期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Soft Site Swap and Cutover in WCDMA Network
1
作者 Lei Zengping shi hanjun Sun Yi 《ZTE Communications》 2007年第4期46-49,共4页
Traditionally,when a radio network site is swapped,it is necessary to interrupt existing services and perform a step-by-step serial cutover,which involves complex arrangements and huge resource investments.Therefore,t... Traditionally,when a radio network site is swapped,it is necessary to interrupt existing services and perform a step-by-step serial cutover,which involves complex arrangements and huge resource investments.Therefore,there is an urgent need to discuss a fast and low-risk solution for site moving and cutover.ZTE Base Band Unit and Remote Radio Unit(BBU+RRU)Node B adopts distributed structure and combines full frequency reuse of the WCDMA system to conveniently implement soft site moving and cutover.The solution is to build an overlay network and make a one-time cutover without any impact on the operation of the existing network.Moreover,it supports timely fallback,and can considerably simplify the site moving and cutover operation and lower the network risk. 展开更多
关键词 WCDMA Radio RRU BBU SITE
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部