This paper presents a quasi-static implicit generalized interpolation material point method(i GIMP)with B-bar approach for large deformation geotechnical problems.The i GIMP algorithm is an extension of the implicit m...This paper presents a quasi-static implicit generalized interpolation material point method(i GIMP)with B-bar approach for large deformation geotechnical problems.The i GIMP algorithm is an extension of the implicit material point method(iMPM).The global stiffness matrix is formed explicitly and the Newton-Raphson iterative method is used to solve the equilibrium equations.Where possible,the implementation procedure closely follows standard finite element method(FEM)approaches to allow easy conversion of other FEM codes.The generalized interpolation function is assigned to eliminate the inherent cell crossing noise within conventional MPM.For the first time,the B-bar approach is used to overcome volumetric locking in standard GIMP method for near-incompressible non-linear geomechanics.The proposed i GIMP was tested and compared with i MPM and analytical solutions via a 1 D column compression problem.Results highlighted the superiority of the i GIMP approach in reducing stress oscillations,thereby improving computational accuracy.Then,elasto-plastic slope stabilities and rigid footing problems were considered,further illustrating the ability of the proposed method to overcome volumetric locking due to incompressibility.Results showed that the proposed i GIMP with B-bar approach can be used to simulate geotechnical problems with large deformations.展开更多
The time delay estimation (TDE) of two different received signals from the same source has attracted many interests of researchers in the field of signal processing. A method described for precisely estimating time de...The time delay estimation (TDE) of two different received signals from the same source has attracted many interests of researchers in the field of signal processing. A method described for precisely estimating time delay in this paper is based on the assumption that little priori knowledge on statistical characteristics is available for the received signals. The variance of the estimate is derived . The basic architecture of this method is to use the adaptive noise canceller, in the steady state , and to interpolate the weight coefficients by using a generalized quadratic interpolation matrix. The formula of the time delay estimation is presented . The method proposed by F.A. Reed is a special case of this method . The hardware implementation is much easier than that of the conventional time delay estimation method . The results of the system simulation and the experimental results at sea show a good agreement with the theoretical analysis.展开更多
基金the National Natural Science Foundation of China(Nos.41807223 and 51908175)the Fundamental Research Funds for the Central Universities(No.B210202096)+1 种基金the Natural Science Foundation of Guangdong Province(No.2018A030310346)the Water Conservancy Science and Technology Innovation Project of Guangdong Province(No.2020-11),China。
文摘This paper presents a quasi-static implicit generalized interpolation material point method(i GIMP)with B-bar approach for large deformation geotechnical problems.The i GIMP algorithm is an extension of the implicit material point method(iMPM).The global stiffness matrix is formed explicitly and the Newton-Raphson iterative method is used to solve the equilibrium equations.Where possible,the implementation procedure closely follows standard finite element method(FEM)approaches to allow easy conversion of other FEM codes.The generalized interpolation function is assigned to eliminate the inherent cell crossing noise within conventional MPM.For the first time,the B-bar approach is used to overcome volumetric locking in standard GIMP method for near-incompressible non-linear geomechanics.The proposed i GIMP was tested and compared with i MPM and analytical solutions via a 1 D column compression problem.Results highlighted the superiority of the i GIMP approach in reducing stress oscillations,thereby improving computational accuracy.Then,elasto-plastic slope stabilities and rigid footing problems were considered,further illustrating the ability of the proposed method to overcome volumetric locking due to incompressibility.Results showed that the proposed i GIMP with B-bar approach can be used to simulate geotechnical problems with large deformations.
文摘The time delay estimation (TDE) of two different received signals from the same source has attracted many interests of researchers in the field of signal processing. A method described for precisely estimating time delay in this paper is based on the assumption that little priori knowledge on statistical characteristics is available for the received signals. The variance of the estimate is derived . The basic architecture of this method is to use the adaptive noise canceller, in the steady state , and to interpolate the weight coefficients by using a generalized quadratic interpolation matrix. The formula of the time delay estimation is presented . The method proposed by F.A. Reed is a special case of this method . The hardware implementation is much easier than that of the conventional time delay estimation method . The results of the system simulation and the experimental results at sea show a good agreement with the theoretical analysis.