武汉东湖高新区应用热电冷联产的可行性分析 被引量:1

Feasibility analysis of CCHP in Wuhan east lake new and high-tech demonstration zone
在线阅读 下载PDF
导出
摘要 针对冷热电三联供技术在武汉东湖高新区中的应用进行了分析与研究,并重点针对九龙生物产业园周边的热电厂的分布,来划分园区不同的供能区域以形成分布式能源。同时分析了蒸汽供给参数以及影响项目经济指标的敏感性因素,并提出了改善项目经济性的参考建议。 Jiulong biological industrial park is a part of Wuhan east lake new and high-tech demonstration zone. In this paper, applications of combined cooling, heating and power supply system (CCHP) are analyzed and researched. According to distribution of surrounding cogeneration plant, this industrial park is cut into different source area, and forms the distributed energy. Parameters of steam supply and sensitive factors affecting economical indices of the engineering project are analyzed and suggestions for improving project economy are made.
出处 《电力需求侧管理》 2012年第2期25-29,共5页 Power Demand Side Management
关键词 冷热电三联供 蒸汽 管网 生物产业园 CCHP steam piping net bilogical industrial park
  • 相关文献

参考文献4

  • 1田贯三,付林.“西气东输”中天然气合理应用方式研究[M].北京:中国建筑工业出版社,2009.
  • 2GB50189-2005.公共建筑节能设计标准[S].[S].,2005..
  • 3CJJ34-2002,城市热力管网设计规范[S].
  • 4Honton E J.Energy Balance and Cogeneration for a Cement Plant[J].Applied Thermal Engineering,2002,22(5):485-494.

共引文献375

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部