深井降水技术作为一种基础施工过程中降低水位的施工措施 ,确保了基础的正常施工和进度。从深井降水构造、井深和井位的确定、观察井及回灌井的布置、水泥浆喷桩止水帷幕的布置和深井降水的主要技术措施几方面进行了论述 。
The technique of lower water with deep well is used as the constructional measures of lower water in the precess of the foundation construction, ensures normal construction and rate of advance of foundation, discusses structure of lower water with deep well,definition of well depth and well position,arrangement of observation well and recharge well,cement paste pile curtain against water,main technical measure of lower water with deep well,explains that technique of lower water with deep well is widely used in construction.