Romashkino oil field has large oilfield area, small formation dip, many reservoir layers, wide oil-water transition zone and complicated sedimentary environment. Since development, 3 overall development plannings and ...Romashkino oil field has large oilfield area, small formation dip, many reservoir layers, wide oil-water transition zone and complicated sedimentary environment. Since development, 3 overall development plannings and adjustments of individual block have been established. This achieves a high oil production. However, the recoverable reserves of major oil layer with high production become smaller and smaller and the water cut increases over time, the production ability of oil layer decreases. The development status of oil layer of mining siltstone, oil-water transition zone and oil layer with upswept injected water cannot be changed under present dilute well network condition, because there is no reinforced measurement to water well. This results the low oil production of Romashkino oil field. In order to improve oil production rate and reach the designed oil recovery, Romashkino oil field has been implemented many added cuttings since development. Resent researches about Romashkino oil field show: in later oilfield development stage, sidetrack and lateral drilling horizontal wells technology is very reasonable;formation hydraulic fracturing technology has been widely used in recent years;in tertiary oil recovery, sweep efficiency and flooding efficiency related technologies have been taken. This offers reference and guidance for the effective and reasonable oil field development in later period.展开更多
LiCoO2 surface layer is proposed and prepared through sol-gel method. The physical and electrochemical performances of pristine LiMn2O4 and LiCoO2-coated LiMn2O4 cathode materials were investigated by X-ray diffractio...LiCoO2 surface layer is proposed and prepared through sol-gel method. The physical and electrochemical performances of pristine LiMn2O4 and LiCoO2-coated LiMn2O4 cathode materials were investigated by X-ray diffraction, scanning electron microscopy, transmission electron microscopy, electrochemical measurements respectively. Comparing with the pristine LiMn2O4, the LiCoO2- coated LiMn2O4 phase significantly improved cycling stability, especially at 55°C. Additionally, the thermal safety of LiMn2O4 is greatly enhanced after being coated by LiCoO2. ICP-AES measurement, structural analysis, and impedance experiments indicate that the improved electrochemical property of LiCoO2-coated LiMn2O4 should be attributed to the alleviated dissolution loss of manganese, strengthened structural stability.展开更多
To enhance the electrochemical performances of LiMn2O4 at elevated temperature (55°C), we proposed a sol-gel method to synthesize LiNi0.5Mn1.5O4 modified LiMn2O4. The physical and electrochemical performances of ...To enhance the electrochemical performances of LiMn2O4 at elevated temperature (55°C), we proposed a sol-gel method to synthesize LiNi0.5Mn1.5O4 modified LiMn2O4. The physical and electrochemical performances of pristine and LiNi0.5Mn1.5O4-coated LiMn2O4 cathode materials were investigated by X-ray diffraction, scanning electron microscopy, transmission electron microscopy, X-ray photoelectron spectroscopy and electrochemical measurements, respectively. The results indicated that about 4-5 nm thick layer of LiNi0.5Mn1.5O4 was formed on the surface of the LiMn2O4 powders. The modified LiMn2O4 exhibited excellent storage performance at 55°C compared to the pristine one, which was attributed to the suppression of electrolyte decomposition and the reduction of Mn dissolution.展开更多
In view of the existing situation of gas field development, one kind of method to evaluate the production performance of gas production units (GPUs) was presented in this paper. Among the commonly used indicators of g...In view of the existing situation of gas field development, one kind of method to evaluate the production performance of gas production units (GPUs) was presented in this paper. Among the commonly used indicators of gas field development, we select 11 indicators from the three aspects of production task, gas reservoir management, and production technology. According to the principle of analytic network process (ANP), this paper introduced one kind of new method to get the weights of indicators. By means of the method of TOPSIS, it is easy to obtain the rankings for all the GPUs through calculating the weighted Euclidean distance between each GPU and the positive or negative ideal point. This evaluation method could constantly improve the management level of gas production units and deepen the delicacy management of gas field development.展开更多
Feasibility of oil production predicting results influences the annual planning and long-term field development plan of oil field, so the selection of predicting models plays a core role. In this paper, three differen...Feasibility of oil production predicting results influences the annual planning and long-term field development plan of oil field, so the selection of predicting models plays a core role. In this paper, three different predicting models are introduced, they are neural network model, support vector machine model and GM (1, 1) model. By using these three different models to predict the oil production in XINJIANG oilfield in China, advantages and disadvantages of these models have been discussed. The predicting results show: the fitting accuracy by the neural network model or by the support vector machine model is higher than GM (1, 1) model, the prediction error is smaller than 10%, so neural network model and support vector machine model can be used to short-term forecast of oil production;predicting accuracy by GM (1, 1) model is not good, but the curve trend with GM (1, 1) model is consistent with the downward trend in oil production, so GM (1, 1) predicting model can be used to long-term prediction of oil production.展开更多
Analysis of the particularity of the civil aviation passenger auxiliary service recommendation scenario.As application of the traditional recommendation algorithm has certain limitation in civil aviation auxiliary ser...Analysis of the particularity of the civil aviation passenger auxiliary service recommendation scenario.As application of the traditional recommendation algorithm has certain limitation in civil aviation auxiliary services recommendation,a SVR recommendation algorithm of auxiliary service of civil aviation based on context-awareness was proposed.Analysis of the civil aviation passenger travel data,construct the civil aviation passenger preference model,then recommend auxiliary service for passengers.Based on the traditional two-dimensional user-item recommendation,considering the user characteristics,item attributes and user contextual information in the process of recommendation,which can effectively reduce the data sparseness in some degree.In addition,when there is a new user or a new item,whose similar users or items can be found according to the user or item attributes,to some extent,which can solve the problem of cold start.The experimental results show that the algorithm can recommend auxiliary service for passengers more accurately,which can provide convenience for passengers as well as increase the quality of airlines’services.展开更多
Aviation data analysis can help airlines to understand passenger needs,so as to provide passengers with more sophisticated and better services.How to explore the implicit message and analyze contained features from la...Aviation data analysis can help airlines to understand passenger needs,so as to provide passengers with more sophisticated and better services.How to explore the implicit message and analyze contained features from large amounts of data has become an important issue in the civil aviation passenger data analysis process.The uncertainty analysis and visualization methods of data record and property measurement are offered in this paper,based on the visual analysis and uncertainty measure theory combined with parallel coordinates,radar chart,histogram,pixel chart and good interaction.At the same time,the data source expression clearly shows the uncertainty and hidden information as an information base for passengers’service展开更多
The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanw...The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanwhile, it can effectively improve the operational efficiency of enterprise assets, lower operating costs and save resources. In June 1974, A. Gordon published a paper “3L Economics Concept” as the starting point, on the “Building and Quantity Surveying”, which is organized by the Royal Institution of Chartered Surveyors. In this paper, a review of domestic and foreign research, from 1974 to 2015, on the total life cycle management progress will be given, and then a comment on it will be established. After detailed investigation and analysis of related materials, we can draw a conclusion: the study of the oil and gas development project lifecycle management is just beginning now. Hence, building the whole life cycle planning index system in line with the characteristics of oil and gas development project is very necessary.展开更多
文摘Romashkino oil field has large oilfield area, small formation dip, many reservoir layers, wide oil-water transition zone and complicated sedimentary environment. Since development, 3 overall development plannings and adjustments of individual block have been established. This achieves a high oil production. However, the recoverable reserves of major oil layer with high production become smaller and smaller and the water cut increases over time, the production ability of oil layer decreases. The development status of oil layer of mining siltstone, oil-water transition zone and oil layer with upswept injected water cannot be changed under present dilute well network condition, because there is no reinforced measurement to water well. This results the low oil production of Romashkino oil field. In order to improve oil production rate and reach the designed oil recovery, Romashkino oil field has been implemented many added cuttings since development. Resent researches about Romashkino oil field show: in later oilfield development stage, sidetrack and lateral drilling horizontal wells technology is very reasonable;formation hydraulic fracturing technology has been widely used in recent years;in tertiary oil recovery, sweep efficiency and flooding efficiency related technologies have been taken. This offers reference and guidance for the effective and reasonable oil field development in later period.
文摘LiCoO2 surface layer is proposed and prepared through sol-gel method. The physical and electrochemical performances of pristine LiMn2O4 and LiCoO2-coated LiMn2O4 cathode materials were investigated by X-ray diffraction, scanning electron microscopy, transmission electron microscopy, electrochemical measurements respectively. Comparing with the pristine LiMn2O4, the LiCoO2- coated LiMn2O4 phase significantly improved cycling stability, especially at 55°C. Additionally, the thermal safety of LiMn2O4 is greatly enhanced after being coated by LiCoO2. ICP-AES measurement, structural analysis, and impedance experiments indicate that the improved electrochemical property of LiCoO2-coated LiMn2O4 should be attributed to the alleviated dissolution loss of manganese, strengthened structural stability.
文摘To enhance the electrochemical performances of LiMn2O4 at elevated temperature (55°C), we proposed a sol-gel method to synthesize LiNi0.5Mn1.5O4 modified LiMn2O4. The physical and electrochemical performances of pristine and LiNi0.5Mn1.5O4-coated LiMn2O4 cathode materials were investigated by X-ray diffraction, scanning electron microscopy, transmission electron microscopy, X-ray photoelectron spectroscopy and electrochemical measurements, respectively. The results indicated that about 4-5 nm thick layer of LiNi0.5Mn1.5O4 was formed on the surface of the LiMn2O4 powders. The modified LiMn2O4 exhibited excellent storage performance at 55°C compared to the pristine one, which was attributed to the suppression of electrolyte decomposition and the reduction of Mn dissolution.
文摘In view of the existing situation of gas field development, one kind of method to evaluate the production performance of gas production units (GPUs) was presented in this paper. Among the commonly used indicators of gas field development, we select 11 indicators from the three aspects of production task, gas reservoir management, and production technology. According to the principle of analytic network process (ANP), this paper introduced one kind of new method to get the weights of indicators. By means of the method of TOPSIS, it is easy to obtain the rankings for all the GPUs through calculating the weighted Euclidean distance between each GPU and the positive or negative ideal point. This evaluation method could constantly improve the management level of gas production units and deepen the delicacy management of gas field development.
文摘Feasibility of oil production predicting results influences the annual planning and long-term field development plan of oil field, so the selection of predicting models plays a core role. In this paper, three different predicting models are introduced, they are neural network model, support vector machine model and GM (1, 1) model. By using these three different models to predict the oil production in XINJIANG oilfield in China, advantages and disadvantages of these models have been discussed. The predicting results show: the fitting accuracy by the neural network model or by the support vector machine model is higher than GM (1, 1) model, the prediction error is smaller than 10%, so neural network model and support vector machine model can be used to short-term forecast of oil production;predicting accuracy by GM (1, 1) model is not good, but the curve trend with GM (1, 1) model is consistent with the downward trend in oil production, so GM (1, 1) predicting model can be used to long-term prediction of oil production.
文摘Analysis of the particularity of the civil aviation passenger auxiliary service recommendation scenario.As application of the traditional recommendation algorithm has certain limitation in civil aviation auxiliary services recommendation,a SVR recommendation algorithm of auxiliary service of civil aviation based on context-awareness was proposed.Analysis of the civil aviation passenger travel data,construct the civil aviation passenger preference model,then recommend auxiliary service for passengers.Based on the traditional two-dimensional user-item recommendation,considering the user characteristics,item attributes and user contextual information in the process of recommendation,which can effectively reduce the data sparseness in some degree.In addition,when there is a new user or a new item,whose similar users or items can be found according to the user or item attributes,to some extent,which can solve the problem of cold start.The experimental results show that the algorithm can recommend auxiliary service for passengers more accurately,which can provide convenience for passengers as well as increase the quality of airlines’services.
文摘Aviation data analysis can help airlines to understand passenger needs,so as to provide passengers with more sophisticated and better services.How to explore the implicit message and analyze contained features from large amounts of data has become an important issue in the civil aviation passenger data analysis process.The uncertainty analysis and visualization methods of data record and property measurement are offered in this paper,based on the visual analysis and uncertainty measure theory combined with parallel coordinates,radar chart,histogram,pixel chart and good interaction.At the same time,the data source expression clearly shows the uncertainty and hidden information as an information base for passengers’service
文摘The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanwhile, it can effectively improve the operational efficiency of enterprise assets, lower operating costs and save resources. In June 1974, A. Gordon published a paper “3L Economics Concept” as the starting point, on the “Building and Quantity Surveying”, which is organized by the Royal Institution of Chartered Surveyors. In this paper, a review of domestic and foreign research, from 1974 to 2015, on the total life cycle management progress will be given, and then a comment on it will be established. After detailed investigation and analysis of related materials, we can draw a conclusion: the study of the oil and gas development project lifecycle management is just beginning now. Hence, building the whole life cycle planning index system in line with the characteristics of oil and gas development project is very necessary.