在黄浦江底2条圆隧道间首次设置长距离连接通道,并采用水平冻结土体暗挖施工方法;两岸暗埋段为2孔1管廊形式,采用地下连续墙围护和明挖法施工。工程在28个月建成通车,创黄浦江大型越江隧道施工最快记录。
Long - distance connecting passage between two round tunnels at the bottom of the Huang Pu River was firstly set up by using freezing - soil parallel buried excavation construction. Two hole one tube buried tunnels at both banks were constructed with diaphragm wall and open - cut method. It is expected that it will be opened to traffic within 28 months and set the highest record in the construction of large - scale tunnels cross - Huang Pu River.