黄冈公铁两用长江大桥桥塔墩顶4个节间钢梁架设方案 被引量:26

Erection Scheme for Four Panels of Steel Truss Girders at Top of Pylon Pier of Huanggang Changjiang River Rail-cum-Road Bridge
在线阅读 下载PDF
导出
摘要 黄冈公铁两用长江大桥主桥钢梁总体架设采用散拼架设方案。为解决浮吊资源问题,结合钢梁总体架设方案,通过架梁吊机和临时支架的安装及架梁吊机在此站位情况下实现墩顶节间钢梁架设的可行性研究,确定该桥塔墩顶4个节间钢梁架设方案为:先利用浮吊趁高水位时在墩旁托架上安装1个临时支架,然后在此临时支架上安装1台WD70C型架梁吊机,利用该架梁吊机完成墩顶4节间钢梁的架设工作。目前,利用该方案已完成第1个节间的钢梁架设,验证了该方案的可行性。 The overall erection scheme for the steel truss girders of the main bridge of Huanggang Changjiang River Rail-cum-Road Bridge is mainly the scheme of piece-by-piece assem- bling and erection. To cope with the problem of availability of suitable large floating crane and in the light of the overall erection scheme, the feasibility of erecting the panels of the steel truss girders at the top of pylon pier by installing the girder erection crane and temporary support and also by mounting the crane on the support was studied, and it was determined through the study that the erection scheme for the four panels of the steel truss girders at the top of the pylon pier of the bridge was specifically as follows: a floating crane was firstly used to install a temporary support on the pier-side bracket at the time of high water level, a WD70C girder erection crane was then mounted on the temporary support and the girder erection crane was used to complete the erection of the four panels of the girders at the top of the pylon pier. Presently, the erection of a panel of the girders has been Smoothly completed and the feasibility of the erection scheme is hence well verified.
作者 邓永锋
出处 《桥梁建设》 EI CSCD 北大核心 2012年第2期7-12,共6页 Bridge Construction
关键词 公路铁路两用桥 斜拉桥 钢桁梁 桥梁架设 桥梁施工 rail-cum-road bridge cable-stayed bridge steel truss girder bridge erection bridge construction
  • 相关文献

参考文献10

二级参考文献20

  • 1肖海珠,高宗余.郑州黄河公铁两用桥主桥结构设计[J].铁道勘察,2007,33(Z1):30-34.
  • 2张拥军,蒋卫东.超宽斜拉桥塔梁同步施工方案与控制技术[J].公路交通科技(应用技术版),2009,5(5):172-175. 被引量:10
  • 3高宗余.武汉天兴洲公铁两用长江大桥总体设计[J].桥梁建设,2007,37(1):5-9. 被引量:47
  • 4潘东发,李军堂.南京大胜关长江大桥钢梁安装方案研究[J].桥梁建设,2007,37(3):5-8. 被引量:23
  • 5中铁大桥勘测设计院有限公司.南京大胜关长江大桥初步设计[R].武汉,2006.
  • 6交通部第二公路勘察设计研究院.汕头至昆明高速公路贵州境马岭河特大桥设计文件[R].武汉:交通部第二公路勘察设计研究院,2006.
  • 7强士中.桥梁工程[M].北京:高等教育出版社,2006.
  • 8WANG Rong-hui, HUANG Yong-hui, LI Qiu-sheng, et al. Model Test and Numerical Analysis of a Special Joint for a Truss Bridge[J]. Journal of Constructional Steel Research, 2009,65 (6) :1261-1268.
  • 9AZIZINAMINI A. Full Scale Testing of Old Steel Truss Bridge [J]. Journal of Constructional Steel Research, 2002,(58) : 843-858.
  • 10KISS K, DUNAI L. Stress History Generation for Truss Bridges Using Multi-level Models E J-. Computers and Structures,2000, 78(1) :329-339.

共引文献107

同被引文献129

引证文献26

二级引证文献271

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部