Yima Coal Corporation is considering to adopt highwall mining method withauger machine to recover coal from north surface pit that has reached final highwall position. Themajor geomechanical issues associated with aug...Yima Coal Corporation is considering to adopt highwall mining method withauger machine to recover coal from north surface pit that has reached final highwall position. Themajor geomechanical issues associated with auger mining are highwall and pillar stability. Based onthe field investigation and laboratory test results of mechanical parameters, numerical modeling iscarried out to assess the stability of highwall and pillar. Field measurements of highwalldeformation have been used to validate and ensure the confidence for the development of realisticmodels. The results of numerical modeling show that the mining method is feasible for mining theseam of 10 m thickness in north surface coal mine.展开更多
文摘Yima Coal Corporation is considering to adopt highwall mining method withauger machine to recover coal from north surface pit that has reached final highwall position. Themajor geomechanical issues associated with auger mining are highwall and pillar stability. Based onthe field investigation and laboratory test results of mechanical parameters, numerical modeling iscarried out to assess the stability of highwall and pillar. Field measurements of highwalldeformation have been used to validate and ensure the confidence for the development of realisticmodels. The results of numerical modeling show that the mining method is feasible for mining theseam of 10 m thickness in north surface coal mine.