期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Centrifuge modelling of ground-borne vibrations induced by railway traffic in underground tunnels 被引量:3
1
作者 Yang Wenbo Qian Zhihao +4 位作者 tu jiulin Zhou Ziyang Yan Qixiang Fang Yong He Chuan 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2022年第2期517-528,共12页
Increased attention has been given to ground-borne vibrations induced by railway vehicles and to the effects of these vibrations as they propagate through the ground into nearby buildings.Various studies,mainly based ... Increased attention has been given to ground-borne vibrations induced by railway vehicles and to the effects of these vibrations as they propagate through the ground into nearby buildings.Various studies,mainly based on numerical methods as well as physical modelling,have been carried out to investigate this problem.To study the dynamic response of tunnels and the surrounding soil due to train-induced vibration loads,a centrifuge test was conducted with a small-scale model in 1 g and 50 g stress field environments.An aluminum tube was embedded in sand to model the underground tunnel.A small parallel pre-stressed actuator(PPA)was employed to apply vibration loads on the tunnel invert.The model responses were measured using accelerometers.Both time and frequency domain analyzes were performed.The test results demonstrated that electronic noise had a clear impact on the test results and should be eliminated.It also found that the dynamic response of both the tunnel and soil were affected by the stress field.Therefore,it is important to account for the stress field effects when assessing the ground-borne vibration from tunnels. 展开更多
关键词 centrifuge test stress field frequency response function peak particle acceleration dynamic response
在线阅读 下载PDF
市政道路斜交上跨既有地铁隧道影响研究
2
作者 涂玖林 王春森 何永辉 《交通节能与环保》 2023年第5期275-279,284,共6页
文章以东莞市某市政道路工程斜交上跨地铁1号线隧道为依托,采用Midas Gts Nx软件建立了“隧道-地层-路基”有限元模型,研究了市政道路斜交上跨既有地铁区间的影响规律,并考虑管片接头的影响,讨论了修正模型与接头模型的差异性。研究结... 文章以东莞市某市政道路工程斜交上跨地铁1号线隧道为依托,采用Midas Gts Nx软件建立了“隧道-地层-路基”有限元模型,研究了市政道路斜交上跨既有地铁区间的影响规律,并考虑管片接头的影响,讨论了修正模型与接头模型的差异性。研究结果表明:拟建道路施工导致的既有隧道的最大沉降量为1.72mm,小于规范要求的控制值,证明市政道路上跨施工是可行的;道路施工对既有隧道的影响范围大致在距交叉区30m范围内,并且在12m内最为明显;接头模型与修正模型在力学性能上具有明显的差异性,使得修正模型计算得到的沉降值和内力变化值均小于接头模型。 展开更多
关键词 城市地铁 斜交上跨 数值计算 市政道路 接头模拟
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部