody using a Mixed Integer...Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining.This paper investigates the strategy of mining options for an orebody using a Mixed Integer Linear Programming(MILP)optimization framework.The MILP formulation maximizes the Net Present Value(NPV)of the reserve when extracted with(i)open pit mining,(ii)underground mining,and(iii)concurrent open pit and underground mining.Comparatively,implementing open pit mining generates a higher NPV than underground mining.However considering the investment required for these mining options,underground mining generates a better return on investment than open pit mining.Also,in the concurrent open pit and underground mining scenario,the optimizer prefers extracting blocks using open pit mining.Although the underground mine could access ore sooner,the mining cost differential for open pit mining is more than compensated for by the discounting benefits associated with earlier underground mining.展开更多
Highwall mining of thick(up to 30.48 m)steeply dipping(20°or more)coal seams provides many chal lenges,both geotechnically and operationally,as seam dips near or in excess of highwall mining machine capabilities ...Highwall mining of thick(up to 30.48 m)steeply dipping(20°or more)coal seams provides many chal lenges,both geotechnically and operationally,as seam dips near or in excess of highwall mining machine capabilities are encountered.Maximizing coal recovery while maintaining highwall stability requires innovative techniques with regard to web and barrier pillar layout,depth of penetration,and choice of mining horizon within the seam.Stability of highwall mining slopes,openings,and pillarsare typically analyzed using the ARMPS-HWM program,as well as LAMODEL,UDEC and SLOPE/W modeling.Highwall stability can be maintained,and highwall mining production optimized by applying design cri-teria in creative ways,including alternating miner penetration depths and initiating mining of thick seams toward the bottom of the seam.Highwall mining of thick,steeply dipping coal requires careful planning and execution,including close cooperation between geotechnical design engineers,the mining company,and the highwall mining contractor.This paper describes the application of creative design techniques to a specific pit arrangement at the Westmoreland Kemmerer Mine,Kemmerer,Wyoming.Highwall mining was accomplished by UGM ADDCAR Systems,LLC on a contract basis.展开更多
The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put f...The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put for-ward through analyzing the limitations of moving cone method under such conditions. With a view to recovering asmuch mineral resource as possible and making the maximum profit from the whole deposit, the new principle is tomaximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizon-tal and vertical directions and modules for software package (DM&MCAD) have been developed and tested inTonglushan Copper Mine. It has been proved to be rather effective in the mining practice.展开更多
The efficiency of excavation a mining tunnel is definitely linked with modes of cut-holes. According to experience and methods of engineering analogy, the double-wedge cut, the 9-hole cut and the single spiral cut wer...The efficiency of excavation a mining tunnel is definitely linked with modes of cut-holes. According to experience and methods of engineering analogy, the double-wedge cut, the 9-hole cut and the single spiral cut were determined originally by considering the production conditions and blasting environment of the mining tunnels of the-74 m horizontal in the Da-ye iron mine. Based on acquired modes of cut-holes, the effect of the cut was studied, on the one hand, by a numerical simulation method with the aid of LS-DYNA3D, a nonlinear dynamic finite element program; on the other hand, a spot experiment was carried out in the mining tunnels. Both the numerical simulation and the spot experiment demonstrated and agreed that a single spiral cut provides the optimum excavation effect.展开更多
The performance of an optimized aerodynamic shape is further improved by a second-step optimization using the design knowledge discovered by a data mining technique based on Proper Orthogonal Decomposition(POD) in the...The performance of an optimized aerodynamic shape is further improved by a second-step optimization using the design knowledge discovered by a data mining technique based on Proper Orthogonal Decomposition(POD) in the present study. Data generated in the first-step optimization by using evolution algorithms is saved as the source data, among which the superior data with improved objectives and maintained constraints is chosen. Only the geometry components of the superior data are picked out and used for constructing the snapshots of POD. Geometry characteristics of the superior data illustrated by POD bases are the design knowledge, by which the second-step optimization can be rapidly achieved. The optimization methods are demonstrated by redesigning a transonic compressor rotor blade, NASA Rotor 37, in the study to maximize the peak adiabatic efficiency, while maintaining the total pressure ratio and mass flow rate.Firstly, the blade is redesigned by using a particle swarm optimization method, and the adiabatic efficiency is increased by 1.29%. Then, the second-step optimization is performed by using the design knowledge, and a 0.25% gain on the adiabatic efficiency is obtained. The results are presented and addressed in detail, demonstrating that geometry variations significantly change the pattern and strength of the shock wave in the blade passage. The former reduces the separation loss,while the latter reduces the shock loss, and both favor an increase of the adiabatic efficiency.展开更多
Because there is neither waste rock nor mill tailings in the gypsum mine, and the buildings on the goaf of gypsum mine are needed to be protected, the research proposed the scheme of the clay filling technology. Gypsu...Because there is neither waste rock nor mill tailings in the gypsum mine, and the buildings on the goaf of gypsum mine are needed to be protected, the research proposed the scheme of the clay filling technology. Gypsum, cement, lime and water glass were used as adhesive, and the strength of different material ratios were investigated in this study. The influence factors of clay strength were obtained in the order of cement, gypsum, water glass and lime. The results show that the cement content is the determinant influence factor, and gypsum has positive effects, while the water glass can enhance both clay strength and the fluidity of the filing slurry. Furthermore, combining chaotic optimization method with neural network, the optimal ratio of composite cementing agent was obtained. The results show that the optimal ratio of water glass, cement, lime and clay (in quality) is 1.17:6.74:4.17:87.92 in the process of bottom self-flow filling, while the optimal ratio is 1.78:9.58:4.71:83.93 for roof-contacted filling. A novel filling process to fill in gypsum mine goaf with clay is established. The engineering practice shows that the filling cost is low, thus, notable economic benefit is achieved.展开更多
Particle Swarm Optimization(PSO)has been utilized as a useful tool for solving intricate optimization problems for various applications in different fields.This paper attempts to carry out an update on PSO and gives a...Particle Swarm Optimization(PSO)has been utilized as a useful tool for solving intricate optimization problems for various applications in different fields.This paper attempts to carry out an update on PSO and gives a review of its recent developments and applications,but also provides arguments for its efficacy in resolving optimization problems in comparison with other algorithms.Covering six strategic areas,which include Data Mining,Machine Learning,Engineering Design,Energy Systems,Healthcare,and Robotics,the study demonstrates the versatility and effectiveness of the PSO.Experimental results are,however,used to show the strong and weak parts of PSO,and performance results are included in tables for ease of comparison.The results stress PSO’s efficiency in providing optimal solutions but also show that there are aspects that need to be improved through combination with algorithms or tuning to the parameters of the method.The review of the advantages and limitations of PSO is intended to provide academics and practitioners with a well-rounded view of the methods of employing such a tool most effectively and to encourage optimized designs of PSO in solving theoretical and practical problems in the future.展开更多
In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution i...In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa.展开更多
Cooling process of iron ore pellets in a circular cooler has great impacts on the pellet quality and systematic energy exploitation. However, multi-variables and non-visualization of this gray system is unfavorable to...Cooling process of iron ore pellets in a circular cooler has great impacts on the pellet quality and systematic energy exploitation. However, multi-variables and non-visualization of this gray system is unfavorable to efficient production. Thus, the cooling process of iron ore pellets was optimized using mathematical model and data mining techniques. A mathematical model was established and validated by steady-state production data, and the results show that the calculated values coincide very well with the measured values. Based on the proposed model, effects of important process parameters on gas-pellet temperature profiles within the circular cooler were analyzed to better understand the entire cooling process. Two data mining techniques—Association Rules Induction and Clustering were also applied on the steady-state production data to obtain expertise operating rules and optimized targets. Finally, an optimized control strategy for the circular cooler was proposed and an operation guidance system was developed. The system could realize the visualization of thermal process at steady state and provide operation guidance to optimize the circular cooler.展开更多
In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of produc...In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of production, safety and environmental impact in the underground metal mine was established by using multidisciplinary design optimization method. The coupling effects from various disciplines were fully considered, and adaptive mutative scale chaos immunization optimization algorithm was adopted to solve multidisciplinary design optimization model of underground metal mine production scale. Practical results show that multidisciplinary design optimization on production scale of an underground lead and zinc mine reflect the actual operating conditions more realistically, the production scale is about 1.25 Mt/a (Lead and zinc metal content of 160 000 t/a), the economic life is approximately 14 a, corresponding coefficient of production profits can be increased to 15.13%, safety factor can be increased to 5.4% and environmental impact coefficient can be reduced by 9.52%.展开更多
A novel binary particle swarm optimization for frequent item sets mining from high-dimensional dataset(BPSO-HD) was proposed, where two improvements were joined. Firstly, the dimensionality reduction of initial partic...A novel binary particle swarm optimization for frequent item sets mining from high-dimensional dataset(BPSO-HD) was proposed, where two improvements were joined. Firstly, the dimensionality reduction of initial particles was designed to ensure the reasonable initial fitness, and then, the dynamically dimensionality cutting of dataset was built to decrease the search space. Based on four high-dimensional datasets, BPSO-HD was compared with Apriori to test its reliability, and was compared with the ordinary BPSO and quantum swarm evolutionary(QSE) to prove its advantages. The experiments show that the results given by BPSO-HD is reliable and better than the results generated by BPSO and QSE.展开更多
Underground mines require complex construction activities including the shaft, levels, raises, winzes and ore passes. In an underground mine based on stoping method, orebody part(s) maximizing profit should be determi...Underground mines require complex construction activities including the shaft, levels, raises, winzes and ore passes. In an underground mine based on stoping method, orebody part(s) maximizing profit should be determined. This process is called stope layout optimization (SLO) and implemented under site-specific geotechnical, operational and economic constraints. For practical purpose, the design obtained by SLO shows consecutive stopes in one path, which assists in defining the mining direction of these stopes. However, this direction may not accommodate the spatial distribution of the ore grade: if the orebody orientation and mining direction differ, the value of the mining operation may decrease. This paper proposes an approach whereby paths in the SLO are defined as decision variables to avoid the cost of mining in the wrong direction. Furthermore, in the genetic-based formulation, which accounts for orebody uncertainty, a robust cluster average design process is proposed to improve SLO’s performance regarding metal content. A case study in narrow gold vein deposit shows that the profit of an underground mining operation could be underestimated by 25%-48% if the algorithm ignores stope layout orientation.展开更多
The continuous destruction and frauds prevailing due to phishing URLs make it an indispensable area for research.Various techniques are adopted in the detection process,including neural networks,machine learning,or hy...The continuous destruction and frauds prevailing due to phishing URLs make it an indispensable area for research.Various techniques are adopted in the detection process,including neural networks,machine learning,or hybrid techniques.A novel detection model is proposed that uses data mining with the Particle Swarm Optimization technique(PSO)to increase and empower the method of detecting phishing URLs.Feature selection based on various techniques to identify the phishing candidates from the URL is conducted.In this approach,the features mined from the URL are extracted using data mining rules.The features are selected on the basis of URL structure.The classification of these features identified by the data mining rules is done using PSO techniques.The selection of features with PSO optimization makes it possible to identify phishing URLs.Using a large number of rule identifiers,the true positive rate for the identification of phishing URLs is maximized in this approach.The experiments show that feature selection using data mining and particle swarm optimization helps tremendously identify the phishing URLs based on the structure of the URL itself.Moreover,it can minimize processing time for identifying the phishing website instead.So,the approach can be beneficial to identify suchURLs over the existing contemporary detecting models proposed before.展开更多
Pump chambers, normally used as dominant structures in mining engineering to insure the safety and production of un-derground coal mines, become generally deformed under conditions of deep mining. Given the geology an...Pump chambers, normally used as dominant structures in mining engineering to insure the safety and production of un-derground coal mines, become generally deformed under conditions of deep mining. Given the geology and engineering condition of Qishan Coal Mine in Xuzhou, the failure characteristics of pump chambers at the –1000 m level show that the main cause can be attributed to the spatial effect induced by intersectional chambers, where one pump is constructed per well. We developed an opti-mized design of the pump room, in which the pump wells in the traditional design are integrated into one compounding well. We suggest that the new design can limit the spatial effect of intersectional chambers during construction given our relevant numerical simulation. The new design is able to simplify the structure of the pump chamber and reduce the amount of excavation required. Based on a bolt-mesh-anchor with a rigid gap coupling supporting technology, the stability of pump chamber can be improved greatly.展开更多
Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research metho...Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.展开更多
Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order...Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.展开更多
An approach which combines particle swarm optimization and support vector machine(PSO–SVM)is proposed to forecast large-scale goaf instability(LSGI).Firstly,influencing factors of goaf safety are analyzed,and followi...An approach which combines particle swarm optimization and support vector machine(PSO–SVM)is proposed to forecast large-scale goaf instability(LSGI).Firstly,influencing factors of goaf safety are analyzed,and following parameters were selected as evaluation indexes in the LSGI:uniaxial compressive strength(UCS)of rock,elastic modulus(E)of rock,rock quality designation(RQD),area ration of pillar(Sp),the ratio of width to height of the pillar(w/h),depth of ore body(H),volume of goaf(V),dip of ore body(a)and area of goaf(Sg).Then LSGI forecasting model by PSO-SVM was established according to the influencing factors.The performance of hybrid model(PSO+SVM=PSO–SVM)has been compared with the grid search method of support vector machine(GSM–SVM)model.The actual data of 40 goafs are applied to research the forecasting ability of the proposed method,and two cases of underground mine are also validated by the proposed model.The results indicated that the heuristic algorithm of PSO can speed up the SVM parameter optimization search,and the predictive ability of the PSO–SVM model with the RBF kernel function is acceptable and robust,which might hold a high potential to become a useful tool in goaf risky prediction research.展开更多
Web pillars enduring complex coupled loads are critical for stability in high-wall mining.This study develops a dynamic failure criterion for web pillars under non-uniform loading using catastrophe theory.Through the ...Web pillars enduring complex coupled loads are critical for stability in high-wall mining.This study develops a dynamic failure criterion for web pillars under non-uniform loading using catastrophe theory.Through the analysis of the web pillar-overburden system’s dynamic stress and deformation,a total potential energy function and dynamic failure criterion were established for web pillars.An optimizing method for web pillar parameters was developed in highwall mining.The dynamic criterion established was used to evaluate the dynamic failure and stability of web pillars under static and dynamic loading.Key findings reveal that vertical displacements exhibit exponential-trigonometric variation under static loads and multi-variable power-law behavior under dynamic blasting.Instability risks arise when the roof’s tensile strength-to-stress ratio drops below 1.Using catastrophe theory,the bifurcation setΔ<0 signals sudden instability.The criterion defines failure as when the unstable web pillar section length l1 exceeds the roof’s critical collapse distance l2.Case studies and simulations determine an optimal web pillar width of 4.6 m.This research enhances safety and resource recovery,providing a theoretical framework for advancing highwall mining technology.展开更多
基金funded by the Natural Science Foundation of Hunan Province,China(Grant No.2021JJ30679)the Center for Mining,Electro-Mechanical Research,Hanoi University of Mining and Geology,Hanoi,Vietnam,for the kind supports。
文摘Due to the rapid industrialization and the development of the economy in each country,the demand for energy is increasing rapidly.The coal mines have to pace up the mining operations with large production to meet the energy demand.This requirement has led underground coal mines to go deeper with more difficult conditions,especially the mining hazards,such as large deformations,rockburst,coal burst,roof collapse,to name a few.Therefore,this study aims at investigating and predicting the stability of the roadways in underground coal mines exploited by longwall mining method,using various novel intelligent techniques based on physics-based optimization algorithms(i.e.multi-verse optimizer(MVO),equilibrium optimizer(EO),simulated annealing(SA),and Henry gas solubility optimization(HGSO)) and adaptive neuro-fuzzy inference system(ANFIS),named as MVO-ANFIS,EO-ANFIS,SA-ANFIS and HGSOANFIS models.Accordingly,162 roof displacement events were investigated based on the characteristics of surrounding rocks,such as cohesion,Young’s modulus,density,shear strength,angle of internal friction,uniaxial compressive strength,quench durability index,rock mass rating,and tensile strength.The MVO-ANFIS,EO-ANFIS,SA-ANFIS and HGSO-ANFIS models were then developed and evaluated based on this dataset for predicting roof displacements in roadways of underground mines.The results indicated that the proposed intelligent techniques could accurately predict the roof displacements in roadways of underground mines with an accuracy in the range of 83%-92%.Remarkably,the SA-ANFIS model yielded the most dominant accuracy(i.e.92%).Based on the accurate predictions from the proposed techniques,the reinforced solutions can be timely suggested to ensure the stability of roadways during exploiting coal,especially in the underground coal mines exploited by the longwall mining.
基金Project(2007CB209402) supported by the National Basic Research Program of China Project(SKLGDUEK0906) supported by the Research Fund of State Key Laboratory for Geomechanics and Deep Underground Engineering of China
文摘An optimization model of underground mining method selection was established on the basis of the unascertained measurement theory.Considering the geologic conditions,technology,economy and safety production,ten main factors influencing the selection of mining method were taken into account,and the comprehensive evaluation index system of mining method selection was constructed.The unascertained evaluation indices corresponding to the selected factors for the actual situation were solved both qualitatively and quantitatively.New measurement standards were constructed.Then,the unascertained measurement function of each evaluation index was established.The index weights of the factors were calculated by entropy theory,and credible degree recognition criteria were established according to the unascertained measurement theory.The results of mining method evaluation were obtained using the credible degree criteria,thus the best underground mining method was determined.Furthermore,this model was employed for the comprehensive evaluation and selection of the chosen standard mining methods in Xinli Gold Mine in Sanshandao of China.The results show that the relative superiority degrees of mining methods can be calculated using the unascertained measurement optimization model,so the optimal method can be easily determined.Meanwhile,the proposed method can take into account large amount of uncertain information in mining method selection,which can provide an effective way for selecting the optimal underground mining method.
基金funding support provided by the Laurentian University Research Fund for the compilation of this report
文摘Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining.This paper investigates the strategy of mining options for an orebody using a Mixed Integer Linear Programming(MILP)optimization framework.The MILP formulation maximizes the Net Present Value(NPV)of the reserve when extracted with(i)open pit mining,(ii)underground mining,and(iii)concurrent open pit and underground mining.Comparatively,implementing open pit mining generates a higher NPV than underground mining.However considering the investment required for these mining options,underground mining generates a better return on investment than open pit mining.Also,in the concurrent open pit and underground mining scenario,the optimizer prefers extracting blocks using open pit mining.Although the underground mine could access ore sooner,the mining cost differential for open pit mining is more than compensated for by the discounting benefits associated with earlier underground mining.
文摘Highwall mining of thick(up to 30.48 m)steeply dipping(20°or more)coal seams provides many chal lenges,both geotechnically and operationally,as seam dips near or in excess of highwall mining machine capabilities are encountered.Maximizing coal recovery while maintaining highwall stability requires innovative techniques with regard to web and barrier pillar layout,depth of penetration,and choice of mining horizon within the seam.Stability of highwall mining slopes,openings,and pillarsare typically analyzed using the ARMPS-HWM program,as well as LAMODEL,UDEC and SLOPE/W modeling.Highwall stability can be maintained,and highwall mining production optimized by applying design cri-teria in creative ways,including alternating miner penetration depths and initiating mining of thick seams toward the bottom of the seam.Highwall mining of thick,steeply dipping coal requires careful planning and execution,including close cooperation between geotechnical design engineers,the mining company,and the highwall mining contractor.This paper describes the application of creative design techniques to a specific pit arrangement at the Westmoreland Kemmerer Mine,Kemmerer,Wyoming.Highwall mining was accomplished by UGM ADDCAR Systems,LLC on a contract basis.
基金Project (59704004) supported by the National Natural Science Foundation of ChinaProject (2000) supported by Foundation for University Key Teacher by the Ministry of Education
文摘The pit limit optimization is discussed, which is one of the most important problems in the combined min-ing method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put for-ward through analyzing the limitations of moving cone method under such conditions. With a view to recovering asmuch mineral resource as possible and making the maximum profit from the whole deposit, the new principle is tomaximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizon-tal and vertical directions and modules for software package (DM&MCAD) have been developed and tested inTonglushan Copper Mine. It has been proved to be rather effective in the mining practice.
文摘The efficiency of excavation a mining tunnel is definitely linked with modes of cut-holes. According to experience and methods of engineering analogy, the double-wedge cut, the 9-hole cut and the single spiral cut were determined originally by considering the production conditions and blasting environment of the mining tunnels of the-74 m horizontal in the Da-ye iron mine. Based on acquired modes of cut-holes, the effect of the cut was studied, on the one hand, by a numerical simulation method with the aid of LS-DYNA3D, a nonlinear dynamic finite element program; on the other hand, a spot experiment was carried out in the mining tunnels. Both the numerical simulation and the spot experiment demonstrated and agreed that a single spiral cut provides the optimum excavation effect.
基金supported by the National Natural Science Foundation of China(Nos.51676003,51206003,and 11702305)
文摘The performance of an optimized aerodynamic shape is further improved by a second-step optimization using the design knowledge discovered by a data mining technique based on Proper Orthogonal Decomposition(POD) in the present study. Data generated in the first-step optimization by using evolution algorithms is saved as the source data, among which the superior data with improved objectives and maintained constraints is chosen. Only the geometry components of the superior data are picked out and used for constructing the snapshots of POD. Geometry characteristics of the superior data illustrated by POD bases are the design knowledge, by which the second-step optimization can be rapidly achieved. The optimization methods are demonstrated by redesigning a transonic compressor rotor blade, NASA Rotor 37, in the study to maximize the peak adiabatic efficiency, while maintaining the total pressure ratio and mass flow rate.Firstly, the blade is redesigned by using a particle swarm optimization method, and the adiabatic efficiency is increased by 1.29%. Then, the second-step optimization is performed by using the design knowledge, and a 0.25% gain on the adiabatic efficiency is obtained. The results are presented and addressed in detail, demonstrating that geometry variations significantly change the pattern and strength of the shock wave in the blade passage. The former reduces the separation loss,while the latter reduces the shock loss, and both favor an increase of the adiabatic efficiency.
基金supported by the National Basic Research and Development Program of China (No. 2010CB732004)the joint funding of the National Natural Science Foundation and Shanghai Baosteel Group Corporation of China (No. 51074177)
文摘Because there is neither waste rock nor mill tailings in the gypsum mine, and the buildings on the goaf of gypsum mine are needed to be protected, the research proposed the scheme of the clay filling technology. Gypsum, cement, lime and water glass were used as adhesive, and the strength of different material ratios were investigated in this study. The influence factors of clay strength were obtained in the order of cement, gypsum, water glass and lime. The results show that the cement content is the determinant influence factor, and gypsum has positive effects, while the water glass can enhance both clay strength and the fluidity of the filing slurry. Furthermore, combining chaotic optimization method with neural network, the optimal ratio of composite cementing agent was obtained. The results show that the optimal ratio of water glass, cement, lime and clay (in quality) is 1.17:6.74:4.17:87.92 in the process of bottom self-flow filling, while the optimal ratio is 1.78:9.58:4.71:83.93 for roof-contacted filling. A novel filling process to fill in gypsum mine goaf with clay is established. The engineering practice shows that the filling cost is low, thus, notable economic benefit is achieved.
文摘Particle Swarm Optimization(PSO)has been utilized as a useful tool for solving intricate optimization problems for various applications in different fields.This paper attempts to carry out an update on PSO and gives a review of its recent developments and applications,but also provides arguments for its efficacy in resolving optimization problems in comparison with other algorithms.Covering six strategic areas,which include Data Mining,Machine Learning,Engineering Design,Energy Systems,Healthcare,and Robotics,the study demonstrates the versatility and effectiveness of the PSO.Experimental results are,however,used to show the strong and weak parts of PSO,and performance results are included in tables for ease of comparison.The results stress PSO’s efficiency in providing optimal solutions but also show that there are aspects that need to be improved through combination with algorithms or tuning to the parameters of the method.The review of the advantages and limitations of PSO is intended to provide academics and practitioners with a well-rounded view of the methods of employing such a tool most effectively and to encourage optimized designs of PSO in solving theoretical and practical problems in the future.
基金Project(50974041) supported by the National Natural Science Foundation of China Project(20090450112) supported by the Postdoctoral Foundation of ChinaProject(20093910) supported by the Natural Science Foundation of Liaoning Province, China
文摘In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa.
基金Item Sponsored by National Natural Science Foundation of China(51174253)
文摘Cooling process of iron ore pellets in a circular cooler has great impacts on the pellet quality and systematic energy exploitation. However, multi-variables and non-visualization of this gray system is unfavorable to efficient production. Thus, the cooling process of iron ore pellets was optimized using mathematical model and data mining techniques. A mathematical model was established and validated by steady-state production data, and the results show that the calculated values coincide very well with the measured values. Based on the proposed model, effects of important process parameters on gas-pellet temperature profiles within the circular cooler were analyzed to better understand the entire cooling process. Two data mining techniques—Association Rules Induction and Clustering were also applied on the steady-state production data to obtain expertise operating rules and optimized targets. Finally, an optimized control strategy for the circular cooler was proposed and an operation guidance system was developed. The system could realize the visualization of thermal process at steady state and provide operation guidance to optimize the circular cooler.
基金Project(2012BAK09B02-05) supported by the National "Twelfth Five-year" Science & Technology Support Plan of China
文摘In order to ensure overall optimization of the underground metal mine production scale, multidisciplinary design optimization model of production scale which covers the subsystem objective function of income of production, safety and environmental impact in the underground metal mine was established by using multidisciplinary design optimization method. The coupling effects from various disciplines were fully considered, and adaptive mutative scale chaos immunization optimization algorithm was adopted to solve multidisciplinary design optimization model of underground metal mine production scale. Practical results show that multidisciplinary design optimization on production scale of an underground lead and zinc mine reflect the actual operating conditions more realistically, the production scale is about 1.25 Mt/a (Lead and zinc metal content of 160 000 t/a), the economic life is approximately 14 a, corresponding coefficient of production profits can be increased to 15.13%, safety factor can be increased to 5.4% and environmental impact coefficient can be reduced by 9.52%.
文摘A novel binary particle swarm optimization for frequent item sets mining from high-dimensional dataset(BPSO-HD) was proposed, where two improvements were joined. Firstly, the dimensionality reduction of initial particles was designed to ensure the reasonable initial fitness, and then, the dynamically dimensionality cutting of dataset was built to decrease the search space. Based on four high-dimensional datasets, BPSO-HD was compared with Apriori to test its reliability, and was compared with the ordinary BPSO and quantum swarm evolutionary(QSE) to prove its advantages. The experiments show that the results given by BPSO-HD is reliable and better than the results generated by BPSO and QSE.
基金Project(488262-15)supported by the Natural Sciences and Engineering Research Council of Canada
文摘Underground mines require complex construction activities including the shaft, levels, raises, winzes and ore passes. In an underground mine based on stoping method, orebody part(s) maximizing profit should be determined. This process is called stope layout optimization (SLO) and implemented under site-specific geotechnical, operational and economic constraints. For practical purpose, the design obtained by SLO shows consecutive stopes in one path, which assists in defining the mining direction of these stopes. However, this direction may not accommodate the spatial distribution of the ore grade: if the orebody orientation and mining direction differ, the value of the mining operation may decrease. This paper proposes an approach whereby paths in the SLO are defined as decision variables to avoid the cost of mining in the wrong direction. Furthermore, in the genetic-based formulation, which accounts for orebody uncertainty, a robust cluster average design process is proposed to improve SLO’s performance regarding metal content. A case study in narrow gold vein deposit shows that the profit of an underground mining operation could be underestimated by 25%-48% if the algorithm ignores stope layout orientation.
基金The authors would like to thank the Deanship of Scientific Research at Shaqra University for supporting this work.
文摘The continuous destruction and frauds prevailing due to phishing URLs make it an indispensable area for research.Various techniques are adopted in the detection process,including neural networks,machine learning,or hybrid techniques.A novel detection model is proposed that uses data mining with the Particle Swarm Optimization technique(PSO)to increase and empower the method of detecting phishing URLs.Feature selection based on various techniques to identify the phishing candidates from the URL is conducted.In this approach,the features mined from the URL are extracted using data mining rules.The features are selected on the basis of URL structure.The classification of these features identified by the data mining rules is done using PSO techniques.The selection of features with PSO optimization makes it possible to identify phishing URLs.Using a large number of rule identifiers,the true positive rate for the identification of phishing URLs is maximized in this approach.The experiments show that feature selection using data mining and particle swarm optimization helps tremendously identify the phishing URLs based on the structure of the URL itself.Moreover,it can minimize processing time for identifying the phishing website instead.So,the approach can be beneficial to identify suchURLs over the existing contemporary detecting models proposed before.
基金supported by the Major Project of the National Basic Research Program of China (No2006CB202200)the Program for New Century Excellent Talents in Uni-versity (NoNCET07-0800)the Special Fund for Basic Research and Operating Expenses of the China University of Mining & Technology, Beijing and the Academician workstation in enterprise of Jiangsu Province (No.BM2009563)
文摘Pump chambers, normally used as dominant structures in mining engineering to insure the safety and production of un-derground coal mines, become generally deformed under conditions of deep mining. Given the geology and engineering condition of Qishan Coal Mine in Xuzhou, the failure characteristics of pump chambers at the –1000 m level show that the main cause can be attributed to the spatial effect induced by intersectional chambers, where one pump is constructed per well. We developed an opti-mized design of the pump room, in which the pump wells in the traditional design are integrated into one compounding well. We suggest that the new design can limit the spatial effect of intersectional chambers during construction given our relevant numerical simulation. The new design is able to simplify the structure of the pump chamber and reduce the amount of excavation required. Based on a bolt-mesh-anchor with a rigid gap coupling supporting technology, the stability of pump chamber can be improved greatly.
文摘Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.
文摘Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.
基金supported by the National Basic Research Program Project of China(No.2010CB732004)the National Natural Science Foundation Project of China(Nos.50934006 and41272304)+2 种基金the Graduated Students’ResearchInnovation Fund Project of Hunan Province of China(No.CX2011B119)the Scholarship Award for Excellent Doctoral Student of Ministry of Education of China and the Valuable Equipment Open Sharing Fund of Central South University(No.1343-76140000022)
文摘An approach which combines particle swarm optimization and support vector machine(PSO–SVM)is proposed to forecast large-scale goaf instability(LSGI).Firstly,influencing factors of goaf safety are analyzed,and following parameters were selected as evaluation indexes in the LSGI:uniaxial compressive strength(UCS)of rock,elastic modulus(E)of rock,rock quality designation(RQD),area ration of pillar(Sp),the ratio of width to height of the pillar(w/h),depth of ore body(H),volume of goaf(V),dip of ore body(a)and area of goaf(Sg).Then LSGI forecasting model by PSO-SVM was established according to the influencing factors.The performance of hybrid model(PSO+SVM=PSO–SVM)has been compared with the grid search method of support vector machine(GSM–SVM)model.The actual data of 40 goafs are applied to research the forecasting ability of the proposed method,and two cases of underground mine are also validated by the proposed model.The results indicated that the heuristic algorithm of PSO can speed up the SVM parameter optimization search,and the predictive ability of the PSO–SVM model with the RBF kernel function is acceptable and robust,which might hold a high potential to become a useful tool in goaf risky prediction research.
基金supported by the National Natural Science Foundation of China(Nos.52204136,52474100,and 52204092).
文摘Web pillars enduring complex coupled loads are critical for stability in high-wall mining.This study develops a dynamic failure criterion for web pillars under non-uniform loading using catastrophe theory.Through the analysis of the web pillar-overburden system’s dynamic stress and deformation,a total potential energy function and dynamic failure criterion were established for web pillars.An optimizing method for web pillar parameters was developed in highwall mining.The dynamic criterion established was used to evaluate the dynamic failure and stability of web pillars under static and dynamic loading.Key findings reveal that vertical displacements exhibit exponential-trigonometric variation under static loads and multi-variable power-law behavior under dynamic blasting.Instability risks arise when the roof’s tensile strength-to-stress ratio drops below 1.Using catastrophe theory,the bifurcation setΔ<0 signals sudden instability.The criterion defines failure as when the unstable web pillar section length l1 exceeds the roof’s critical collapse distance l2.Case studies and simulations determine an optimal web pillar width of 4.6 m.This research enhances safety and resource recovery,providing a theoretical framework for advancing highwall mining technology.