水布垭水利枢纽泄洪消能方案比较研究 被引量:4

Comparative Study on Schemes of Flood Discharge and Energy Dissipation for Shuibuya Project
在线阅读 下载PDF
导出
摘要 通过1∶165概化模型试验,探讨了适合该工程可能的消能型式。在1∶100整体模型和1∶88断面模型上分别研究了一级挑流消能方案和底流接挑流的二级消能方案的水力学特性,并结合溢洪道布置、工程量等对一、二级消能方案进行了综合比较,推荐一级消能方案为初设阶段的基本方案。 According to the features with high head,large unit discharge and worse geological condition downstream spillway of the shuibuya project ,a 1∶165 scale generalized model is used to study different dissipaters so as to select a fit one for the project.Then a 1∶100 scale comprehensive model and a 1∶80 scale sectional models are used to study hydraulic properties of the flip bucket dissipater and the combired dissipater with a stilling basin and a flip bucket respectively,Finally,the singal staged bucket dissipater is proposed as primary scheme of dissipater fo design.
机构地区 水工研究所
出处 《长江科学院院报》 EI CSCD 北大核心 1999年第1期4-8,共5页 Journal of Changjiang River Scientific Research Institute
关键词 溢洪道 消能 水利枢纽 泄洪 Spillway energy dissipation flip bucket dissipator combined dissipater with flipbucket and stilling basin
  • 相关文献

参考文献4

  • 1徐秉衡 栾力.泄水建筑物的破坏与防治[M].成都:成都科技大学出版社,1996..
  • 2徐秉衡,泄水建筑物的破坏与防治,1996年
  • 3郭子中,消能防冲原理与水力设计,1982年
  • 4吴持恭,水力学,1979年

同被引文献16

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部