摘要
不动压裂管柱压裂技术在不动管柱的前提下,对两个或两个以上目的层分级进行压裂施工,可大幅缩短施工周期,有效避免压裂液对储层的二次污染,提高试油压裂施工效率,实现绿色环保施工。以F128-34井施工实例验证了其配套工具的可靠性。
On the premise of the fixed string,fracturing technology of the fixed string is conduced operation for two or more than two objective layer,which can greatly shortens the operation period,effectively avoids the secondary pollution of the reservoir fracturing fluid,improves the efficiency of test and fracturing operations,and realizes the construction of green environmental protection. Taking F128-34 well as an example,the reliability of the supporting tools is verified.
出处
《油气井测试》
2015年第5期62-63,78,共2页
Well Testing
关键词
不动管柱
分层压裂
储层保护
施工周期
fixed string
layered fracturing
reservoir protection
operation