FNM method for estimating reliability of existing bridges
1
作者 彭可可 黄培彦 《Journal of Southeast University(English Edition)》 EI CAS 2009年第2期247-251,共5页
Combined with current specifications and stress characteristics of concrete filled steel tubular (CFST) arch bridges, the determination principle of safe-middle-failure threestage mode is given. Accordingly, damage ... Combined with current specifications and stress characteristics of concrete filled steel tubular (CFST) arch bridges, the determination principle of safe-middle-failure threestage mode is given. Accordingly, damage probability and failure probability and the corresponding reliability indices are calculated; a direct relationship between reliability indices and three-stage working status is made. Based on the three-stage working mode, a combined FNM (finite element-neural network- Monte-Carlo simulation) method is put forward to estimate the reliability of existing bridges. According to time-dependent reliability theory, subsequent service time is divided into several stages; minimum samples required by the Monte-Carlo method are generated by random sampling; training samples are calculated by the finite element method, and the training samples are extended by the neural network; failure probability and damage probability are calculated by the Monte-Carlo method. Thus, time dependent reliability indices are obtained, and the working status is judged. A case study is investigated to estimate the reliability of an actual bridge by the FNM method. The bridge is a CFST arch bridge with an 83.6 m span and it has been in operation for 10 years. According to analysis results, in the tenth year, the example bridge is still in safe status. This conclusion is consistent with the facts, which proves the feasibility of the FNM method for estimating the reliability of existing bridges. 展开更多
关键词 existing bridges time-dependent reliability threestage working mode Monte-Carlo simulation fnm method
在线阅读 下载PDF
在役钢筋混凝土拱桥时变可靠度分析 被引量:9
2
作者 彭可可 黄培彦 邓军 《中国铁道科学》 EI CAS CSCD 北大核心 2009年第3期15-20,共6页
结合现行桥涵设计规范及钢筋混凝土拱桥的受力特点,给出钢筋混凝土拱桥"安全—中介—失效"三级工作模式的相应概率。基于时变可靠度理论,将随机有限元、神经网络和蒙特卡罗法结合,提出评估在役桥梁结构可靠度的FNM法,即,用随... 结合现行桥涵设计规范及钢筋混凝土拱桥的受力特点,给出钢筋混凝土拱桥"安全—中介—失效"三级工作模式的相应概率。基于时变可靠度理论,将随机有限元、神经网络和蒙特卡罗法结合,提出评估在役桥梁结构可靠度的FNM法,即,用随机有限元法计算训练样本,再用神经网络扩展训练样本,然后通过蒙特卡罗法计算失效概率和损伤概率,得到结构的时变可靠度,以判断结构的工作状态。对1座建成8年、主跨为80m的钢筋混凝土拱桥进行时变可靠度分析。结果表明:该桥主拱在第8年时,已进入虽有损伤但仍能工作的中介状态,需要维修加固。这一结论与实际情况相符。 展开更多
关键词 钢筋混凝土拱桥 时变可靠度 服役期 三级工作模式 fnm
在线阅读 下载PDF