Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
摘要
Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participants are being faced with requirements for which they do not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule or a bilateral contract, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer. In this scenario the objective is to maximize the hydroelectric power plant profit from selling energy in the spot market or by means of bilateral contracts. In this paper the optimal operation of a head-dependent hydroelectric power station in bilateral market-short-term hourly hydro resource scheduling for energy is obtained.
参考文献17
-
1M. Shahidehpour, H. Yamin, Z. Li, Market Operations in Electric Power Systems: Forecasting, Scheduling, and Risk Management, John Wiley and Sons, NY, 2002.
-
2L.A.F.M. Ferreira, S.J.P.S. Mariano, V.M.F. Mendes, Production scheduling: Regulation or deregulation?. - back to a theoretical basis, in: International Conference on Electric Utility Deregulation and Restructuring, and Power Technologies, 2000, pp. 655-659.
-
3L.A.F.M. Ferreira, S.J.P.S. Mariano, V.M.F. Mendes, Restructuring models - A comparison based on numerical simulation results, in: IEEE PES Summer Meeting, 2000, pp. 2189-2194.
-
4O.B. Fosso, A. Gjelsvik, A. Haugstad, B. Mo, I. Wangensteen, Generation scheduling in a deregulated system, the Norwegian case, IEEE Transactions on Power Systems 14 (1) (1999) 75-80.
-
5J.P.S. Catal~o, S.J.P.S. Mariano, V.M.F. Mendes, L.A.F.M. Ferreira, Scheduling of head-sensitive cascaded hydro systems: A comparison based on numerical simulation results, in: 4th IASTED International Conference on Power and Energy Systems, 2004.
-
6R.A. Ponrajah, J. Witherspoon, F.D. Galiana, Systems to optimise conversion efficiencies at Otanrio hydro's hydroelectric plants, Transactions on Power Systems 13 (3) (1998) 1044-1050.
-
7S. Mariano, J. Catalao, V. Mendes, L. Ferreira, Power generation efficiency improvement in cascaded and head-dependent reservoirs, in: 15th Power Systems Computation Conference, 2005.
-
8R. Tiainen, T. Lindh, J. Ahola, M. Niemela, V. Sakimaki, Energy price-based control strategy of a small-scale head-dependent, hydroelectric power plant, in: International Conference on Renewable Energies and Power Quality, 2008.
-
9A.I. Cohen, V.R. Sherkat,, Optimisation-based methods for operations scheduling, Proceedings of the IEEE 75 (12) (1987) 1574-1591.
-
10P. Nordlund, D. Sjelvgren, M.V.F. Pereira, J.A. Bubenco, Generation expansion planning for systems with a high share of hydro power, IEEE Transactions on Power Systems 2 (1) (1987) 161-167.
-
1柏岭.电厂仿真机的多种用途[J].电力情报,1996(2):73-76.
-
2刘宝忠,李赫,丁化销.二分之三接线的优化操作探析[J].中国电力教育(下),2012(7):146-146.
-
3电力科技信息[J].中国电力,2004,37(1):61-61.
-
4阮继飞.谈水电施工中机电安装出现的问题及对策[J].青年科学(下半月),2014(1):29-29.
-
5中央空调:半数企业“不正规”[J].家电科技(维修与培训),2004(10):16-17.
-
6郭浩钢,杨媛媛.110kV变电站电压无功的优化控制对策[J].华东科技(学术版),2013(9):153-153.
-
7张永平,焦连伟,倪以信,文福拴,陈寿孙,吴复立.区域电力市场双边交易阻塞管理实用计算方法[J].电力系统自动化,2003,27(14):18-22. 被引量:11
-
8赵莉,傅海浩,杨明明,陈燎原.仿真培训系统在电厂中的应用[J].华电技术,2014,36(11):33-36.
-
9奢侈品中国二三线城市最赚钱[J].中国制衣,2012(6):10-10.
-
10Toshiaki Suzuki,Toshiaki Kanemoto.On-Cam Operation of Counter-Rotating Type Hydroelectric Unit[J].Journal of Energy and Power Engineering,2013,7(10):1966-1973. 被引量:1