Many hydropower projects have been constructed in Southwest China with the strategic goal of achieving carbon neutrality.Most of these hydropower projects utilize concrete face rockfilldams(CFRDs)built on a deep overb...Many hydropower projects have been constructed in Southwest China with the strategic goal of achieving carbon neutrality.Most of these hydropower projects utilize concrete face rockfilldams(CFRDs)built on a deep overburden layer.The deep overburden layer causes uneven settlement between the overburden layer and the dam,which poses a serious threat to the safety of both the construction and operation of the dam.In this study,microseismic(MS)monitoring technology was employed for the firsttime in the fieldof dam fillingengineering,allowing for the real-time monitoring of microfracture in the bedrock during dam construction.The time-frequency analysis method was used to summarize the MS waveform characteristics induced by dam filling.The fracture mechanism of bedrock was revealed,and the relationships among slope deformation,dam settlement,and MS activity were analyzed.The following research results have been obtained.The MS signal induced by dam fillinghas low energy and amplitude,short duration,and high frequency.The fracture of the bedrock was mainly shear failure.MS monitoring can predict deformation during blasting excavation and capture the large settlement that may occur during dam fillingin advance.Research findingshave demonstrated the significantapplication value of MS monitoring technology in predicting the risk of dam settlement and provide a reference for similar projects.展开更多
基金support from the Joint Funds of the National Natural Science Foundation of China(Grant No.42177143)the National Natural Science Foundation of China(Grant No.U23A2060).
文摘Many hydropower projects have been constructed in Southwest China with the strategic goal of achieving carbon neutrality.Most of these hydropower projects utilize concrete face rockfilldams(CFRDs)built on a deep overburden layer.The deep overburden layer causes uneven settlement between the overburden layer and the dam,which poses a serious threat to the safety of both the construction and operation of the dam.In this study,microseismic(MS)monitoring technology was employed for the firsttime in the fieldof dam fillingengineering,allowing for the real-time monitoring of microfracture in the bedrock during dam construction.The time-frequency analysis method was used to summarize the MS waveform characteristics induced by dam filling.The fracture mechanism of bedrock was revealed,and the relationships among slope deformation,dam settlement,and MS activity were analyzed.The following research results have been obtained.The MS signal induced by dam fillinghas low energy and amplitude,short duration,and high frequency.The fracture of the bedrock was mainly shear failure.MS monitoring can predict deformation during blasting excavation and capture the large settlement that may occur during dam fillingin advance.Research findingshave demonstrated the significantapplication value of MS monitoring technology in predicting the risk of dam settlement and provide a reference for similar projects.