摘要
本文介绍了邯郸中板厂二期改造托梁截柱工程的设计方法及其相关问题,在不停产条件下,将原混凝土结构厂房的6m柱距加大到12m和18m并且保留原屋面系统和吊车梁系统。该工程在原结构系统加固设计方面摸索了一条成功之路,为国内类似的老厂改造提供有效的方法和途径。
The design method and some related problems of cutting columns supported with blacket are introduced herein for phase two project of Handan middle plate plant.Under the conditions of production and keeping the form roofing and crane beam system,the columns' spaces of the former concrete structure is edlarged form 6m to 12m(or 18m).From the projecd a successful design method is grasped in the aspect of consolidating former structures,which provides a practical approach for reforming similar old plant.
出处
《工业建筑》
CSCD
北大核心
1995年第5期13-15,36,共4页
Industrial Construction
关键词
混凝土结构
托柱梁
截柱
灌注桩
设计
连系梁
beam supporting the column
cast in situ pile
linking bean