It is not difficult to find out that cracks in concrete structural engineering are ubiquitous. Because the damage of the structure often begins with cracks, it brings harm and risk to social production and life. Espec...It is not difficult to find out that cracks in concrete structural engineering are ubiquitous. Because the damage of the structure often begins with cracks, it brings harm and risk to social production and life. Especially with the rapid development of my country's capital construction in recent decades, it is very necessary to understand and solve the ancient and novel problem of cracks in concrete structures. With the exploration and research of long-term engineering practice, with the continuous development of technology and productivity, people have realized that the generation of harmful cracks can be controlled through effective technical means. That is to say, through the organic combination of design and construction, the influence of cracks can be prevented from being harmful.展开更多
The pouring of mass concrete and earthwork account for a large proportion in building construction,which can play a decisive role in the quality of the building.Therefore,it is necessary to understand the technology o...The pouring of mass concrete and earthwork account for a large proportion in building construction,which can play a decisive role in the quality of the building.Therefore,it is necessary to understand the technology of earthwork and concrete engineering in the process of building construction and propose reasonable application strategies.展开更多
With the continuous development of China's economy and science, the construction industry has made some progress in the process of development. The quality of site management is obviously conducive to the smooth i...With the continuous development of China's economy and science, the construction industry has made some progress in the process of development. The quality of site management is obviously conducive to the smooth implementation of construction projects. Management must pay attention to the basic requirements of on-site management quality, pay attention to the optimal allocation and resource utilization, actively strengthen the management and coordination of project costs, reduce working hours, fully reflect the important value and role of orderly management, reduce the possibility of quality and safety accidents.展开更多
In order to study the temperature distribution and the corresponding temperature effects on pre-stressed concrete(PC) curved box girder bridge in Shandong Province, this paper builds and adopts an automatic remote r...In order to study the temperature distribution and the corresponding temperature effects on pre-stressed concrete(PC) curved box girder bridge in Shandong Province, this paper builds and adopts an automatic remote real-time temperature collection system to collect temperature data on site, and further uses the software ANSYS for analysis. Based on the comparisons between the measured data and the simulation results, the following conclusions can be drawn: 1 Our temperature monitoring system is reliable; 2 The corresponding measured data of the web plate and flange plate exposed to the sun, vary more severely than that at other positions, so these plates need higher standard design and construction requirements; 3 In the cold wave where still is sunshine, the box girder temperature effect behaves as sine-like curve.展开更多
文摘It is not difficult to find out that cracks in concrete structural engineering are ubiquitous. Because the damage of the structure often begins with cracks, it brings harm and risk to social production and life. Especially with the rapid development of my country's capital construction in recent decades, it is very necessary to understand and solve the ancient and novel problem of cracks in concrete structures. With the exploration and research of long-term engineering practice, with the continuous development of technology and productivity, people have realized that the generation of harmful cracks can be controlled through effective technical means. That is to say, through the organic combination of design and construction, the influence of cracks can be prevented from being harmful.
文摘The pouring of mass concrete and earthwork account for a large proportion in building construction,which can play a decisive role in the quality of the building.Therefore,it is necessary to understand the technology of earthwork and concrete engineering in the process of building construction and propose reasonable application strategies.
文摘With the continuous development of China's economy and science, the construction industry has made some progress in the process of development. The quality of site management is obviously conducive to the smooth implementation of construction projects. Management must pay attention to the basic requirements of on-site management quality, pay attention to the optimal allocation and resource utilization, actively strengthen the management and coordination of project costs, reduce working hours, fully reflect the important value and role of orderly management, reduce the possibility of quality and safety accidents.
基金Supported by the China Postdoctoral Science Foundation(2013M531560)the Technology Innovation Plan in Traffic of Shandong Province(2012A15)the Science&Technology Development Projects of Shandong Province(2014GSF120015)
文摘In order to study the temperature distribution and the corresponding temperature effects on pre-stressed concrete(PC) curved box girder bridge in Shandong Province, this paper builds and adopts an automatic remote real-time temperature collection system to collect temperature data on site, and further uses the software ANSYS for analysis. Based on the comparisons between the measured data and the simulation results, the following conclusions can be drawn: 1 Our temperature monitoring system is reliable; 2 The corresponding measured data of the web plate and flange plate exposed to the sun, vary more severely than that at other positions, so these plates need higher standard design and construction requirements; 3 In the cold wave where still is sunshine, the box girder temperature effect behaves as sine-like curve.