托梁截柱设计及相关问题 被引量:3

DESIGN AND PROBLEMS OF CUTTING COLUMNSUPPORTED WITH BARCKET
在线阅读 下载PDF
导出
摘要 本文介绍了邯郸中板厂二期改造托梁截柱工程的设计方法及其相关问题,在不停产条件下,将原混凝土结构厂房的6m柱距加大到12m和18m并且保留原屋面系统和吊车梁系统。该工程在原结构系统加固设计方面摸索了一条成功之路,为国内类似的老厂改造提供有效的方法和途径。 The design method and some related problems of cutting columns supported with blacket are introduced herein for phase two project of Handan middle plate plant.Under the conditions of production and keeping the form roofing and crane beam system,the columns' spaces of the former concrete structure is edlarged form 6m to 12m(or 18m).From the projecd a successful design method is grasped in the aspect of consolidating former structures,which provides a practical approach for reforming similar old plant.
出处 《工业建筑》 CSCD 北大核心 1995年第5期13-15,36,共4页 Industrial Construction
关键词 混凝土结构 托柱梁 截柱 灌注桩 设计 连系梁 beam supporting the column cast in situ pile linking bean cutted column
  • 相关文献

参考文献3

  • 1黎伟.不规则柱距厂房托梁拔柱[J].工业建筑,1992,22(2):49-52. 被引量:2
  • 2柴昶,黄元信.某厂改造中托梁换柱的设计与施工[J]工业建筑,1988(12).
  • 3崔旭中,丁志远.混合基础在老厂改造中的应用[J]工业建筑,1988(10).

共引文献1

同被引文献14

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部