摘要
鹤煤二矿井下地质条件复杂,井下普遍压力较大、巷道变形严重,如不及时采取措施,二部猴车随时面临停运、瘫痪的可能。通过该方案的实施,整修期间没有出现任何工伤事故,而且巷道整体面貌焕然一新,为今后特殊支护段巷道整修积累了宝贵经验。
The geological condition in the mine of hebi coal company No.2 mine is complicated, the pressure is generally ~eat, and the roadway deformation is serious. If we do not take measures timely, the two mine ropeways may be off-stream and paralyzed at any time. Through the implementation of the scheme, there is no industrial injury accident during renovation period, and the overall appearance has a bright, new look. It accumulates valuable experience for roadway renovation in special supporting section.
出处
《价值工程》
2013年第19期112-113,共2页
Value Engineering
关键词
猴车保运行
特殊支护段整修
延长猴车寿命
insurance operation of mine ropeway
the roadway renovation in special supporting section
extend the life of the mine ropeway