期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Integrating models of real aboveground scene and underground geological structures at an open pit mine
1
作者 Biao DONG Wenjun TAN +4 位作者 Weichao CHANG baoting li Yanliang GUO Quanxing HU Guangwei liU 《虚拟现实与智能硬件(中英文)》 2025年第4期406-420,共15页
Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully ap... Background As information technology has advanced and been popularized,open pit mining has rapidly developed toward integration and digitization.The three-dimensional reconstruction technology has been successfully applied to geological reconstruction and modeling of surface scenes in open pit mines.However,an integrated modeling method for surface and underground mine sites has not been reported.Methods In this study,we propose an integrated modeling method for open pit mines that fuses a real scene on the surface with an underground geological model.Based on oblique photography,a real-scene model was established on the surface.Based on the surface-stitching method proposed,the upper and lower surfaces and sides of the model were constructed in stages to construct a complete underground three-dimensional geological model,and the aboveground and underground models were registered together to build an integrated open pit mine model.Results The oblique photography method used reconstructed a surface model of an open pit mine using a real scene.The surface-stitching algorithm proposed was compared with the ball-pivoting and Poisson algorithms,and the integrity of the reconstructed model was markedly superior to that of the other two reconstruction methods.In addition,the surface-stitching algorithm was applied to the reconstruction of different formation models and showed good stability and reconstruction efficiency.Finally,the aboveground and underground models were accurately fitted after registration to form an integrated model.Conclusions The proposed method can efficiently establish an integrated open pit model.Based on the integrated model,an open pit auxiliary planning system was designed and realized.It supports the functions of mining planning and output calculation,assists users in mining planning and operation management,and improves production efficiency and management levels. 展开更多
关键词 Three-dimensional reconstruction Computer graphics VISUALIZATION Integrated model Open pit mine
暂未订购
人工智能本科专业硬件基础课程教学改革与实践
2
作者 孙宏滨 刘龙军 +8 位作者 张旭翀 梅魁志 葛晨阳 张鸿 赵文哲 李宝婷 汪航 姚慧敏 郑南宁 《计算机教育》 2025年第12期14-18,共5页
针对人工智能专业硬件基础课程中存在的知识体系分散、教学内容滞后以及与智能应用场景脱节等问题,提出构建一体化设计的人工智能硬件课程体系,以系统性思维贯通式讲授“电路—模电—数电—体系结构”知识,阐述“研究性地教、探究性地... 针对人工智能专业硬件基础课程中存在的知识体系分散、教学内容滞后以及与智能应用场景脱节等问题,提出构建一体化设计的人工智能硬件课程体系,以系统性思维贯通式讲授“电路—模电—数电—体系结构”知识,阐述“研究性地教、探究性地学、创新性地做”核心教学理念。教学实践表明,该课程教学改革与实践有效提升学生的硬件基础能力、系统思维与软硬件协同创新能力。 展开更多
关键词 人工智能硬件课程 电路与架构 系统思维 AI芯片设计
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部