摘要
概述了我国“八五”国家重点科技攻关项目——燃煤增压流化床燃气/蒸汽联合循环(PFBC-CC)中试电站的研究现况。介绍了该中试电站的规模、选址、系统、总体布置、关键技术、研究目标和实施计划。
Abstract A short review of the state of development work on a coal fired pressurized fluidized bed combustion combined cycle(PFBC-CC) pilot plant-one of thekey research projects of the eighth'Five Year'plan-is given in this paperwhich describes the plant's scale,location,system,key technical problems,general layout, objects of research and the construction schedule.
出处
《动力工程》
CSCD
1994年第6期1-6,共6页
Power Engineering