期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Comprehensive Analysis of 9-year Running Data of A^2/O-MBR in Xi an Siyuan University 被引量:8
1
作者 Xuemei ZHANG Jingyuan HAO +3 位作者 qinghua MA Dong LI Bo FU baolan qin 《Meteorological and Environmental Research》 CAS 2020年第5期139-143,共5页
Since September 2011,A 2/O-MBR wastewater treatment plant in Xi'an Siyuan University has been successfully running without replacing any of membrane modules.A total of 6.661 million m^3 of campus wastewater has be... Since September 2011,A 2/O-MBR wastewater treatment plant in Xi'an Siyuan University has been successfully running without replacing any of membrane modules.A total of 6.661 million m^3 of campus wastewater has been treated,and 4.405 million m^3 of water reaching the national urban miscellaneous water standard has been reclaimed and reused.A total of 25 km pipeline,5 pits,scenery fountains,lakes,and 12 pump stations have been constructed for flushing toilets,irrigating green grass lawn and afforest,and cleaning hardened pavement.The design and construction of 5 pits,scenery fountains,and lakes are important to meet the national urban miscellaneous water standard under occasional phosphorus and/or nitrogen exceed concentration.The unit water cost is 4.19 yuan/m^3,including membrane modules depreciation and amortization.After the A 2/O-MBR system passes the membrane modules depreciation and amortization period,the unit water cost is 2.82 yuan/m^3.The water productivity of the membrane stack rises first at the beginning of operation,reaches the maximum value,and then decreases.The average annual transmembrane pressure difference increases by 1.12 kPa.The average VMD of industrial permeability decreases annually by 0.45 m^3. 展开更多
关键词 Wastewater treatment and reuse system A 2/O-MBR system Economic feasibility Industrial permeability Membrane fouling
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部