摘要
宝钢炼铁厂成套引进的一期设备,自1985年9月投产并达到设计目标后,不断地加以完善和改进,取得了显著的技术进步和良好的生产指标,主要依靠国内设计制造的二期设备采用了许多当代世界最先进的技术。本文还提出了今后需要进一步研究解决的若干问题。
Started in sept. 1985 and achieved designing aims and improved successively then, the 1st project of ironmaking plant of Baoshan Iron & Steel Comlex, has acquired essential technological progress and producing data, several newest techniques in the world have been incorporated in the 2nd stage. This article describes the techniques applied in the 1st and new techniques in the 2nd stage. Some problems which must be solved in this decade are suggested.
出处
《钢铁》
CAS
CSCD
北大核心
1992年第11期53-58,共6页
Iron and Steel