Correction to:Radiation Detection Technology and Methods(2024)8:1-1105.https://doi.org/10.1007/s41605-024-00463-y.In this article all authors name was missing in the springer link.It has been corrected.The original ar...Correction to:Radiation Detection Technology and Methods(2024)8:1-1105.https://doi.org/10.1007/s41605-024-00463-y.In this article all authors name was missing in the springer link.It has been corrected.The original article has been corrected.展开更多
The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 3...The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 30 GeV Linac,a 1.1 GeV Damping Ring,a Booster capable of achieving energies up to 180 GeV,and a Collider operating at varying energy modes(Z,W,H,and tt).The Linac and Damping Ring are situated on the surface,while the subterranean Booster and Collider are housed in a 100 km circumference underground tunnel,strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider(SPPC).The CEPC primarily serves as a Higgs factory.In its baseline design with synchrotron radiation(SR)power of 30 MW per beam,it can achieve a luminosity of 5×10^(34)cm^(-2)s^(-1)per interaction point(IP),resulting in an integrated luminosity of 13 ab^(-1)for two IPs over a decade,producing 2.6 million Higgs bosons.Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons,facilitating precise measurements of Higgs coupling at sub-percent levels,exceeding the precision expected from the HL-LHC by an order of magnitude.This Technical Design Report(TDR)follows the Preliminary Conceptual Design Report(Pre-CDR,2015)and the Conceptual Design Report(CDR,2018),comprehensively detailing the machine's layout,performance metrics,physical design and analysis,technical systems design,R&D and prototyping efforts,and associated civil engineering aspects.Additionally,it includes a cost estimate and a preliminary construction timeline,establishing a framework for forthcoming engineering design phase and site selection procedures.Construction is anticipated to begin around 2027-2028,pending government approval,with an estimated duration of 8 years.The commencement of experiments and data collection could potentially be initiated in the mid-2030s.展开更多
Background The current strategy to achieve high luminosity for high energy physics experiments is to store huge currents distributed in many bunches in circular machines such as BEPCII,so the longitudinal coupled bunc...Background The current strategy to achieve high luminosity for high energy physics experiments is to store huge currents distributed in many bunches in circular machines such as BEPCII,so the longitudinal coupled bunch instabilities of the beam are inevitable.Purpose Therefore,a longitudinal feedback system is needed to suppress longitudinal oscillation.Otherwise,the beam energy spread will increase;the luminosity and the beam lifetime will decrease under a certain beam current.Methods For filter design of the feedback system,the time domain least square fitting(TDLSF)method is compared to the selective wave filter method;digital signal processing electronics based on commercial board have been developed and tested on BEPCII.Results The final result shows that the self-developed longitudinal feedback system can suppress the longitudinal beam oscillation at 750 mA beam current and meet the requirements of BEPCII;the restrain depth to the sidebands reaches to 40.8 dB.展开更多
文摘Correction to:Radiation Detection Technology and Methods(2024)8:1-1105.https://doi.org/10.1007/s41605-024-00463-y.In this article all authors name was missing in the springer link.It has been corrected.The original article has been corrected.
基金support from diverse funding sources,including the National Key Program for S&T Research and Development of the Ministry of Science and Technology(MOST),Yifang Wang's Science Studio of the Ten Thousand Talents Project,the CAS Key Foreign Cooperation Grant,the National Natural Science Foundation of China(NSFC)Beijing Municipal Science&Technology Commission,the CAS Focused Science Grant,the IHEP Innovation Grant,the CAS Lead Special Training Programthe CAS Center for Excellence in Particle Physics,the CAS International Partnership Program,and the CAS/SAFEA International Partnership Program for Creative Research Teams.
文摘The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 30 GeV Linac,a 1.1 GeV Damping Ring,a Booster capable of achieving energies up to 180 GeV,and a Collider operating at varying energy modes(Z,W,H,and tt).The Linac and Damping Ring are situated on the surface,while the subterranean Booster and Collider are housed in a 100 km circumference underground tunnel,strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider(SPPC).The CEPC primarily serves as a Higgs factory.In its baseline design with synchrotron radiation(SR)power of 30 MW per beam,it can achieve a luminosity of 5×10^(34)cm^(-2)s^(-1)per interaction point(IP),resulting in an integrated luminosity of 13 ab^(-1)for two IPs over a decade,producing 2.6 million Higgs bosons.Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons,facilitating precise measurements of Higgs coupling at sub-percent levels,exceeding the precision expected from the HL-LHC by an order of magnitude.This Technical Design Report(TDR)follows the Preliminary Conceptual Design Report(Pre-CDR,2015)and the Conceptual Design Report(CDR,2018),comprehensively detailing the machine's layout,performance metrics,physical design and analysis,technical systems design,R&D and prototyping efforts,and associated civil engineering aspects.Additionally,it includes a cost estimate and a preliminary construction timeline,establishing a framework for forthcoming engineering design phase and site selection procedures.Construction is anticipated to begin around 2027-2028,pending government approval,with an estimated duration of 8 years.The commencement of experiments and data collection could potentially be initiated in the mid-2030s.
文摘Background The current strategy to achieve high luminosity for high energy physics experiments is to store huge currents distributed in many bunches in circular machines such as BEPCII,so the longitudinal coupled bunch instabilities of the beam are inevitable.Purpose Therefore,a longitudinal feedback system is needed to suppress longitudinal oscillation.Otherwise,the beam energy spread will increase;the luminosity and the beam lifetime will decrease under a certain beam current.Methods For filter design of the feedback system,the time domain least square fitting(TDLSF)method is compared to the selective wave filter method;digital signal processing electronics based on commercial board have been developed and tested on BEPCII.Results The final result shows that the self-developed longitudinal feedback system can suppress the longitudinal beam oscillation at 750 mA beam current and meet the requirements of BEPCII;the restrain depth to the sidebands reaches to 40.8 dB.