A field test was conducted to investigate the distribution of temperature field and the variation of thermal stress for a prestressed concrete(PC)box-girder bridge.The change of hydration heat temperature consists of ...A field test was conducted to investigate the distribution of temperature field and the variation of thermal stress for a prestressed concrete(PC)box-girder bridge.The change of hydration heat temperature consists of four periods:temperature rising period,constant temperature period,rapid temperature fall period and stow temperature fall period.The peak value of hydration heat temperature increases with the increasing casting temperature of concrete;the relation between them is approximately linear.According to field tests,the thermal stress incurred by hydration heat may induce temperature cracks on the PC box-girder.Furthermore,the nonlinear distribution of temperature gradient and the fluctuation of thermal stress induced by exposure to sunlight were also obtained based on continuous in-situ monitoring.Such results show that the prevailing Chinese Code(2004)is insufficient since it does not take into account the temperature gradient of the bottom slab.Finally,some preventive measures against temperature cracks were proposed based on related studies.The conclusions can provide valuable reference for the design and construction of PC box-girder bridges.展开更多
Concrete box culverts are widely used in expressways in mountain areas.Many problems frequently take place due to improperly estimated vertical earth pressures on culverts.The prevailing Chinese General Code for Desig...Concrete box culverts are widely used in expressways in mountain areas.Many problems frequently take place due to improperly estimated vertical earth pressures on culverts.The prevailing Chinese General Code for Design of Highway Bridges and Culverts(CGCDHBC)stipulates the computation of the design load on culverts primarily based on the linear earth pressure theory,which cannot accurately describe the variation of the vertical load on culverts in trenches.In this paper,a full-scale experiment and numerical simulation were conducted to evaluate the variation of vertical earth pressures on culvert and soil arching in backfill.The variations of foundation pressure and settlement were also analyzed.The result revealed that the soil arch forms when the backfill on the culvert reaches a certain height.The soil arching effect reduces the stress concentration on the crown of the culvert but it is unstable.The vertical earth pressure on top of the culvert is significantly different from that recommended by the CGCDHBC.展开更多
文摘A field test was conducted to investigate the distribution of temperature field and the variation of thermal stress for a prestressed concrete(PC)box-girder bridge.The change of hydration heat temperature consists of four periods:temperature rising period,constant temperature period,rapid temperature fall period and stow temperature fall period.The peak value of hydration heat temperature increases with the increasing casting temperature of concrete;the relation between them is approximately linear.According to field tests,the thermal stress incurred by hydration heat may induce temperature cracks on the PC box-girder.Furthermore,the nonlinear distribution of temperature gradient and the fluctuation of thermal stress induced by exposure to sunlight were also obtained based on continuous in-situ monitoring.Such results show that the prevailing Chinese Code(2004)is insufficient since it does not take into account the temperature gradient of the bottom slab.Finally,some preventive measures against temperature cracks were proposed based on related studies.The conclusions can provide valuable reference for the design and construction of PC box-girder bridges.
基金supported by the Hubei Communications Department,P.R.China(Grant No.[2005]361).
文摘Concrete box culverts are widely used in expressways in mountain areas.Many problems frequently take place due to improperly estimated vertical earth pressures on culverts.The prevailing Chinese General Code for Design of Highway Bridges and Culverts(CGCDHBC)stipulates the computation of the design load on culverts primarily based on the linear earth pressure theory,which cannot accurately describe the variation of the vertical load on culverts in trenches.In this paper,a full-scale experiment and numerical simulation were conducted to evaluate the variation of vertical earth pressures on culvert and soil arching in backfill.The variations of foundation pressure and settlement were also analyzed.The result revealed that the soil arch forms when the backfill on the culvert reaches a certain height.The soil arching effect reduces the stress concentration on the crown of the culvert but it is unstable.The vertical earth pressure on top of the culvert is significantly different from that recommended by the CGCDHBC.