期刊文献+

西气东输二线冰堵问题与处理 被引量:5

Ice blockage problem in the 2nd West-to-East Gas Pipeline and its solutions
原文传递
导出
摘要 针对西气东输二线管道因站场卧式过滤分离器冰堵而无法正常运行的问题,对红柳站冰堵问题进行分析,结果表明:红柳站天然气进站温度过低、烟墩-红柳站间管段高程差较大以及管道输量的增加是冰堵发生的主要原因。详细阐述了更换过滤分离器滤芯、掺混西气东输一线高温天然气和注醇、烟墩站启动压缩机增压等处理冰堵问题的方法与措施,提出了西气东输二线预防和处理冰堵的相关建议。 The 2nd West-to-East Gas Pipeline can not normally run due to ice blockage.Researchers analyze the problem in Hongliu Compressor Station.Results show that the inlet gas temperature in Hongliu Compressor Station is low,the elevation of the pipeline section between Yandun-Hongliu Compressor Station is great,and the increase of pipeline throughput is the main reason for ice blockage.Solutions to the ice blockage are given,such as replacement of filter elements,mixing high-temperature gas from the 1st West-to-East Gas Pipeline and alcohol injection,starting up the compressors of Yandun Compressor Station.Suggestions to prevent and treat ice blockage in the 2nd West-to-East Gas Pipeline are presented.
出处 《油气储运》 CAS 2012年第8期636-639,647,共4页 Oil & Gas Storage and Transportation
关键词 输气管道 水合物 过滤分离器 注醇 gas pipeline,hydrate,filter separator,alcohol injection
  • 相关文献

参考文献5

二级参考文献71

共引文献76

同被引文献48

引证文献5

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部