摘要 以新疆大南湖二矿原岩工作面为研究对象,采用FLUENT 19.2软件建立露天煤矿工作面原岩注水预湿三维流场模型,分别分析注水成分、注水流速及注水压力等参数对露天煤矿原岩注水预湿效果的影响,并设计原岩粉尘注水预湿验证试验。结果表明:抑尘剂溶液注水预湿效果优于只使用水注水预湿效果;最佳注水流速为6 m/s,最佳注水压力为4 MPa;原岩粉尘注水预湿验证试验结果与数值模拟结果吻合。研究为实现露天煤矿工作面原岩注水预湿抑尘提供了理论依据。 Taking the raw rock working face of Xinjiang Dananhu No.2 Mine as the research object,the article adopts FLUENT 19.2 software to establish the three-dimensional flow field model of water injection and pre-wetting in the open-pit coal mine working face,and analyzes the effects of water injection composition,water injection flow rate and water injection pressure on the water injection and pre-wetting effect in the open-pit coal mine working face,and designs the validation test for raw rock dust the water injection and pre-wetting.The results show that the effect of dust suppressant solution water injection pre-wetting is better than that of water injection pre-wetting only;the optimal water injection flow rate is 6 m/s and the optimal water injection pressure is 4 MPa,respectively;and the results of water injection pre-wetting validation test of the raw rock dust coincide with the numerical simulation results.The study provides a theoretical basis for the realization of dust suppression by water injection and pre-wetting of raw rock in the working face of open-pit coal mines.
作者 赵晓亮 李一德 谢伟 ZHAO Xiaoliang;LI Yide;XIE Wei(Environmental Science and Engineering College,Liaoning Technical University,Fuxin 123000,China;Inner Mongolia Shendong Tianlong Group Co.,Ltd.,Ordos O17000,China)
出处 《露天采矿技术》 2025年第6期1-6,共6页 Opencast Mining Technology
基金 鄂尔多斯市科技突围“揭榜挂帅”重点资助项目(JBGS2024010) 国家重点研发计划资助项目(2019YFC1803801) 辽宁省教育厅理工类科研资助项目(LJ232410147061)。
关键词 露天煤矿 工作面 粉尘 注水预湿 数值模拟 open-pit coal mines working surface dust pre-wetting by water injection numerical simulation