Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market

Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
在线阅读 下载PDF
导出
摘要 Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained.
出处 《Journal of Energy and Power Engineering》 2011年第5期466-473,共8页 能源与动力工程(美国大卫英文)
关键词 Hydroelectric power generation hydroelectric generators optimization methods electricity market. 市场利润 双边合同 水电站 优化操作 水力发电厂 基础 电力行业 能源市场
  • 相关文献

参考文献17

  • 1M. Shahidehpour, H. Yamin, Z. Li, Market Operations in Electric Power Systems: Forecasting, Scheduling, and Risk Management, John Wiley and Sons, NY, 2002.
  • 2L.A.F.M. Ferreira, S.J.P.S. Mariano, V.M.F. Mendes, Production scheduling: Regulation or deregulation?. - back to a theoretical basis, in: International Conference on Electric Utility Deregulation and Restructuring, and Power Technologies, 2000, pp. 655-659.
  • 3L.A.F.M. Ferreira, S.J.P.S. Mariano, V.M.F. Mendes, Restructuring models - A comparison based on numerical simulation results, in: IEEE PES Summer Meeting, 2000, pp. 2189-2194.
  • 4O.B. Fosso, A. Gjelsvik, A. Haugstad, B. Mo, I. Wangensteen, Generation scheduling in a deregulated system, the Norwegian case, IEEE Transactions on Power Systems 14 (1) (1999) 75-80.
  • 5J.P.S. Catal~o, S.J.P.S. Mariano, V.M.F. Mendes, L.A.F.M. Ferreira, Scheduling of head-sensitive cascaded hydro systems: A comparison based on numerical simulation results, in: 4th IASTED International Conference on Power and Energy Systems, 2004.
  • 6R.A. Ponrajah, J. Witherspoon, F.D. Galiana, Systems to optimise conversion efficiencies at Otanrio hydro's hydroelectric plants, Transactions on Power Systems 13 (3) (1998) 1044-1050.
  • 7S. Mariano, J. Catalao, V. Mendes, L. Ferreira, Power generation efficiency improvement in cascaded and head-dependent reservoirs, in: 15th Power Systems Computation Conference, 2005.
  • 8R. Tiainen, T. Lindh, J. Ahola, M. Niemela, V. Sakimaki, Energy price-based control strategy of a small-scale head-dependent, hydroelectric power plant, in: International Conference on Renewable Energies and Power Quality, 2008.
  • 9A.I. Cohen, V.R. Sherkat,, Optimisation-based methods for operations scheduling, Proceedings of the IEEE 75 (12) (1987) 1574-1591.
  • 10P. Nordlund, D. Sjelvgren, M.V.F. Pereira, J.A. Bubenco, Generation expansion planning for systems with a high share of hydro power, IEEE Transactions on Power Systems 2 (1) (1987) 161-167.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部