Theauthor proposes a dual layer source grid load storage collaborative planning model based on Benders decomposition to optimize the low-carbon and economic performance of the distribution network.The model plans the ...Theauthor proposes a dual layer source grid load storage collaborative planning model based on Benders decomposition to optimize the low-carbon and economic performance of the distribution network.The model plans the configuration of photovoltaic(3.8 MW),wind power(2.5 MW),energy storage(2.2 MWh),and SVC(1.2 Mvar)through interaction between upper and lower layers,and modifies lines 2–3,8–9,etc.to improve transmission capacity and voltage stability.The author uses normal distribution and Monte Carlo method to model load uncertainty,and combines Weibull distribution to describe wind speed characteristics.Compared to the traditional three-layer model(TLM),Benders decomposition-based two-layer model(BLBD)has a 58.1%reduction in convergence time(5.36 vs.12.78 h),a 51.1%reduction in iteration times(23 vs.47 times),a 8.07%reduction in total cost(12.436 vs.13.528 million yuan),and a 9.62%reduction in carbon emissions(12,456 vs.13,782 t).After optimization,the peak valley difference decreased from4.1 to 2.9MW,the renewable energy consumption rate reached 93.4%,and the energy storage efficiency was 87.6%.Themodel has been validated in the IEEE 33 node system,demonstrating its superiority in terms of economy,low-carbon,and reliability.展开更多
The adoption of 5G for Railways(5G-R)is expanding,particularly in high-speed trains,due to the benefits offered by 5G technology.High-speed trains must provide seamless connectivity and Quality of Service(QoS)to ensur...The adoption of 5G for Railways(5G-R)is expanding,particularly in high-speed trains,due to the benefits offered by 5G technology.High-speed trains must provide seamless connectivity and Quality of Service(QoS)to ensure passengers have a satisfactory experience throughout their journey.Installing base stations along urban environments can improve coverage but can dramatically reduce the experience of users due to interference.In particular,when a user with a mobile phone is a passenger in a high speed train traversing between urban centres,the coverage and the 5G resources in general need to be adequate not to diminish her experience of the service.The utilization of macro,pico,and femto cells may optimize the utilization of 5G resources.In this paper,a Genetic Algorithm(GA)-based approach to address the challenges of 5G network planning for 5G-R services is presented.The network is divided into three cell types,macro,pico,and femto cells—and the optimization process is designed to achieve a balance between key objectives:providing comprehensive coverage,minimizing interference,and maximizing energy efficiency.The study focuses on environments with high user density,such as high-speed trains,where reliable and high-quality connectivity is critical.Through simulations,the effectiveness of the GA-driven framework in optimizing coverage and performance in such scenarios is demonstrated.The algorithm is compared with the Particle Swarm Optimisation(PSO)and the Simulated Annealing(SA)methods and interesting insights emerged.The GA offers a strong balance between coverage and efficiency,achieving significantly higher coverage than PSO while maintaining competitive energy efficiency and interference levels.Its steady fitness improvement and adaptability make it well-suited for scenarios where wide coverage is a priority alongside acceptable performance trade-offs.展开更多
Active distribution network(ADN)planning is crucial for achieving a cost-effective transition to modern power systems,yet it poses significant challenges as the system scale increases.The advent of quantum computing o...Active distribution network(ADN)planning is crucial for achieving a cost-effective transition to modern power systems,yet it poses significant challenges as the system scale increases.The advent of quantum computing offers a transformative approach to solve ADN planning.To fully leverage the potential of quantum computing,this paper proposes a photonic quantum acceleration algorithm.First,a quantum-accelerated framework for ADN planning is proposed on the basis of coherent photonic quantum computers.The ADN planning model is then formulated and decomposed into discrete master problems and continuous subproblems to facilitate the quantum optimization process.The photonic quantum-embedded adaptive alternating direction method of multipliers(PQA-ADMM)algorithm is subsequently proposed to equivalently map the discrete master problem onto a quantum-interpretable model,enabling its deployment on a photonic quantum computer.Finally,a comparative analysis with various solvers,including Gurobi,demonstrates that the proposed PQA-ADMM algorithm achieves significant speedup on the modified IEEE 33-node and IEEE 123-node systems,highlighting its effectiveness.展开更多
Rational distribution network planning optimizes power flow distribution,reduces grid stress,enhances voltage quality,promotes renewable energy utilization,and reduces costs.This study establishes a distribution netwo...Rational distribution network planning optimizes power flow distribution,reduces grid stress,enhances voltage quality,promotes renewable energy utilization,and reduces costs.This study establishes a distribution network planning model incorporating distributed wind turbines(DWT),distributed photovoltaics(DPV),and energy storage systems(ESS).K-means++is employed to partition the distribution network based on electrical distance.Considering the spatiotemporal correlation of distributed generation(DG)outputs in the same region,a joint output model of DWT and DPV is developed using the Frank-Copula.Due to the model’s high dimensionality,multiple constraints,and mixed-integer characteristics,bilevel programming theory is utilized to structure the model.The model is solved using a mixed-integer particle swarmoptimization algorithm(MIPSO)to determine the optimal location and capacity of DG and ESS integrated into the distribution network to achieve the best economic benefits and operation quality.The proposed bilevel planning method for distribution networks is validated through simulations on the modified IEEE 33-bus system.The results demonstrate significant improvements,with the proposedmethod reducing the annual comprehensive cost by 41.65%and 13.98%,respectively,compared to scenarios without DG and ESS or with only DG integration.Furthermore,it reduces the daily average voltage deviation by 24.35%and 10.24%and daily network losses by 55.72%and 35.71%.展开更多
The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol...The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...展开更多
In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configura...In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.展开更多
Traditional distribution network planning relies on the professional knowledge of planners,especially when analyzing the correlations between the problems existing in the network and the crucial influencing factors.Th...Traditional distribution network planning relies on the professional knowledge of planners,especially when analyzing the correlations between the problems existing in the network and the crucial influencing factors.The inherent laws reflected by the historical data of the distribution network are ignored,which affects the objectivity of the planning scheme.In this study,to improve the efficiency and accuracy of distribution network planning,the characteristics of distribution network data were extracted using a data-mining technique,and correlation knowledge of existing problems in the network was obtained.A data-mining model based on correlation rules was established.The inputs of the model were the electrical characteristic indices screened using the gray correlation method.The Apriori algorithm was used to extract correlation knowledge from the operational data of the distribution network and obtain strong correlation rules.Degree of promotion and chi-square tests were used to verify the rationality of the strong correlation rules of the model output.In this study,the correlation relationship between heavy load or overload problems of distribution network feeders in different regions and related characteristic indices was determined,and the confidence of the correlation rules was obtained.These results can provide an effective basis for the formulation of a distribution network planning scheme.展开更多
In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two...In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two steps in the method:the first step was that the shortest paths along streets between substation and load points were found by the basic ant colony algorithm to form a preliminary radial distribution network,and the second step was that the result of the shortest path was used to initialize pheromone concentration and pheromone updating rules to generate globally optimal distribution network.Cases studies show that the proposed method is effective and can meet the planning requirements.It is verified that the proposed method has better solution and utility than planning method based on the ant colony algorithm.展开更多
Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependenc...Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.展开更多
Making use of Microsoft Visual Studio.NET platform,hierarchical network planning is realized in working procedure time-optimization of the construction by TBM,and hierarchical network graph of the construction by TBM ...Making use of Microsoft Visual Studio.NET platform,hierarchical network planning is realized in working procedure time-optimization of the construction by TBM,and hierarchical network graph of the construction by TBM is drawn based on browser.Then the theory of system realization is discussed,six components of system that can be reused are explained emphatically.The realization of hierarchical network panning in Internet provides available guarantee for controlling rate of progress in large-scale or middle-sized projects.展开更多
The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,...The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.展开更多
In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In thi...In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year.展开更多
The broad-leaved Korean pine(Pinus koraiensis) forest is one of the most biodiverse zonal communities in the North Temperate Zone and an important habitat for many endangered species.Broad-leaved Korean pine forests(B...The broad-leaved Korean pine(Pinus koraiensis) forest is one of the most biodiverse zonal communities in the North Temperate Zone and an important habitat for many endangered species.Broad-leaved Korean pine forests(BKPFs) are shrinking quickly due to deforestation and rapid urbanization. Thus, scientific protection strategies are urgently needed to change this status. Changbai Mountains contains one of the largest BKPFs and is considered a priority biodiversity conservation area in China. Guided by systematic conservation planning(SCP) methods and procedures, we chose representative species and communities in BKPFs ecosystem as priority conservation objects, and set quantitative conservation target, which is in the light of the biodiversity characteristic of BKPFs. The watershed area is used as planning unit. We used CPlan software to calculate the irreplaceability(Ir)value of each planning unit and the contribution value(Ti) of each conservation object to(1) assess the conservation efficiency;(2) identify the conservation gap of the existing conservation network. Then wecalculated a human disturbance index(HDI) for planning units in the conservation gaps and combine this with the Ir value to design three conservation scenarios to optimize the conservation network.Results show that planning units with high conservation value 14.16% of the total area, with3084.36 km2 were covered by the existing conservation network. 79.28% of planning units with high conservation value have not been protected which were concentrated mainly in the eight gap areas.Only 25.3% of protection objects achieved their conservation target with the existing conservation network. Conservation efficiency is low. Three conservation scenarios are constituted, each prioritizing a different aim:(1) ecological value;(2)species rescue; and(3) economical avoidance. The three conservation schemes potentially enable 93%,88% and 51% of conservation objects, respectively, to achieve identified conservation targets, thereby improving conservation efficiency significantly.展开更多
The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for ...The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.展开更多
Efficient utilization of the equipment distributed in different enterprises and optimal allocation of these resources is an important concern for networked manufacturing. The third party based equipment sharing approa...Efficient utilization of the equipment distributed in different enterprises and optimal allocation of these resources is an important concern for networked manufacturing. The third party based equipment sharing approach is put forward to optimize the utilization of distributed equipment for networked manufacturing; Taking advantage of the shared equipment offered by equipment providers by means of lease agreement, the third party carries out production by establishing networked virtual factory. Operational mechanism of the third party based equipment sharing is discussed, and characteristics of this approach in achieving resource allocation are analyzed. Shared equipment planning is formulated as an optimization problem with the objective of maximizing profits for equipment coordinator, a mathematical model for shared equipment planning is developed. Finally a case study is discussed to show the effectiveness of the planning model.展开更多
Learning is widely used in intelligent planning to shorten the planning process or improve the plan quality. This paper aims at introducing learning and fatigue into the classical hierarchical task network (HTN) pla...Learning is widely used in intelligent planning to shorten the planning process or improve the plan quality. This paper aims at introducing learning and fatigue into the classical hierarchical task network (HTN) planning process so as to create better high- quality plans quickly. The process of HTN planning is mapped during a depth-first search process in a problem-solving agent, and the models of learning in HTN planning is conducted similar to the learning depth-first search (LDFS). Based on the models, a learning method integrating HTN planning and LDFS is presented, and a fatigue mechanism is introduced to balance exploration and exploitation in learning. Finally, experiments in two classical do- mains are carried out in order to validate the effectiveness of the proposed learning and fatigue inspired method.展开更多
This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we pr...This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we propose a mixed integer programming model solved by a Branch-Band and Heuristic Search method.Finally,the simulation result is given and analyzed.The planning method based on a mixed integer programming model can save 20 percentage of the overall planning cost,compared with the greedy algorithm.The relationship between the convergence network planning cost and frequency usage is also analyzed.The optimized planning result with the lowest cost can be acquired through the best frequency usage.展开更多
Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of co...Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples.展开更多
This study addresses a new charging station network planning problem for smart connected electric vehicles.We embed a charging station choice model into a charging network planning model that explicitly considers the ...This study addresses a new charging station network planning problem for smart connected electric vehicles.We embed a charging station choice model into a charging network planning model that explicitly considers the heterogeneity of the charging behavior in a data-driven manner.To cope with the deficiencies from a small size and sparse behavioral data,we propose a robust charging demand prediction method that can significantly reduce the impact of sample errors and missing data.On the basis of these two building blocks,we form and solve a new optimal charging station location and capacity problem by minimizing the construction and charging costs while considering the charging service level,construction budget,and limit to the number of chargers.We use a case study of planning charging stations in Shanghai to validate our contributions and provide managerial insight in this area.展开更多
For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribu...For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost.Compared with the traditional energy network,the equipment capacity problem of energy interconnected distribution network which involves in electricity network,thermal energy network and natural gas network is comprehensively considered in this paper.On this basis,firstly,the operation architecture of energy interconnected distribution network is designed.Secondly,taking the grid connection location and configuration capacity of key equipment in the system as the control variables and the operation cost of system comprehensive planning in the whole life cycle as the goal,the equipment location and capacity optimization model of energy interconnected distribution network is established.Finally,an IEEE 33 bus energy mutual distribution grid system is taken for example analysis,and the improved chaotic particle swarmoptimization algorithm is used to solve it.The simulation results show that the method proposed in this paper is suitable for the equipment location and capacity planning of energy interconnected distribution network,and it can effectively improve the social and economic benefits of system operation.展开更多
文摘Theauthor proposes a dual layer source grid load storage collaborative planning model based on Benders decomposition to optimize the low-carbon and economic performance of the distribution network.The model plans the configuration of photovoltaic(3.8 MW),wind power(2.5 MW),energy storage(2.2 MWh),and SVC(1.2 Mvar)through interaction between upper and lower layers,and modifies lines 2–3,8–9,etc.to improve transmission capacity and voltage stability.The author uses normal distribution and Monte Carlo method to model load uncertainty,and combines Weibull distribution to describe wind speed characteristics.Compared to the traditional three-layer model(TLM),Benders decomposition-based two-layer model(BLBD)has a 58.1%reduction in convergence time(5.36 vs.12.78 h),a 51.1%reduction in iteration times(23 vs.47 times),a 8.07%reduction in total cost(12.436 vs.13.528 million yuan),and a 9.62%reduction in carbon emissions(12,456 vs.13,782 t).After optimization,the peak valley difference decreased from4.1 to 2.9MW,the renewable energy consumption rate reached 93.4%,and the energy storage efficiency was 87.6%.Themodel has been validated in the IEEE 33 node system,demonstrating its superiority in terms of economy,low-carbon,and reliability.
文摘The adoption of 5G for Railways(5G-R)is expanding,particularly in high-speed trains,due to the benefits offered by 5G technology.High-speed trains must provide seamless connectivity and Quality of Service(QoS)to ensure passengers have a satisfactory experience throughout their journey.Installing base stations along urban environments can improve coverage but can dramatically reduce the experience of users due to interference.In particular,when a user with a mobile phone is a passenger in a high speed train traversing between urban centres,the coverage and the 5G resources in general need to be adequate not to diminish her experience of the service.The utilization of macro,pico,and femto cells may optimize the utilization of 5G resources.In this paper,a Genetic Algorithm(GA)-based approach to address the challenges of 5G network planning for 5G-R services is presented.The network is divided into three cell types,macro,pico,and femto cells—and the optimization process is designed to achieve a balance between key objectives:providing comprehensive coverage,minimizing interference,and maximizing energy efficiency.The study focuses on environments with high user density,such as high-speed trains,where reliable and high-quality connectivity is critical.Through simulations,the effectiveness of the GA-driven framework in optimizing coverage and performance in such scenarios is demonstrated.The algorithm is compared with the Particle Swarm Optimisation(PSO)and the Simulated Annealing(SA)methods and interesting insights emerged.The GA offers a strong balance between coverage and efficiency,achieving significantly higher coverage than PSO while maintaining competitive energy efficiency and interference levels.Its steady fitness improvement and adaptability make it well-suited for scenarios where wide coverage is a priority alongside acceptable performance trade-offs.
基金supported in part by the National Natural Science Foundation of China under Grant 52307134the Fundamental Research Funds for the Central Universities(xzy012025022)。
文摘Active distribution network(ADN)planning is crucial for achieving a cost-effective transition to modern power systems,yet it poses significant challenges as the system scale increases.The advent of quantum computing offers a transformative approach to solve ADN planning.To fully leverage the potential of quantum computing,this paper proposes a photonic quantum acceleration algorithm.First,a quantum-accelerated framework for ADN planning is proposed on the basis of coherent photonic quantum computers.The ADN planning model is then formulated and decomposed into discrete master problems and continuous subproblems to facilitate the quantum optimization process.The photonic quantum-embedded adaptive alternating direction method of multipliers(PQA-ADMM)algorithm is subsequently proposed to equivalently map the discrete master problem onto a quantum-interpretable model,enabling its deployment on a photonic quantum computer.Finally,a comparative analysis with various solvers,including Gurobi,demonstrates that the proposed PQA-ADMM algorithm achieves significant speedup on the modified IEEE 33-node and IEEE 123-node systems,highlighting its effectiveness.
基金This research was funded by“Chunhui Program”Collaborative Scientific Research Project of the Ministry of Education of the People’s Republic of China(Project No.HZKY20220242)the S&T Program of Hebei(Project No.225676163GH).
文摘Rational distribution network planning optimizes power flow distribution,reduces grid stress,enhances voltage quality,promotes renewable energy utilization,and reduces costs.This study establishes a distribution network planning model incorporating distributed wind turbines(DWT),distributed photovoltaics(DPV),and energy storage systems(ESS).K-means++is employed to partition the distribution network based on electrical distance.Considering the spatiotemporal correlation of distributed generation(DG)outputs in the same region,a joint output model of DWT and DPV is developed using the Frank-Copula.Due to the model’s high dimensionality,multiple constraints,and mixed-integer characteristics,bilevel programming theory is utilized to structure the model.The model is solved using a mixed-integer particle swarmoptimization algorithm(MIPSO)to determine the optimal location and capacity of DG and ESS integrated into the distribution network to achieve the best economic benefits and operation quality.The proposed bilevel planning method for distribution networks is validated through simulations on the modified IEEE 33-bus system.The results demonstrate significant improvements,with the proposedmethod reducing the annual comprehensive cost by 41.65%and 13.98%,respectively,compared to scenarios without DG and ESS or with only DG integration.Furthermore,it reduces the daily average voltage deviation by 24.35%and 10.24%and daily network losses by 55.72%and 35.71%.
文摘The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...
文摘In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.
基金supported by the Science and Technology Project of China Southern Power Grid(GZHKJXM20210043-080041KK52210002).
文摘Traditional distribution network planning relies on the professional knowledge of planners,especially when analyzing the correlations between the problems existing in the network and the crucial influencing factors.The inherent laws reflected by the historical data of the distribution network are ignored,which affects the objectivity of the planning scheme.In this study,to improve the efficiency and accuracy of distribution network planning,the characteristics of distribution network data were extracted using a data-mining technique,and correlation knowledge of existing problems in the network was obtained.A data-mining model based on correlation rules was established.The inputs of the model were the electrical characteristic indices screened using the gray correlation method.The Apriori algorithm was used to extract correlation knowledge from the operational data of the distribution network and obtain strong correlation rules.Degree of promotion and chi-square tests were used to verify the rationality of the strong correlation rules of the model output.In this study,the correlation relationship between heavy load or overload problems of distribution network feeders in different regions and related characteristic indices was determined,and the confidence of the correlation rules was obtained.These results can provide an effective basis for the formulation of a distribution network planning scheme.
基金Project(2009CB219703) supported by the National Basic Research Program of ChinaProject(2011AA05A117) supported by the National High Technology Research and Development Program of China
文摘In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two steps in the method:the first step was that the shortest paths along streets between substation and load points were found by the basic ant colony algorithm to form a preliminary radial distribution network,and the second step was that the result of the shortest path was used to initialize pheromone concentration and pheromone updating rules to generate globally optimal distribution network.Cases studies show that the proposed method is effective and can meet the planning requirements.It is verified that the proposed method has better solution and utility than planning method based on the ant colony algorithm.
文摘Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.
文摘Making use of Microsoft Visual Studio.NET platform,hierarchical network planning is realized in working procedure time-optimization of the construction by TBM,and hierarchical network graph of the construction by TBM is drawn based on browser.Then the theory of system realization is discussed,six components of system that can be reused are explained emphatically.The realization of hierarchical network panning in Internet provides available guarantee for controlling rate of progress in large-scale or middle-sized projects.
文摘The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.
基金Supported by Major State Basic Research Program of China ("973" Program,No. 2009CB219700 and No. 2010CB23460)Tianjin Municipal Science and Technology Development Program (No. 09JCZDJC25000)Specialized Research Fund for the Doctoral Program of Higher Education of China (No.20090032110064)
文摘In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year.
基金supported by the 12th fiveyear National Science and Technology plan of China (2012BAC01B03)
文摘The broad-leaved Korean pine(Pinus koraiensis) forest is one of the most biodiverse zonal communities in the North Temperate Zone and an important habitat for many endangered species.Broad-leaved Korean pine forests(BKPFs) are shrinking quickly due to deforestation and rapid urbanization. Thus, scientific protection strategies are urgently needed to change this status. Changbai Mountains contains one of the largest BKPFs and is considered a priority biodiversity conservation area in China. Guided by systematic conservation planning(SCP) methods and procedures, we chose representative species and communities in BKPFs ecosystem as priority conservation objects, and set quantitative conservation target, which is in the light of the biodiversity characteristic of BKPFs. The watershed area is used as planning unit. We used CPlan software to calculate the irreplaceability(Ir)value of each planning unit and the contribution value(Ti) of each conservation object to(1) assess the conservation efficiency;(2) identify the conservation gap of the existing conservation network. Then wecalculated a human disturbance index(HDI) for planning units in the conservation gaps and combine this with the Ir value to design three conservation scenarios to optimize the conservation network.Results show that planning units with high conservation value 14.16% of the total area, with3084.36 km2 were covered by the existing conservation network. 79.28% of planning units with high conservation value have not been protected which were concentrated mainly in the eight gap areas.Only 25.3% of protection objects achieved their conservation target with the existing conservation network. Conservation efficiency is low. Three conservation scenarios are constituted, each prioritizing a different aim:(1) ecological value;(2)species rescue; and(3) economical avoidance. The three conservation schemes potentially enable 93%,88% and 51% of conservation objects, respectively, to achieve identified conservation targets, thereby improving conservation efficiency significantly.
基金This work was fully supported by U Nyi Hla Nge Foundation at Yangon Technological University,Gyogone,Insein PO,11011,Yangon,Myanmar。
文摘The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.
基金This project is supported by National Hi-tech Research and Development Program of China (863 Program, No. 2005AA411040)Chongqing University Graduate Innovation Foundation, China (No. 200506Z1B0270134)
文摘Efficient utilization of the equipment distributed in different enterprises and optimal allocation of these resources is an important concern for networked manufacturing. The third party based equipment sharing approach is put forward to optimize the utilization of distributed equipment for networked manufacturing; Taking advantage of the shared equipment offered by equipment providers by means of lease agreement, the third party carries out production by establishing networked virtual factory. Operational mechanism of the third party based equipment sharing is discussed, and characteristics of this approach in achieving resource allocation are analyzed. Shared equipment planning is formulated as an optimization problem with the objective of maximizing profits for equipment coordinator, a mathematical model for shared equipment planning is developed. Finally a case study is discussed to show the effectiveness of the planning model.
文摘Learning is widely used in intelligent planning to shorten the planning process or improve the plan quality. This paper aims at introducing learning and fatigue into the classical hierarchical task network (HTN) planning process so as to create better high- quality plans quickly. The process of HTN planning is mapped during a depth-first search process in a problem-solving agent, and the models of learning in HTN planning is conducted similar to the learning depth-first search (LDFS). Based on the models, a learning method integrating HTN planning and LDFS is presented, and a fatigue mechanism is introduced to balance exploration and exploitation in learning. Finally, experiments in two classical do- mains are carried out in order to validate the effectiveness of the proposed learning and fatigue inspired method.
基金supported by National High Technical Research and Development Program of China(863 program)under Grant No.2009AA01A345Fundamental Research Funds for the Central Universities under Grant No.BUPT2009RC0402
文摘This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we propose a mixed integer programming model solved by a Branch-Band and Heuristic Search method.Finally,the simulation result is given and analyzed.The planning method based on a mixed integer programming model can save 20 percentage of the overall planning cost,compared with the greedy algorithm.The relationship between the convergence network planning cost and frequency usage is also analyzed.The optimized planning result with the lowest cost can be acquired through the best frequency usage.
基金the National Natural Science Founda-tion of China (No. 50177017)the Shanghai Key Scienceand Technology Research Program (No. 041612012)
文摘Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples.
基金the National Natural Science Founda-tion of China(Nos.72171175,and 72021102)。
文摘This study addresses a new charging station network planning problem for smart connected electric vehicles.We embed a charging station choice model into a charging network planning model that explicitly considers the heterogeneity of the charging behavior in a data-driven manner.To cope with the deficiencies from a small size and sparse behavioral data,we propose a robust charging demand prediction method that can significantly reduce the impact of sample errors and missing data.On the basis of these two building blocks,we form and solve a new optimal charging station location and capacity problem by minimizing the construction and charging costs while considering the charging service level,construction budget,and limit to the number of chargers.We use a case study of planning charging stations in Shanghai to validate our contributions and provide managerial insight in this area.
基金The authors received specific funding for State Grid Corporation Headquarters Project Support,Key Technologies and Applications of Planning and Decision-Making Based on the Full Cost Chain of the Power Grid,Grant No.5205331800001.
文摘For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost.Compared with the traditional energy network,the equipment capacity problem of energy interconnected distribution network which involves in electricity network,thermal energy network and natural gas network is comprehensively considered in this paper.On this basis,firstly,the operation architecture of energy interconnected distribution network is designed.Secondly,taking the grid connection location and configuration capacity of key equipment in the system as the control variables and the operation cost of system comprehensive planning in the whole life cycle as the goal,the equipment location and capacity optimization model of energy interconnected distribution network is established.Finally,an IEEE 33 bus energy mutual distribution grid system is taken for example analysis,and the improved chaotic particle swarmoptimization algorithm is used to solve it.The simulation results show that the method proposed in this paper is suitable for the equipment location and capacity planning of energy interconnected distribution network,and it can effectively improve the social and economic benefits of system operation.