Due to the variable output of renewable energy (RE) generation, difficulties of dispatching RE for power system operators could not be avoided. One of possible solutions is the energy storage technology, especially th...Due to the variable output of renewable energy (RE) generation, difficulties of dispatching RE for power system operators could not be avoided. One of possible solutions is the energy storage technology, especially the battery storage system. The large-scale energy storage system is available to support power system reliable flexibility for load following and system frequency regulation. In this paper, the bottlenecks of large-scale solar power generation dispatching and operation in Qinghai grid are discussed, and a new PV-energy storage coordinated dispatching method is proposed for reduction of PV curtailment in Qinghai. Moreover, the validation based on the time-series production simulation is provided using real data from Qinghai. The results indicate that the proposed method can effectively decrease the curtailment of solar power and future vision of large-scale solar power coordinated operation with energy storage system is also presented.展开更多
To investigate the nature of the Ψ(3770) resonance and to measure the cross section for e^+e^-→DD, a cross-section scan data sample, distributed among 41 center-of-mass energy points from 3.73 to 3.89 GeV, was ta...To investigate the nature of the Ψ(3770) resonance and to measure the cross section for e^+e^-→DD, a cross-section scan data sample, distributed among 41 center-of-mass energy points from 3.73 to 3.89 GeV, was taken with the BESIII detector operated at the BEPCII collider in the year 2010. By analyzing the large angle Bhabha scattering events, we measure the integrated luminosity of the data sample at each center-of-mass energy point. The total integrated luminosity of the data sample is 76.16±0.04±0.61 pb^-1, where the first uncertainty is statistical and the second systematic.展开更多
文摘Due to the variable output of renewable energy (RE) generation, difficulties of dispatching RE for power system operators could not be avoided. One of possible solutions is the energy storage technology, especially the battery storage system. The large-scale energy storage system is available to support power system reliable flexibility for load following and system frequency regulation. In this paper, the bottlenecks of large-scale solar power generation dispatching and operation in Qinghai grid are discussed, and a new PV-energy storage coordinated dispatching method is proposed for reduction of PV curtailment in Qinghai. Moreover, the validation based on the time-series production simulation is provided using real data from Qinghai. The results indicate that the proposed method can effectively decrease the curtailment of solar power and future vision of large-scale solar power coordinated operation with energy storage system is also presented.
基金Supported by National Key Basic Research Program of China(2015CB856700)National Natural Science Foundation of China(NSFC)(11235011,11335008,11425524,11625523,11635010)+13 种基金the Chinese Academy of Sciences(CAS)Large-Scale Scientific Facility Programthe CAS Center for Excellence in Particle Physics(CCEPP)Joint Large-Scale Scientific Facility Funds of the NSFCCAS(U1332201,U1532257,U1532258)CAS Key Research Program of Frontier Sciences(QYZDJ-SSW-SLH003,QYZDJ-SSW-SLH040)100 Talents Program of CASNational 1000 Talents Program of China,INPACShanghai Key Laboratory for Particle Physics and Cosmology,German Research Foundation DFG under Contracts Nos.Collaborative Research Center CRC 1044,FOR 2359Istituto Nazionale di Fisica Nucleare,Italy,Koninklijke Nederlandse Akademie van Wetenschappen(KNAW)(530-4CDP03)Ministry of Development of Turkey(DPT2006K-120470)National Science and Technology fundThe Swedish Research Council,U.S.Department of Energy(DEFG02-05ER41374,DE-SC-0010118,DE-SC-0010504,DE-SC-0012069)University of Groningen(RuG)and the Helmholtzzentrum fuer Schwerionenforschung GmbH(GSI)Darmstadt,WCU Program of National Research Foundation of Korea(R32-2008-000-10155-0)
文摘To investigate the nature of the Ψ(3770) resonance and to measure the cross section for e^+e^-→DD, a cross-section scan data sample, distributed among 41 center-of-mass energy points from 3.73 to 3.89 GeV, was taken with the BESIII detector operated at the BEPCII collider in the year 2010. By analyzing the large angle Bhabha scattering events, we measure the integrated luminosity of the data sample at each center-of-mass energy point. The total integrated luminosity of the data sample is 76.16±0.04±0.61 pb^-1, where the first uncertainty is statistical and the second systematic.