This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we...This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project.展开更多
Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of r...Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of requirement gathering via prototyping.After each iteration,the developers can validate the requirements that are completed in the iteration.Managing a project with RAD is easier but not flexible.On the other hand,Agile project management techniques focus on flexibility,agility,teamwork and quality based on user stories.Continual user involvement is avoided,which requires extensive maintenance time for fixing iteration and release of the story points.This also makes it necessary to provide onsite training to the users of the application.This research provides the pros and cons of RAD and Agile project management techniques,to help students in deciding the best approach for managing their graduation projects.For the evaluation of these techniques,similar case studies were given to the senior project students(having similar CGPAs)for building similar functionality-based applications.The two projects“Life Organizer”developed and managed using RAD and“Smart Patient Assistant(SPA)”developed and managed through Agile methodology were evaluated against the quality assurance criteria for senior projects.The study found that the project developed with RAD methodology performed 13.33%better in providing extensive and elaborated documentation than the students following the Agile technique.On the other hand,SPA-Agile based project,due to teamwork had 2.5%better implementation than Life Organizer-RAD based project.展开更多
This paper proposes an innovative supervision method that can provide project supervisors with realtime supervision of engineering projects and contractor activity. To obtain real-time and comprehensive state of proje...This paper proposes an innovative supervision method that can provide project supervisors with realtime supervision of engineering projects and contractor activity. To obtain real-time and comprehensive state of project, we use grid management to divide the project supervision grid in three levels: stage, objective, and milestone. Then, a detailed supervision mechanism is designed to help supervisors measure the project situation in real time. This mechanism checks that if the project objectives(such as schedule, cost, quality, and safety) in every supervision grid cell are under the healthy limits, any project deviation can be identified as soon as possible.A schedule objective is selected as an example to illustrate the method used to calculate the healthy limit.展开更多
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi...This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.展开更多
Water conservancy engineering occupies a very important position in the economic development of our country. In order to realize the management of engineering quality, it is necessary to strengthen the control of proj...Water conservancy engineering occupies a very important position in the economic development of our country. In order to realize the management of engineering quality, it is necessary to strengthen the control of project cost, reduce cost waste, enhance safety consciousness in engineering construction, improve the comprehensive quality of management staff and strengthen the management of water conservancy project quality. Only by reasonably controlling the quality of each link in the project can the construction of water conservancy project be realized smoothly and the overall quality of water conservancy project is ensured.展开更多
The irrigation and water conservancy project provides the basic guarantee for the rural agricultural economic development, and requires greater function and effect in water supply, drainage, waterlogging, drought prev...The irrigation and water conservancy project provides the basic guarantee for the rural agricultural economic development, and requires greater function and effect in water supply, drainage, waterlogging, drought prevention, irrigation and other farmland services. However, there are still some problems in the management of farmland water conservancy project, such as imperfect system, unclear responsibility and inactive subject, which hinder the development of farmland water conservancy project to a certain extent. In the context of building a new countryside, the management of irrigation and water conservancy projects should implement and Xi Jining New Era Socialism with Chinese Characteristics, adhere to the concept of scientific development, focus on the overall situation, seek benefits from management, and promote the high-quality development of project management.展开更多
Currently,the investment of oil and gas industry is still facing an unfavorable environment,in which,instable factors,such as financial crisis,terrorist,religious conflicts and rigorous environmental regulations,keep ...Currently,the investment of oil and gas industry is still facing an unfavorable environment,in which,instable factors,such as financial crisis,terrorist,religious conflicts and rigorous environmental regulations,keep mucking up the business all around the world.Meanwhile,China’s rapid energy consumption growth boosted by a booming economy has put the country to rely heavily on exported oil.It is therefore extremely urgent to expand and diversify petroleum supply channel in consideration of the country’s energy security.As the world’s economy has been slowly recovering from the slump and展开更多
We propose a hybrid and contingent approach to the management of digital projects,based on the assumption that there is not an absolute best way,but the approach should fit context and environment.The pillars of our c...We propose a hybrid and contingent approach to the management of digital projects,based on the assumption that there is not an absolute best way,but the approach should fit context and environment.The pillars of our contingent framework are Agile methodologies,predictive project management,and AI.The analysis of project management methodologies is based on a layered project model.Specifically,we identify 4 project concentric layers for both Agile and predictive project management.That layered model allows us to deploy different methodologies consistently with the distinct characteristics of each project.We describe the key characteristics of each approach and,also,we map Agile methodologies on the sociotechnical profile of projects.Finally,we summarize the impact of AI on predictive and hybrid projects.展开更多
Under the background of training practical compound talents in software engineering,this paper analyzes the problems existing in the current teaching of software engineering courses represented by software project man...Under the background of training practical compound talents in software engineering,this paper analyzes the problems existing in the current teaching of software engineering courses represented by software project management,puts forward the team task mechanism of software engineering courses with AI empowerment and cooperation and competition,develops a unified project management platform to support the implementation of team tasks,and proves the effectiveness of the scheme through the results obtained.展开更多
With the continuous adjustment of the energy structure,photovoltaic(PV)power generation projects are increasing,playing a crucial role in promoting the application of clean energy.However,the current audit of complete...With the continuous adjustment of the energy structure,photovoltaic(PV)power generation projects are increasing,playing a crucial role in promoting the application of clean energy.However,the current audit of completed final accounts for photovoltaic power generation projects faces many challenges,such as incomplete institutional processes,scattered archive management materials,inadequate digital intelligence systems,and insufficient analysis of final account amounts.Based on this,this article aims to deeply analyze these issues and propose targeted audit suggestions to standardize the construction and audit work of photovoltaic power generation projects and promote the sustainable and healthy development of the photovoltaic power generation business.展开更多
IT SMEs as an important force can promote scientific and technological innovation and economic development,the effectiveness of project quality management mechanism is directly related to the survival and development ...IT SMEs as an important force can promote scientific and technological innovation and economic development,the effectiveness of project quality management mechanism is directly related to the survival and development of IT SMEs.This paper take IT SMEs as the research object,which deeply discusses the situation,existing problems and improvement strategies of the project quality management mechanism,and combines agile management and total quality management(TQM)theories to build a dynamic and adaptive project quality management mechanism.Through deeply analysis,the effectiveness of the mechanism is proposed,and the optimization path is proposed,aiming at providing theoretical support and practical guidance for enterprises to improve project delivery quality and enhance market competitiveness.展开更多
In the project procurement management process of telecommunication enterprises,due to the complexity of technology,the professional procurement project manager is responsible for the whole process of professional proc...In the project procurement management process of telecommunication enterprises,due to the complexity of technology,the professional procurement project manager is responsible for the whole process of professional procurement in a one-stop way.The integration of this management process superficially improves labor productivity,but in essence lacks effective checks and balances and supervision.In order to supervise the project procurement management process and ensure the legal compliance of procurement management,this paper studies the project procurement management process of telecommunication enterprises,proposes the optimization process of project procurement management in the segmentation of purchasing manager-business manager,and constructs a matrix project procurement management model,which will contribute to the overall improvement of the telecommunication enterprises’procurement performance.展开更多
The construction projects’ dynamic and interconnected nature requires a comprehensive understanding of complexity during pre-construction. Traditional tools such as Gantt charts, CPM, and PERT often overlook uncertai...The construction projects’ dynamic and interconnected nature requires a comprehensive understanding of complexity during pre-construction. Traditional tools such as Gantt charts, CPM, and PERT often overlook uncertainties. This study identifies 20 complexity factors through expert interviews and literature, categorising them into six groups. The Analytical Hierarchy Process evaluated the significance of different factors, establishing their corresponding weights to enhance adaptive project scheduling. A system dynamics (SD) model is developed and tested to evaluate the dynamic behaviour of identified complexity factors. The model simulates the impact of complexity on total project duration (TPD), revealing significant deviations from initial deterministic estimates. Data collection and analysis for reliability tests, including normality and Cronbach alpha, to validate the model’s components and expert feedback. Sensitivity analysis confirmed a positive relationship between complexity and project duration, with higher complexity levels resulting in increased TPD. This relationship highlights the inadequacy of static planning approaches and underscores the importance of addressing complexity dynamically. The study provides a framework for enhancing planning systems through system dynamics and recommends expanding the model to ensure broader applicability in diverse construction projects.展开更多
Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems a...Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneously, a time & cost risk control model based on schedule programme was established with the use of the quantitativemodels of BCWS, BCWP and ACWP in this paper. Subsequently, the analysis of variance for the whole project and the single activity was introduced on the basis of BCWS, BCWP and ACWP so that the project can be controlled and managed effectively. Furthermore, an example given behind in detail expressly illustrated that the model set up above was practicableto project management. However, the method of optimizing the cash flow based on time and cost risk to obtain BCWS should be considered properlyand carefully with respect to the different circumstances of the project, and an efficient and adequate interval report system should be set up on the site of the project.展开更多
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ...The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.展开更多
The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems...The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock.展开更多
Project portfolio management(PPM) is the centralized management method, process and technology in multiple projects. When multiple projects in the space industry are implemented, it provides an effective methodology t...Project portfolio management(PPM) is the centralized management method, process and technology in multiple projects. When multiple projects in the space industry are implemented, it provides an effective methodology to resolve the problems at the same time such as conflicts among models, decrease in design efficiency,and increase in target deviation. Hence, a PPM dedicated to multiple projects management in space enterprise is presented in this paper. Firstly, an analysis of features and contents in space enterprise portfolio management mode is performed by using PPM based on its specific strategic characteristics. Then, the principle and selection methods of PPM are provided as a reference for the future development of an enterprise. Finally, a multiple-level organization architecture including decision making layers, function management layers and project execution layers is proposed so as to adapt to possible changes in the multiple projects and correspond to the strategic development. As a consequence, a perfect matching mechanism to fit the changes in PPM modes is reached. In addition, the flow chart of PPM is designed and optimized by analyzing the implementation procedure of strategic target and project portfolio life-cycle, which is expected to realize the purpose of improving space enterprise management efficiency, project management capacity, innovation development and economic benefits.展开更多
This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of...This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of multi-round procurement problem in software project management.To this end,we introduce an approach that proposes:(i)A Game-theoretic model of multiround procurement problem(ii)A Nash equilibrium strategy corresponds to multi-round strategy bid(iii)An application of PSO for the determination of global Nash equilibrium.The balance point in Nash Equilibrium can help to maintain a sustainable structure not only in terms of project management but also in terms of future cooperation.As an alternative of procuring entities subjectively,a methodology to support decision making has been studied using Nash equilibrium to create a balance point on benefit in procurement where buyers and suppliers need multiple rounds of bidding.Our goal focus on the balance point in Nash Equilibrium to optimizing bidder selection in multi-round procurement which is the most beneficial for both investors and selected tenderers.Our PMMAS algorithm is implemented based on MPI(message passing interface)to find the approximate optimal solution for the question of how to choose bidders and ensure a path for a win-win relationship of all participants in the procurement process.We also evaluate the speedup ratio and parallel efficiency between our algorithm and other proposed algorithms.As the experiment results,the high feasibility and effectiveness of the PMMAS algorithm are verified.展开更多
Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty...Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty” interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective, and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.展开更多
Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its gre...Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes.展开更多
基金Project partially supported by the Spanish Ministry of Science and Innovation (No.BIA2011-23602)the European Community with the European Regional Development Fund (FEDER),Spain
文摘This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project.
文摘Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of requirement gathering via prototyping.After each iteration,the developers can validate the requirements that are completed in the iteration.Managing a project with RAD is easier but not flexible.On the other hand,Agile project management techniques focus on flexibility,agility,teamwork and quality based on user stories.Continual user involvement is avoided,which requires extensive maintenance time for fixing iteration and release of the story points.This also makes it necessary to provide onsite training to the users of the application.This research provides the pros and cons of RAD and Agile project management techniques,to help students in deciding the best approach for managing their graduation projects.For the evaluation of these techniques,similar case studies were given to the senior project students(having similar CGPAs)for building similar functionality-based applications.The two projects“Life Organizer”developed and managed using RAD and“Smart Patient Assistant(SPA)”developed and managed through Agile methodology were evaluated against the quality assurance criteria for senior projects.The study found that the project developed with RAD methodology performed 13.33%better in providing extensive and elaborated documentation than the students following the Agile technique.On the other hand,SPA-Agile based project,due to teamwork had 2.5%better implementation than Life Organizer-RAD based project.
基金the National Natural Science Foundation of China(No.71271085)the Beijing "12th Five-Year Plan" Project of Philosophy and Social Sciences(No.12JGB044)
文摘This paper proposes an innovative supervision method that can provide project supervisors with realtime supervision of engineering projects and contractor activity. To obtain real-time and comprehensive state of project, we use grid management to divide the project supervision grid in three levels: stage, objective, and milestone. Then, a detailed supervision mechanism is designed to help supervisors measure the project situation in real time. This mechanism checks that if the project objectives(such as schedule, cost, quality, and safety) in every supervision grid cell are under the healthy limits, any project deviation can be identified as soon as possible.A schedule objective is selected as an example to illustrate the method used to calculate the healthy limit.
文摘This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.
文摘Water conservancy engineering occupies a very important position in the economic development of our country. In order to realize the management of engineering quality, it is necessary to strengthen the control of project cost, reduce cost waste, enhance safety consciousness in engineering construction, improve the comprehensive quality of management staff and strengthen the management of water conservancy project quality. Only by reasonably controlling the quality of each link in the project can the construction of water conservancy project be realized smoothly and the overall quality of water conservancy project is ensured.
文摘The irrigation and water conservancy project provides the basic guarantee for the rural agricultural economic development, and requires greater function and effect in water supply, drainage, waterlogging, drought prevention, irrigation and other farmland services. However, there are still some problems in the management of farmland water conservancy project, such as imperfect system, unclear responsibility and inactive subject, which hinder the development of farmland water conservancy project to a certain extent. In the context of building a new countryside, the management of irrigation and water conservancy projects should implement and Xi Jining New Era Socialism with Chinese Characteristics, adhere to the concept of scientific development, focus on the overall situation, seek benefits from management, and promote the high-quality development of project management.
文摘Currently,the investment of oil and gas industry is still facing an unfavorable environment,in which,instable factors,such as financial crisis,terrorist,religious conflicts and rigorous environmental regulations,keep mucking up the business all around the world.Meanwhile,China’s rapid energy consumption growth boosted by a booming economy has put the country to rely heavily on exported oil.It is therefore extremely urgent to expand and diversify petroleum supply channel in consideration of the country’s energy security.As the world’s economy has been slowly recovering from the slump and
文摘We propose a hybrid and contingent approach to the management of digital projects,based on the assumption that there is not an absolute best way,but the approach should fit context and environment.The pillars of our contingent framework are Agile methodologies,predictive project management,and AI.The analysis of project management methodologies is based on a layered project model.Specifically,we identify 4 project concentric layers for both Agile and predictive project management.That layered model allows us to deploy different methodologies consistently with the distinct characteristics of each project.We describe the key characteristics of each approach and,also,we map Agile methodologies on the sociotechnical profile of projects.Finally,we summarize the impact of AI on predictive and hybrid projects.
文摘Under the background of training practical compound talents in software engineering,this paper analyzes the problems existing in the current teaching of software engineering courses represented by software project management,puts forward the team task mechanism of software engineering courses with AI empowerment and cooperation and competition,develops a unified project management platform to support the implementation of team tasks,and proves the effectiveness of the scheme through the results obtained.
文摘With the continuous adjustment of the energy structure,photovoltaic(PV)power generation projects are increasing,playing a crucial role in promoting the application of clean energy.However,the current audit of completed final accounts for photovoltaic power generation projects faces many challenges,such as incomplete institutional processes,scattered archive management materials,inadequate digital intelligence systems,and insufficient analysis of final account amounts.Based on this,this article aims to deeply analyze these issues and propose targeted audit suggestions to standardize the construction and audit work of photovoltaic power generation projects and promote the sustainable and healthy development of the photovoltaic power generation business.
基金Young and Middle-aged Teachers’Basic Research Ability Improvement Project of Universities in Guangxi 2024Research on Coordinated Development of Smart Tourism and Rural Revitalization in Southwest China(Project No.:24KY0655)。
文摘IT SMEs as an important force can promote scientific and technological innovation and economic development,the effectiveness of project quality management mechanism is directly related to the survival and development of IT SMEs.This paper take IT SMEs as the research object,which deeply discusses the situation,existing problems and improvement strategies of the project quality management mechanism,and combines agile management and total quality management(TQM)theories to build a dynamic and adaptive project quality management mechanism.Through deeply analysis,the effectiveness of the mechanism is proposed,and the optimization path is proposed,aiming at providing theoretical support and practical guidance for enterprises to improve project delivery quality and enhance market competitiveness.
文摘In the project procurement management process of telecommunication enterprises,due to the complexity of technology,the professional procurement project manager is responsible for the whole process of professional procurement in a one-stop way.The integration of this management process superficially improves labor productivity,but in essence lacks effective checks and balances and supervision.In order to supervise the project procurement management process and ensure the legal compliance of procurement management,this paper studies the project procurement management process of telecommunication enterprises,proposes the optimization process of project procurement management in the segmentation of purchasing manager-business manager,and constructs a matrix project procurement management model,which will contribute to the overall improvement of the telecommunication enterprises’procurement performance.
文摘The construction projects’ dynamic and interconnected nature requires a comprehensive understanding of complexity during pre-construction. Traditional tools such as Gantt charts, CPM, and PERT often overlook uncertainties. This study identifies 20 complexity factors through expert interviews and literature, categorising them into six groups. The Analytical Hierarchy Process evaluated the significance of different factors, establishing their corresponding weights to enhance adaptive project scheduling. A system dynamics (SD) model is developed and tested to evaluate the dynamic behaviour of identified complexity factors. The model simulates the impact of complexity on total project duration (TPD), revealing significant deviations from initial deterministic estimates. Data collection and analysis for reliability tests, including normality and Cronbach alpha, to validate the model’s components and expert feedback. Sensitivity analysis confirmed a positive relationship between complexity and project duration, with higher complexity levels resulting in increased TPD. This relationship highlights the inadequacy of static planning approaches and underscores the importance of addressing complexity dynamically. The study provides a framework for enhancing planning systems through system dynamics and recommends expanding the model to ensure broader applicability in diverse construction projects.
文摘Time, cost and quality are the three main targets to be controled in project management. However, the control and management of time and cost risk are usually carried out respectively, which will bring such problems as the delay of schedule by reason of the impracticability of cash flow, the money difficulties caused by delay of schedule and so on. In order to control and manage the time and cost risk effectively and simultaneously, a time & cost risk control model based on schedule programme was established with the use of the quantitativemodels of BCWS, BCWP and ACWP in this paper. Subsequently, the analysis of variance for the whole project and the single activity was introduced on the basis of BCWS, BCWP and ACWP so that the project can be controlled and managed effectively. Furthermore, an example given behind in detail expressly illustrated that the model set up above was practicableto project management. However, the method of optimizing the cash flow based on time and cost risk to obtain BCWS should be considered properlyand carefully with respect to the different circumstances of the project, and an efficient and adequate interval report system should be set up on the site of the project.
基金supported by the Fundamental Research Funds for the Central Universities(Grant No.2013B102008)the Open Fund of the Yellow River Committee(Grant No.2011535012)
文摘The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.
文摘The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock.
基金the National Natural Science Foundation of China(No.71172123)the Aviation Science Fund of China(No.2012ZG53083)
文摘Project portfolio management(PPM) is the centralized management method, process and technology in multiple projects. When multiple projects in the space industry are implemented, it provides an effective methodology to resolve the problems at the same time such as conflicts among models, decrease in design efficiency,and increase in target deviation. Hence, a PPM dedicated to multiple projects management in space enterprise is presented in this paper. Firstly, an analysis of features and contents in space enterprise portfolio management mode is performed by using PPM based on its specific strategic characteristics. Then, the principle and selection methods of PPM are provided as a reference for the future development of an enterprise. Finally, a multiple-level organization architecture including decision making layers, function management layers and project execution layers is proposed so as to adapt to possible changes in the multiple projects and correspond to the strategic development. As a consequence, a perfect matching mechanism to fit the changes in PPM modes is reached. In addition, the flow chart of PPM is designed and optimized by analyzing the implementation procedure of strategic target and project portfolio life-cycle, which is expected to realize the purpose of improving space enterprise management efficiency, project management capacity, innovation development and economic benefits.
基金Vietnam National Foundation for Science and TechnologyDevelopment(NAFOSTED)under grant number 102.03-2019.10.
文摘This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of multi-round procurement problem in software project management.To this end,we introduce an approach that proposes:(i)A Game-theoretic model of multiround procurement problem(ii)A Nash equilibrium strategy corresponds to multi-round strategy bid(iii)An application of PSO for the determination of global Nash equilibrium.The balance point in Nash Equilibrium can help to maintain a sustainable structure not only in terms of project management but also in terms of future cooperation.As an alternative of procuring entities subjectively,a methodology to support decision making has been studied using Nash equilibrium to create a balance point on benefit in procurement where buyers and suppliers need multiple rounds of bidding.Our goal focus on the balance point in Nash Equilibrium to optimizing bidder selection in multi-round procurement which is the most beneficial for both investors and selected tenderers.Our PMMAS algorithm is implemented based on MPI(message passing interface)to find the approximate optimal solution for the question of how to choose bidders and ensure a path for a win-win relationship of all participants in the procurement process.We also evaluate the speedup ratio and parallel efficiency between our algorithm and other proposed algorithms.As the experiment results,the high feasibility and effectiveness of the PMMAS algorithm are verified.
文摘Starting with the meanings of the terms “risk” and “uncertainty,””he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of “risk” and “uncertainty” interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective, and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.
文摘Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes.