鹤煤二矿二部猴车支护整修及保运行方案

The Support Renovation and Insurance Operation Scheme of Two Mine Ropeways in Hebi Coal Company No.2 Mine
在线阅读 下载PDF
导出
摘要 鹤煤二矿井下地质条件复杂,井下普遍压力较大、巷道变形严重,如不及时采取措施,二部猴车随时面临停运、瘫痪的可能。通过该方案的实施,整修期间没有出现任何工伤事故,而且巷道整体面貌焕然一新,为今后特殊支护段巷道整修积累了宝贵经验。 The geological condition in the mine of hebi coal company No.2 mine is complicated, the pressure is generally ~eat, and the roadway deformation is serious. If we do not take measures timely, the two mine ropeways may be off-stream and paralyzed at any time. Through the implementation of the scheme, there is no industrial injury accident during renovation period, and the overall appearance has a bright, new look. It accumulates valuable experience for roadway renovation in special supporting section.
作者 廉涛
出处 《价值工程》 2013年第19期112-113,共2页 Value Engineering
关键词 猴车保运行 特殊支护段整修 延长猴车寿命 insurance operation of mine ropeway the roadway renovation in special supporting section extend the life of the mine ropeway
  • 相关文献

参考文献3

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部