摘要
以吴江市八坼京杭运河大桥工程转体施工为例,从转体施工工作原理、施工准备、锚固体系、转动体系、位控体系、落架、转动就位、封盘、合龙等施工环节,介绍转体施工的技术要点。
For the example of turning construction on the bridge of Jing-Hang canal in Bache Wujiang city, introduce the key point of turning construction technology based on the working principle of turning construction, construction preparation, anchor system, turning system, position control system, put down frame, turning and place to the position, shut.
出处
《工程质量》
2010年第12期46-48,共3页
Construction Quality
关键词
转体施工
技术
要点
turning construction
technology
key point