期刊文献+
共找到5,401篇文章
< 1 2 250 >
每页显示 20 50 100
A Novel Method for Assessing and Optimizing Software Project Process Based Risk Control
1
作者 JIANG Wei-jin XU Yu-sheng XU Yu-hui 《Wuhan University Journal of Natural Sciences》 EI CAS 2006年第1期289-293,共5页
A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project r... A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects. 展开更多
关键词 software process project management software risk risk control
在线阅读 下载PDF
Enterprise Process Modeling Methodology and Environment Supporting Project Management
2
作者 许红霞 张莉 周伯生 《Journal of Shanghai University(English Edition)》 CAS 2005年第6期493-500,共8页
Development of the global economy makes modem enterprises confront challenges of efficient managements for large projects and complex processes. Projects are typically managed in rather special manners. On the contrar... Development of the global economy makes modem enterprises confront challenges of efficient managements for large projects and complex processes. Projects are typically managed in rather special manners. On the contrary, there exist many methodologies for product process management to achieve consistency and continuance. However, processes often lack flexibility offered by projects. This paper dis~ the relationship of conceptual characteristics between process and project, gives low-level details to tackle the difference between them, and proposes an enterprise process modeling method for project management. An integrated environment is designed to support the method from which both project management and process management can receive benefits and conform to the limitations. 展开更多
关键词 process engineering process modeling project management supporting environment INTEGRATION
在线阅读 下载PDF
A Study on the Control Technique of Construction Project Process
3
作者 Changming Hu Shaoping Zhang Xueyan Wang 《Engineering(科研)》 2013年第3期303-308,共6页
The construction process control of large-scale projects is one of the difficulties and keys in the owner’s project management. Based on generalization process index, this paper proposes an approach to construction p... The construction process control of large-scale projects is one of the difficulties and keys in the owner’s project management. Based on generalization process index, this paper proposes an approach to construction project process control. The paper elaborates on the concept and calculation of generalization process index, which, on analysis, possesses Markov property. Monthly generalization process index is regarded as a state of Markov chain, and the transition between different states is realized by computer simulation. According to the Markov process forecasting model and by means of MATLAB program, the project process forecast is realized, and the completion probability in contract period is obtained. From practical instances, it is concluded that this approach has good applicability and operability and that the obtained results can reflect the degree of project risks. 展开更多
关键词 GENERALIZATION process INDEX MARKOV COMPUTER STIMULATION project process Control
暂未订购
How Does Robotics Process Automation (RPA) Affect Project Management Practices
4
作者 Mounir El Khatib Amna Almarri +1 位作者 Asma Almemari Aysha Alqassimi 《Advances in Internet of Things》 2023年第2期13-30,共18页
The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research st... The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research study, an extensive literature review was conducted, which helped in gaining a theoretical understanding. These findings were then justified with the help of current and relevant secondary sources in the analysis section. The findings suggested that RPA is quite advantageous for implementing in varied aspects of a business, especially in the field of project management. However, it can pose several challenges, which need to be taken into due consideration by the organizations during execution such as the capabilities of the employees and the abilities of the existing systems to incorporate automation, among others. It was ultimately concluded that RPA is highly advantageous for project management teams but its effective implementation is the key to success. 展开更多
关键词 ROBOTICS Robotics process Automation project Management PLATFORMS
在线阅读 下载PDF
Process-oriented knowledge-sharing platform for chemical engineering design projects
5
作者 Zhang, Lingling Zhang, Yuejin +2 位作者 Li, Jun Zhen, Miao Zheng, Xiuyu 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期136-141,共6页
A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in mult... A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in multi-projects of chemical engineering design are analyzed. Then based on theories of project management, process management, and knowledge management, a process-oriented knowledge-sharing platform is proposed. The platform has three characteristics: knowledge is divided into professional knowledge and project management knowledge; knowledge sharing is integrated with the project process, which makes knowledge sharing a necessary part of the project process and ensures the quantity of knowledge shared; the platform provides quantitative measurements of incentive mechanisms for knowledge providers and users which ensures the quality of knowledge shared. This knowledge-sharing platform uses two knowledge management tools, a knowledge map and a knowledge base, to support the platform. 展开更多
关键词 chemical engineering design project knowledge sharing process-oriented PLATFORM
在线阅读 下载PDF
OPTIONAL AND PREDICTABLE PROJECTIONS OF SET-VALUED MEASURABLE PROCESSES
6
作者 Wang Rongmingof Statistcs,East China Normal Univ.,Shanghai 200062. 《Applied Mathematics(A Journal of Chinese Universities)》 SCIE CSCD 2001年第3期323-329,共7页
In this paper,the optional and predictable projections of set-valued measurable processes are studied.The existence and uniqueness of optional and predictable projections of set-valued measurable processes are proved ... In this paper,the optional and predictable projections of set-valued measurable processes are studied.The existence and uniqueness of optional and predictable projections of set-valued measurable processes are proved under proper circumstances. 展开更多
关键词 Set-valued conditional expectation essential(convex)closure optional projection predictable projection measurable processes.
在线阅读 下载PDF
The Studies of the Welding Processes and Procedures on the West-East Pipeline Project
7
作者 SuiYongli HuangFuxiang ZhaoHaihong YinChanghua 《工程科学(英文版)》 2004年第4期60-63,共4页
The West East pipeline project attracted the attention from all over the world for its long distance, huge diameter, complex geographic conditions, and diversified welding techniques being applied.In this paper the de... The West East pipeline project attracted the attention from all over the world for its long distance, huge diameter, complex geographic conditions, and diversified welding techniques being applied.In this paper the detail welding process and procedures used in the project are discussed and the distinguished achievements on welding techniques of China pipeline construction are described. 展开更多
关键词 WEGTP 输气管道 管道焊接 X70
在线阅读 下载PDF
基于Project的虚拟维修拆装过程建模 被引量:14
8
作者 黄涛 张豫南 +1 位作者 李瀚飞 田鹏 《系统仿真学报》 CAS CSCD 北大核心 2012年第1期192-196,共5页
分析虚拟维修拆装过程描述的复杂性,提出利用项目管理软件Microsoft Project建立维修拆装过程模型的方法。建立的过程模型主要包括:拆装结构模型、拆装资源模型和拆装运动模型。其中,利用了Project中WBS层次管理、设定任务优先级及任务... 分析虚拟维修拆装过程描述的复杂性,提出利用项目管理软件Microsoft Project建立维修拆装过程模型的方法。建立的过程模型主要包括:拆装结构模型、拆装资源模型和拆装运动模型。其中,利用了Project中WBS层次管理、设定任务优先级及任务链接等功能建立基于层次关系和关联关系的拆装结构模型;构造用于表现螺旋运动、直线运动和空间运动的三个描述公式,建立拆装运动模型。最后以某型坦克起动电机的拆卸为实例,说明建立的模型能很好地应用于维修拆装过程的描述,并且具有直观性。 展开更多
关键词 虚拟维修 拆装过程模型 项目管理软件 电气设备
原文传递
AI融合项目式学习模式培养复合型人才——以“高分子材料成型加工”课程为例
9
作者 孙金煜 陈滢 +4 位作者 刘玉锦 雷蕾 崇舒涵 郭子轩 候高国 《高分子通报》 北大核心 2026年第2期306-313,共8页
在人工智能(AI)快速发展的背景下,“高分子材料成型加工”课程亟需开展创新性教学改革。本研究旨在突破传统的单向理论教学模式,以实际生产中的工艺优化与质量控制等核心问题为导向,深入推进项目化教学改革。通过组织学生组建团队,利用P... 在人工智能(AI)快速发展的背景下,“高分子材料成型加工”课程亟需开展创新性教学改革。本研究旨在突破传统的单向理论教学模式,以实际生产中的工艺优化与质量控制等核心问题为导向,深入推进项目化教学改革。通过组织学生组建团队,利用Python框架与企业数据库资源,并应用机器学习算法探究工艺参数与产品性能之间的关联,进而构建预测模型以实现智能工艺参数调节。经过数据采集、模型训练与系统部署等环节,实现了AI技术与课程理论原理的深度融合,有效提升了学生的跨学科问题解决能力,并激发了其学习热情。在项目化学习过程中,学生开发的AI辅助方案显著提高了实验制品的合格率,并在企业小试产线测试中表现出良好效果。通过更新“高分子材料成型加工”课程的教学内容与方法,为培养适应智能制造需求的高分子材料领域复合型人才提供了有效途径,对推动高校高分子材料与工程专业教育的数字化转型具有重要的示范意义。 展开更多
关键词 人工智能 项目化教学 高分子材料成型加工 机器学习 跨学科能力培养
原文传递
数字信号处理混合式智慧教学设计与实践
10
作者 许全盛 江国乾 +1 位作者 谢平 陈晓玲 《淮北师范大学学报(自然科学版)》 2026年第1期91-96,共6页
针对数字信号处理课程理论与实践脱节,学生参与度低,考核评价单一等问题,构建“线上自学-线下精讲-项目实践”的混合式智慧教学模式。通过整合慕课与学习通平台搭建人工智能(AI)赋能的智慧课程支撑体系,依托AI助教提供个性化学习路径,... 针对数字信号处理课程理论与实践脱节,学生参与度低,考核评价单一等问题,构建“线上自学-线下精讲-项目实践”的混合式智慧教学模式。通过整合慕课与学习通平台搭建人工智能(AI)赋能的智慧课程支撑体系,依托AI助教提供个性化学习路径,优化“授课-互动-实践”课堂流程;引入前沿技术案例,设计跨场景三级项目促进实践能力迁移;建立“过程性评价+终结性评价”的多维动态体系,结合AI初评与人工评审精准评价学生学习成果。该模式将传统混合式教学升级为人-机融合的新型混合式教学,线下同步与线上异步交互推进,有效达成学生“知识-能力-素质”的协同培养目标,为数字信号处理课程教学智慧化转型提供可实施范式。 展开更多
关键词 数字信号处理 混合式教学 项目式学习 AI赋能 智慧教学
在线阅读 下载PDF
Processing Modflow模型在预测地面沉降中的应用 被引量:12
11
作者 阚京梁 罗立红 《铁道工程学报》 EI 北大核心 2010年第2期27-31,共5页
研究目的:针对开采地下水引起的区域地面沉降对线性工程的影响问题,以京津城际铁路为例,采用地下水三维渗流与地面沉降耦合模型计算软件—Processing Modflow,选择沿线地面沉降较严重区段,建立区域地下水流场与地面沉降的耦合模型,运用... 研究目的:针对开采地下水引起的区域地面沉降对线性工程的影响问题,以京津城际铁路为例,采用地下水三维渗流与地面沉降耦合模型计算软件—Processing Modflow,选择沿线地面沉降较严重区段,建立区域地下水流场与地面沉降的耦合模型,运用参数修正后的模型,进行地面沉降预测。研究结论:利用实测地面沉降值对模型进行验证,沉降中心位置及沉降量的模拟结果与实测结果基本吻合;设计不同的地下水开采方案,利用模型预测地面沉降,结果表明:合理压采地下水可以降低地面沉降量及沉降坡度,减缓地面沉降的不均匀性。 展开更多
关键词 processING MODFLOW 区域地面沉降 线性工程 耦合模型 沉降预测
暂未订购
基于Process Intelligence的BT合同管理系统研究
12
作者 方俊 王歌 +2 位作者 田家乐 佘名高 张先玲 《土木工程与管理学报》 2013年第3期76-79,共4页
随着社会投资渠道的多元化,BT模式越来越广泛的应用于基础设施建设领域。BT项目影响范围广、风险因素多、法律关系复杂,涉及投资、融资、勘察、设计、监理、移交付款等环节,合同管理中沟通和协调工作量大。Process Intelligence是商务... 随着社会投资渠道的多元化,BT模式越来越广泛的应用于基础设施建设领域。BT项目影响范围广、风险因素多、法律关系复杂,涉及投资、融资、勘察、设计、监理、移交付款等环节,合同管理中沟通和协调工作量大。Process Intelligence是商务智能在流程管理领域的拓展,包括流程模拟、追踪及优化等阶段,其设计理念可应用于合同管理的不同层次,即通过定期收集、分析合同管理中的数据,及时发现超过阈值的例外情况,降低项目目标控制的风险。从项目参与方的实际需求出发,以业务流程标准化、目标功能模块化、管理表单规范化为目标,结合某市长江大桥项目为案例,借鉴流程智能设计理念,阐述BT合同管理系统的功能框架及核心模块的实现方法和过程。 展开更多
关键词 BT项目 process INTELLIGENCE 合同管理系统
在线阅读 下载PDF
全过程工程咨询模式下项目管理与工程监理的协同机制研究
13
作者 闫标 《城市建筑》 2026年第6期198-200,共3页
随着我国工程建设模式的深度变革,全过程工程咨询已成为行业创新发展的重要方向。文章聚焦于全过程工程咨询中项目管理与工程监理的协同机制,深入分析了二者在法律定位、服务范围和工作重心方面的异同。研究表明,通过构建包含组织整合... 随着我国工程建设模式的深度变革,全过程工程咨询已成为行业创新发展的重要方向。文章聚焦于全过程工程咨询中项目管理与工程监理的协同机制,深入分析了二者在法律定位、服务范围和工作重心方面的异同。研究表明,通过构建包含组织整合、流程优化、信息共享与合同管理的多维协同机制,能显著提升项目效率与质量。结合案例实践,进一步提出了实施这一协同机制的具体路径与对策,为推进全过程工程咨询的高质量发展提供了理论参考与实践指导。 展开更多
关键词 全过程工程咨询 项目管理 工程监理 协同机制 组织整合
在线阅读 下载PDF
基于层次分析法的项目评审研究
14
作者 张逊 周小易 《价值工程》 2026年第2期37-39,共3页
项目评审是确保项目可行性和成功实施的关键步骤。本文探讨了层次分析法(AHP)作为一种有效的决策分析工具进行评审研究。首先介绍了项目评审的重要性,接着阐述层次分析法的基本原理及其在决策分析中的优势。然后,以Y省设施农业项目评审... 项目评审是确保项目可行性和成功实施的关键步骤。本文探讨了层次分析法(AHP)作为一种有效的决策分析工具进行评审研究。首先介绍了项目评审的重要性,接着阐述层次分析法的基本原理及其在决策分析中的优势。然后,以Y省设施农业项目评审为例,详细描述了层次分析法在项目评审过程中的具体步骤和应用方法,包括问题的层次结构构建、指标和因素的权重确定、各方案的评估与比较等,以及其带来的决策支持和效果验证。最后讨论了AHP方法在实际操作中可能遇到的挑战和应对策略,并总结了其在项目评审中的局限性和改进空间。 展开更多
关键词 层次分析法 项目评审 决策分析 设施农业
在线阅读 下载PDF
基于“用地清单制”的项目策划全流程生成模型探索
15
作者 刘一萍 齐共同 +2 位作者 刘晓彤 杜莹 乔新 《自然资源信息化》 2026年第1期32-37,共6页
为推动社会投资项目“用地清单制”的改革,落实“放管服”要求,促进项目策划生成工作的开展,本研究梳理形成了“用地清单”内容、项目生成的流程事项,探讨了项目策划生成、区域评估与“用地清单制”融合的新模式,采用地理信息系统及互... 为推动社会投资项目“用地清单制”的改革,落实“放管服”要求,促进项目策划生成工作的开展,本研究梳理形成了“用地清单”内容、项目生成的流程事项,探讨了项目策划生成、区域评估与“用地清单制”融合的新模式,采用地理信息系统及互联网等信息技术,设计了一种工程建设项目策划全流程生成模型,搭建了相应的模型系统,通过固化流程、明确职责、集成区域评估成果和各项分析指标,从项目录入、储备、发起策划、选址、合规性审查、区域评估分析、协调会商、意见反馈到最终生成项目策划报告,实现项目策划全流程管控,统筹协调项目建设条件,推动“用地清单制”的运行,实现放权赋能、提前谋划、助力审批和服务加速,开辟了项目策划“直通车”。 展开更多
关键词 项目策划生成 全流程管控 “用地清单” 项目储备库 协调会商
在线阅读 下载PDF
BIM技术在公共建筑工程全过程成本管理中的应用
16
作者 王晨华 《智能建筑与智慧城市》 2026年第1期114-116,共3页
文章对BIM技术在公共建筑工程全过程成本管理中的应用进行了研究。分析了其应用现状,指出存在的应用范围有限、融合程度不足等问题,阐述了提高成本估算准确性、促进设计优化等应用价值;探讨了在决策、设计、招投标、施工及竣工结算各阶... 文章对BIM技术在公共建筑工程全过程成本管理中的应用进行了研究。分析了其应用现状,指出存在的应用范围有限、融合程度不足等问题,阐述了提高成本估算准确性、促进设计优化等应用价值;探讨了在决策、设计、招投标、施工及竣工结算各阶段的应用策略与方法。结果表明,该技术能有效解决传统成本管理存在的问题。研究认为,需加强技术研发与人才培养,以推动其深度应用,保障公共建筑工程的可持续发展。 展开更多
关键词 BIM技术 公共建筑工程 全过程成本管理
在线阅读 下载PDF
基于流形学习的电网客服中心实时数据自动监测方法
17
作者 侯昝宇 《自动化技术与应用》 2026年第2期138-142,共5页
针对电网客服中心的网络安全问题,研究搭建了实时数据自动监测模型。首先,引入类内距离最小与类间距离最大的思想来对局部保持投影算法进行改进,用于检测异常数据。然后利用模糊规则和层次分析法来对电网实时数据自动监测进行优化。结... 针对电网客服中心的网络安全问题,研究搭建了实时数据自动监测模型。首先,引入类内距离最小与类间距离最大的思想来对局部保持投影算法进行改进,用于检测异常数据。然后利用模糊规则和层次分析法来对电网实时数据自动监测进行优化。结果表明,改进局部保持投影算法的运行时间与传统局部保持投影算法相差不大。改进局部保持投影算法的检测准确率更高,为99.43%。基于层次分析的实时数据监测算法的监测准确率始终最高,在数据样本集为500时,准确率为99.84%,召回率为99.62%。实验结果证明了所提实时数据自动监测模型的异常数据检测和实时数据监测性能较好,有助于提高电网的安全性和稳定性。 展开更多
关键词 流形学习 数据自动监测 电网客服 层次分析法 局部保持投影
在线阅读 下载PDF
建设项目全过程造价控制的关键要素及实施策略研究
18
作者 孙权 《现代工程科技》 2026年第1期173-176,共4页
建设项目全过程造价控制贯穿项目全生命周期,是实现投资效益最大化、规避造价失控风险的核心手段。基于项目生命周期理论,划分决策、设计、招投标、施工及竣工结算五大核心阶段并分析各阶段特征,系统剖析各阶段造价控制的关键要素,有针... 建设项目全过程造价控制贯穿项目全生命周期,是实现投资效益最大化、规避造价失控风险的核心手段。基于项目生命周期理论,划分决策、设计、招投标、施工及竣工结算五大核心阶段并分析各阶段特征,系统剖析各阶段造价控制的关键要素,有针对性地提出分阶段实施策略。同时,探讨了协同管理机制构建与先进技术整合路径,形成“要素识别–策略落地–协同支撑”的全过程造价控制体系,为提升建设项目造价管理精细化水平提供实践参考。经实践验证,该体系可有效打通各阶段管控壁垒,使项目投资超支率降低15%以上,显著提升了造价管控精细化水平与投资效益,为建设项目造价管理提供切实可行的实践参考。 展开更多
关键词 建设项目 全过程造价控制 关键要素 实施策略 协同管理
在线阅读 下载PDF
高压氧舱建设工程管理优化策略
19
作者 卢巍 《科技创新与应用》 2026年第1期159-162,166,共5页
该文以某三级医院高压氧舱建设项目为具体实例,比较详细地介绍高压氧舱建设工程前期筹备、土建施工、设备安装、竣工验收等过程。对各环节的施工要点、质量控制等方面进行比较详细的阐述,提出相应的建设过程管理优化策略,旨在提升高压... 该文以某三级医院高压氧舱建设项目为具体实例,比较详细地介绍高压氧舱建设工程前期筹备、土建施工、设备安装、竣工验收等过程。对各环节的施工要点、质量控制等方面进行比较详细的阐述,提出相应的建设过程管理优化策略,旨在提升高压氧舱建设工程的质量、增强项目的安全保障、提高建设效率,推动高压氧舱建设朝着更加科学的方向稳步发展。 展开更多
关键词 高压氧舱 建设工程管理 流程优化 安全保障 多学科协同 智能升级
暂未订购
基于AISM的装备研制项目全过程质量评估影响因素分析
20
作者 郑海平 张裕嘉 《指挥控制与仿真》 2026年第1期117-125,共9页
在装备研制项目管理领域,准确分析全过程质量评估的影响因素对于确保项目的成功至关重要。为了提高项目质量管理的有效性和可靠性,分析过程必须遵循系统全面性、客观科学性和可量化的原则。通过构建二维质量管理坐标系,从论证立项阶段... 在装备研制项目管理领域,准确分析全过程质量评估的影响因素对于确保项目的成功至关重要。为了提高项目质量管理的有效性和可靠性,分析过程必须遵循系统全面性、客观科学性和可量化的原则。通过构建二维质量管理坐标系,从论证立项阶段、方案设计阶段、样机研制阶段、试验鉴定阶段和列装定型阶段逐一对质量影响因素进行分析,初步识别出24个潜在的影响因素,并通过进一步筛选,最终确定了16个关键的质量影响因素。采用对抗解释结构模型(AISM)对影响因素进行结构化分析,构建UP型和DOWN型两种相互对抗的拓扑层级图,确定出各影响因素之间的相互关系和层级关系,明晰装备研制项目的根源层影响因素、中间层影响因素和浅表层影响因素。 展开更多
关键词 对抗解释结构模型 装备研制项目 全过程质量评估 影响因素分析
在线阅读 下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部