既有铁路声屏障挖孔桩施工过程及保障措施

Construction Process and Guarantee Measures of Excavation Pile Holes for Existing Railway Sound Barriers
在线阅读 下载PDF
导出
摘要 以某工程为例,对铁路声屏障人工挖孔桩施工过程进行分析,重点介绍施工方法及施工流程,同时从质量保障措施、安全保障措施、应急管理预案3个维度进行施工保障措施阐述。该施工方法对周围环境影响小且成本低,适合工程总量较小的情形;配合相应的技术及安全控制措施,可以提高施工效率,保障施工安全。 Taking a certain actual project as an example,this article analyzes the construction process of manual excavation piles for railway sound barriers,focusing on the construction methods and processes.At the same time,it elaborates on the construction guarantee measures from three dimensions:quality assurance measures,safety assurance measures,and emergency management plans.This construction method has less impact on the surrounding environment and lower cost,making it suitable for situations with a small total project volume.By cooperating with corresponding technologies and safety control measures,construction efficiency can be improved and construction safety can be ensured.
作者 肖波 XIAO Bo(Beijing Engineering Project Management Department,China Railway Beijing Bureau Group Co.,Ltd.,Beijing 102627,China)
出处 《铁路节能环保与安全卫生》 2025年第4期34-37,共4页 Railway Energy Saving & Environmental Protection & Occupational Safety and Health
关键词 既有铁路 声屏障 挖孔桩 Existing railway Sound barrier Digging pile
  • 相关文献

参考文献9

二级参考文献20

  • 1GB/T50448-2008水泥基灌浆材料应用技术规范[S].
  • 2TZ203-2008客货共线铁路桥涵工程施工技术指南[S].2008.
  • 3TB/T3122-2005.铁路声屏障声学构件技术要求和测试方法[S].2.
  • 4铁路工务安全规则,铁运[2006]177号.
  • 5TBl0424-2003.铁路混凝土与砌体工程施工质量验收标准[s].
  • 6铁路技术管理规程.2007(32开).
  • 7TBl0751-2010高速铁路路基工程施工质量验收标准[s].
  • 8GB50205-2011,钢结构工程施工质量验收规范[S].
  • 9GB 5768-1999.道路交通标志和标线[S],1999.
  • 10TB 10203-2002.铁路桥涵施工规范[S],2002.

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部